A stochastic model for estimation of repair rate for system operating under performance based logistics

[1]  Sang-Hyun Kim,et al.  Reliability or Inventory ? Contracting Strategies for After-Sales Product Support , 2007 .

[2]  Irene C. L. Ng,et al.  Outcome-based contracts as a driver for systems thinking and service-dominant logic in service science: evidence from the defence industry , 2009 .

[3]  D Hoffman,et al.  THE THEORY OF THE RAYLEIGH DISTRIBUTION AND SOME OF ITS APPLICATIONS , 1975 .

[4]  Keebom Kang,et al.  A decision support model for valuing proposed improvements in component reliability , 2005 .

[5]  Michael C. Fu,et al.  Models for multi-echelon repairable item inventory systems with limited repair capacity , 1997 .

[6]  Dirk Cattrysse,et al.  Stocking decisions for repairable spare parts pooling in a multi-hub system , 2005 .

[7]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[8]  Tao Nie,et al.  Simulation of a closed loop multi-echelon repairable inventory system , 2009, 2009 International Conference on Management Science and Engineering.

[9]  Hoong Chuin Lau,et al.  Multi-Echelon Repairable Item Inventory System with Limited Repair Capacity under Nonstationary Demands , 2008 .

[10]  Rajesh Piplani,et al.  A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..

[11]  Craig C. Sherbrooke,et al.  VARI-METRIC: Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models , 1986, Oper. Res..

[12]  David M. Miller,et al.  Base stock level determination for high cost low demand critical repairable spares , 1994, Comput. Oper. Res..

[13]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[14]  U. D. Kumar,et al.  Spares provisioning under performance-based logistics contract: profit-centric approach , 2008, J. Oper. Res. Soc..

[15]  M. Krawczyk Conditions for unmanned aircraft reliability determination , 2013 .

[16]  Jianmin Zhao,et al.  Integrated decision on spare parts ordering and equipment maintenance under condition based maintenance strategy , 2015 .

[17]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..

[18]  Keebom Kang,et al.  A Design of Experiments Approach to Readiness Risk Analysis , 2006, Proceedings of the 2006 Winter Simulation Conference.

[19]  Nikolaos Limnios,et al.  Applied Nonparametric Statistics in Reliability , 2011 .

[20]  Karol Andrzejczak Stochastic Modelling Of The Repairable System , 2015 .

[21]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[22]  Lawrence M Leemis,et al.  Univariate Distribution Relationships , 2008 .

[23]  Joe B. Hanna,et al.  EVOLVING A THEORY OF PERFORMANCE-BASED LOGISTICS USING INSIGHTS FROM SERVICE DOMINANT LOGIC , 2010 .