Sequencing, scheduling and tooling single-stage multifunctional machines in a small batch environment
暂无分享,去创建一个
[1] Quirico Semeraro,et al. Simulation of tool and part flow in FMSs , 1995 .
[2] J. Bard. A Heuristic for Minimizing the Number of Tool Switches on a Flexible Machine , 1988 .
[3] Hiroshi Katayama. FMS tool change schemes and their characteristics , 1994 .
[4] Gregory Levitin,et al. Algorithm for tool placement in an automatic tool change magazine , 1995 .
[5] Katsundo Hitomi,et al. Optimum Process Design for a Single-Stage Multifunctional Production System , 1981 .
[6] P.-H. Koo. Real-time operation and tool selection in single stage multimachine systems , 1999 .
[7] Jerry L. Sanders,et al. Performance analysis of a LIM-based high-speed tool delivery system for machining , 1994 .
[8] Kathryn E. Stecke,et al. A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems , 1986 .
[9] Steven A. Melnyk,et al. Tooling constraints and shop floor scheduling: A simulation study☆ , 1989 .
[10] Steven A. Melnyk,et al. Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency , 1992 .
[11] Kathryn E. Stecke,et al. Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .
[12] Kathryn E. Stecke,et al. A synthesis of decision models for tool management in automated manufacturing , 1993 .
[13] M. Selim Akturk,et al. Tool magazine arrangement and operations sequencing on CNC machines , 1996, Comput. Oper. Res..