Comparison of Project Evaluation Using Cost-Benefit Analysis and Multi-Attribute Tradespace Exploration in the Transportation Domain
暂无分享,去创建一个
Adam M. Ross | Donna H. Rhodes | Julia Nickel | D. Rhodes | A. Ross | J. Nickel | A. Ross
[1] Harry J. Klingler. ENGINEERING AND MANAGEMENT , 1951 .
[2] R. L. Keeney,et al. Decisions with Multiple Objectives: Preferences and Value Trade-Offs , 1977, IEEE Transactions on Systems, Man, and Cybernetics.
[3] F. B. Vernadat,et al. Decisions with Multiple Objectives: Preferences and Value Tradeoffs , 1994 .
[4] Mao-Jiun J. Wang,et al. BENEFIT/COST ANALYSIS USING FUZZY CONCEPT , 1995 .
[5] Harry F. Campbell,et al. Benefit-Cost Analysis , 2001 .
[6] Nathan P. Diller,et al. Utilizing Multiple Attribute Tradespace Exploration with Concurrent Design for creating aerospace systems requirements , 2002 .
[7] Joseph M. Sussman,et al. Collected Views on Complexity in Systems , 2002 .
[8] Seth Lloyd. Complex systems: a review , 2002 .
[9] Lisa Heinzerling,et al. Pricing the Priceless: Cost-Benefit Analysis of Environmental Protection , 2002 .
[10] Adam Michael Ross,et al. Managing unarticulated value : changeability in multi-attribute tradespace exploration , 2006 .
[11] Daniel E. Hastings,et al. Assessing Changeability in Aerospace Systems Architecting and Design Using Dynamic Multi-Attribute Tradespace Exploration , 2006 .
[12] Darren Rivey,et al. A practical method for incorporating Real Options analysis into US federal benefit-cost analysis procedures , 2007 .
[13] Richard O. Zerbe,et al. Benefit-cost analysis , 2008 .
[14] D. Rhodes,et al. Trading Project Costs and Benefits in Multi-Attribute Tradespace Exploration , 2009 .