The Operations-Time Chart: A graphical tool to evaluate the performance of production systems - From batch-and-queue to lean manufacturing

In this paper, we describe the spreadsheet modeling of manufacturing systems by means of the Operations-Time Chart (hereafter, OT-Chart), a graphical tool for an automatic time-phased representation and measurement of the operation of production systems, developed by the authors. In order to improve the design of a production system, it is necessary to know the key performance metrics of the system (productivity, lead-time, inventories, downtimes and wait times) and identify the effects of design parameters on system performance. Calculating some of these magnitudes can be very complicated, especially for production systems involving multiple and confluent processes, with different cycle times and lot sizes. The OT-Chart permits a visual tracking of the aforementioned parameters throughout each process, and like a simulation tool, the program calculates and displays the effects of changing input parameters. A special version of the Chart has been designed for lean manufacturing environments, where visual tools are much appreciated. The OT-Chart provides tracking of different types of waste and supports inventory supermarkets and pull scheduling. The paper includes a case study: a plant is redesigned from a conventional batch-and-queue production system into a lean manufacturing system with the help of the OT-Chart (it is used to test the performance of each layout) allowing managers to evaluate and refine their designs.

[1]  Victor R. Prybutok,et al.  The relationship between JIT practices and type of production system , 2001 .

[2]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[3]  Rosemary R. Fullerton,et al.  The production performance benefits from JIT implementation , 2001 .

[4]  Harold J. Steudel,et al.  Analysis of a manufacturing system via spreadsheet analysis, rapid modelling, and manufacturing simulation , 1992 .

[5]  John Miltenburg,et al.  U-shaped production lines: A review of theory and practice , 2001 .

[6]  Roger G. Schroeder,et al.  The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .

[7]  Brahim Rekiek,et al.  State of art of optimization methods for assembly line design , 2002, Annu. Rev. Control..

[8]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[9]  S. Christian Albright,et al.  Data Analysis and Decision Making with Microsoft Excel , 1999 .

[10]  Nick Oliver,et al.  Lean Production Practices: International Comparisons in the Auto Components Industry1 , 1996 .

[11]  Yun Bae Kim,et al.  Supply chain simulation with discrete-continuous combined modeling , 2002 .

[12]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[13]  Pyung-Hoi Koo,et al.  Performance evaluation of manufacturing systems: a spreadsheet model , 1994 .

[14]  Soumen Ghosh,et al.  A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .

[15]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[16]  Shusaku Hiraki,et al.  A modeling approach to a JIT-based ordering system , 1997, Ann. Oper. Res..

[17]  Armin Scholl,et al.  State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..

[18]  Nesim Erkip,et al.  Simulation analysis of a JIT production line , 1991 .

[19]  Richard J. Linn,et al.  Hybrid flow shop scheduling: a survey , 1999 .

[20]  Berna Dengiz,et al.  Computer simulation of a PCB production line: metamodeling approach , 2000 .

[21]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[22]  Roy L. Harmon Reinventing the Factory: Productivity Breakthroughs in Manufacturing Today , 1989 .

[23]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[24]  S. G. Li,et al.  The reliable design of one-piece flow production system using fuzzy ant colony optimization , 2009, Comput. Oper. Res..