Critical lifting simulation of heavy industrial construction in gaming environment
暂无分享,去创建一个
[1] Ulrich Hermann,et al. An algorithm for the calculation of feasible mobile crane position areas , 2011 .
[2] Zhen-Zhong Hu,et al. BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies , 2011 .
[3] Xiangyu Wang,et al. Using affective human-machine interface to increase the operation performance in virtual construction crane training system: A novel approach , 2011 .
[4] Cheng Zhang,et al. Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency , 2012, Adv. Eng. Informatics.
[5] Hun Hee Cho,et al. A laser-technology-based lifting-path tracking system for a robotic tower crane , 2009 .
[6] Min-Yuan Cheng,et al. Particle bee algorithm for tower crane layout with material quantity supply and demand optimization , 2014 .
[7] Jing Du,et al. Zero latency: Real-time synchronization of BIM data in virtual reality for collaborative decision-making , 2018 .
[8] Mohamed Al-Hussein,et al. An Integrated System to Select, Position, and Simulate Mobile Cranes for Complex Industrial Projects , 2010 .
[9] Mohamed Al-Hussein,et al. Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects , 2013 .
[10] Mohamed Al-Hussein,et al. A methodology for mobile crane lift path checking in heavy industrial projects , 2013 .
[11] Nawari O. Nawari. BIM Standard in Off-Site Construction , 2012 .
[12] Chi Ming Tam,et al. Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming , 2011 .
[13] Xin Wang,et al. Statics-Based Simulation Approach for Two-Crane Lift , 2012 .
[14] Mustafa Alshawi,et al. Construction industry offsite production: A virtual reality interactive training environment prototype , 2012, Adv. Eng. Informatics.
[15] R. Edward Minchin,et al. Sino-American Opinions and Perceptions of Counterfeiting in the Construction Supply Chain , 2013 .
[16] Mohamed Al-Hussein,et al. From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies , 2015 .
[17] Koshy Varghese,et al. Automated Path Planning for Mobile Crane Lifts , 2002 .
[18] Xin Wang,et al. Algorithm of Crane Selection for Heavy Lifts , 2011 .
[19] Shih-Chung Jessy Kang,et al. SimCrane 3D+: A crane simulator with kinesthetic and stereoscopic vision , 2013, Adv. Eng. Informatics.
[20] Shih-Chung Kang,et al. A fast path planning method for single and dual crane erections , 2012 .
[21] Walid Y. Thabet,et al. A Virtual Construction Environment for preconstruction planning , 2003 .
[22] Shamus P. Smith,et al. Rapid prototyping a virtual fire drill environment using computer game technology , 2009 .
[23] Simaan M. AbouRizk,et al. Simulation-Based Multiagent Approach for Scheduling Modular Construction , 2014, J. Comput. Civ. Eng..
[24] Xin Wang,et al. Lift path planning for a nonholonomic crawler crane , 2014 .
[25] Martin Fischer,et al. Automated Generation of Work Spaces Required by Construction Activities , 2002 .
[26] Yangming Shi,et al. Impact assessment of reinforced learning methods on construction workers' fall risk behavior using virtual reality , 2019, Automation in Construction.
[27] Seokyon Hwang,et al. Ultra-wide band technology experiments for real-time prevention of tower crane collisions , 2012 .
[28] Koshy Varghese,et al. COLLISION FREE PATH PLANNING OF COOPERATIVE CRANE MANIPULATORS USING GENETIC ALGORITHM , 2005 .
[29] Peter E.D. Love,et al. A conceptual framework for integrating building information modeling with augmented reality , 2013 .
[30] Nashwan Dawood,et al. On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning , 2020, Automation in Construction.
[31] Heng Li,et al. Using game technologies to improve the safety of construction plant operations. , 2012, Accident; analysis and prevention.
[32] Carl T. Haas,et al. Computer‐Aided Planning for Heavy Lifts , 1993 .
[33] Mohamed Al-Hussein,et al. Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects , 2013 .
[34] Jennifer Whyte,et al. From CAD to virtual reality : modelling approaches, data exchange and interactive 3D building design tools , 2000 .
[35] Charles M. Eastman,et al. Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .