Long-Term Deformation Analysis of the Jiudianxia Concrete-Faced Rockfill Dam
暂无分享,去创建一个
[1] A. Soroush,et al. DIRECT SHEAR TESTING ON A ROCKFILL MATERIAL , 2009 .
[2] Vassilis Gikas,et al. Settlement analysis of the Mornos earth dam (Greece): Evidence from numerical modeling and geodetic monitoring , 2008 .
[3] Reza Rahmannejad,et al. THE ESTIMATION OF ROCK MASS DEFORMATION MODULUS USING REGRESSION AND ARTIFICIAL NEURAL NETWORKS ANALYSIS , 2010 .
[4] Chang Xiaolin. Three dimension FEM numerical simulating of the rockfill creep of high concrete face rockfill dam , 2006 .
[5] James L. Sherard,et al. Concrete Face Rockfill Dams—Design, Construction, and Performance , 1985 .
[6] Michelle L. Oyen,et al. Load–displacement behavior during sharp indentation of viscous–elastic–plastic materials , 2003 .
[7] Lanru Jing,et al. A review of techniques, advances and outstanding issues in numerical modelling for rock mechanics and rock engineering , 2003 .
[8] Bingyin Zhang,et al. Time-dependent deformation in high concrete-faced rockfill dam and separation between concrete face slab and cushion layer , 2004 .
[9] Robin Fell,et al. Rockfill Modulus and Settlement of Concrete Face Rockfill Dams , 2003 .
[10] Chang Xiaolin,et al. Creep analysis of high concrete‐faced rockfill dam , 2010 .
[11] J. L. Justo,et al. Settlement-time behaviour of granular embankments , 2000 .
[12] Wei Zhou,et al. Settlement analysis of the Shuibuya concrete-face rockfill dam , 2011 .
[13] E. Maranha das Neves. Advances in rockfill structures , 1991 .