Critical lifting simulation of heavy industrial construction in gaming environment

[1]  Ulrich Hermann,et al.  An algorithm for the calculation of feasible mobile crane position areas , 2011 .

[2]  Zhen-Zhong Hu,et al.  BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies , 2011 .

[3]  Xiangyu Wang,et al.  Using affective human-machine interface to increase the operation performance in virtual construction crane training system: A novel approach , 2011 .

[4]  Cheng Zhang,et al.  Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency , 2012, Adv. Eng. Informatics.

[5]  Hun Hee Cho,et al.  A laser-technology-based lifting-path tracking system for a robotic tower crane , 2009 .

[6]  Min-Yuan Cheng,et al.  Particle bee algorithm for tower crane layout with material quantity supply and demand optimization , 2014 .

[7]  Jing Du,et al.  Zero latency: Real-time synchronization of BIM data in virtual reality for collaborative decision-making , 2018 .

[8]  Mohamed Al-Hussein,et al.  An Integrated System to Select, Position, and Simulate Mobile Cranes for Complex Industrial Projects , 2010 .

[9]  Mohamed Al-Hussein,et al.  Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects , 2013 .

[10]  Mohamed Al-Hussein,et al.  A methodology for mobile crane lift path checking in heavy industrial projects , 2013 .

[11]  Nawari O. Nawari BIM Standard in Off-Site Construction , 2012 .

[12]  Chi Ming Tam,et al.  Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming , 2011 .

[13]  Xin Wang,et al.  Statics-Based Simulation Approach for Two-Crane Lift , 2012 .

[14]  Mustafa Alshawi,et al.  Construction industry offsite production: A virtual reality interactive training environment prototype , 2012, Adv. Eng. Informatics.

[15]  R. Edward Minchin,et al.  Sino-American Opinions and Perceptions of Counterfeiting in the Construction Supply Chain , 2013 .

[16]  Mohamed Al-Hussein,et al.  From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies , 2015 .

[17]  Koshy Varghese,et al.  Automated Path Planning for Mobile Crane Lifts , 2002 .

[18]  Xin Wang,et al.  Algorithm of Crane Selection for Heavy Lifts , 2011 .

[19]  Shih-Chung Jessy Kang,et al.  SimCrane 3D+: A crane simulator with kinesthetic and stereoscopic vision , 2013, Adv. Eng. Informatics.

[20]  Shih-Chung Kang,et al.  A fast path planning method for single and dual crane erections , 2012 .

[21]  Walid Y. Thabet,et al.  A Virtual Construction Environment for preconstruction planning , 2003 .

[22]  Shamus P. Smith,et al.  Rapid prototyping a virtual fire drill environment using computer game technology , 2009 .

[23]  Simaan M. AbouRizk,et al.  Simulation-Based Multiagent Approach for Scheduling Modular Construction , 2014, J. Comput. Civ. Eng..

[24]  Xin Wang,et al.  Lift path planning for a nonholonomic crawler crane , 2014 .

[25]  Martin Fischer,et al.  Automated Generation of Work Spaces Required by Construction Activities , 2002 .

[26]  Yangming Shi,et al.  Impact assessment of reinforced learning methods on construction workers' fall risk behavior using virtual reality , 2019, Automation in Construction.

[27]  Seokyon Hwang,et al.  Ultra-wide band technology experiments for real-time prevention of tower crane collisions , 2012 .

[28]  Koshy Varghese,et al.  COLLISION FREE PATH PLANNING OF COOPERATIVE CRANE MANIPULATORS USING GENETIC ALGORITHM , 2005 .

[29]  Peter E.D. Love,et al.  A conceptual framework for integrating building information modeling with augmented reality , 2013 .

[30]  Nashwan Dawood,et al.  On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning , 2020, Automation in Construction.

[31]  Heng Li,et al.  Using game technologies to improve the safety of construction plant operations. , 2012, Accident; analysis and prevention.

[32]  Carl T. Haas,et al.  Computer‐Aided Planning for Heavy Lifts , 1993 .

[33]  Mohamed Al-Hussein,et al.  Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects , 2013 .

[34]  Jennifer Whyte,et al.  From CAD to virtual reality : modelling approaches, data exchange and interactive 3D building design tools , 2000 .

[35]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .