An economic production lot size model in an imperfect production system
暂无分享,去创建一个
[1] Meir J. Rosenblatt,et al. A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .
[2] Shib Sankar Sana,et al. On a volume flexible inventory model for items with an imperfect production system , 2007 .
[3] Hsu–Hua Lee. Investment model development for repetitive inspections and measurement equipment in imperfect production systems , 2006 .
[4] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[5] L. Cárdenas-Barrón,et al. Note on: Economic production quantity model for items with imperfect quality – a practical approach , 2002 .
[6] Abraham Mehrez,et al. Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality , 1994 .
[7] C. H. Kim,et al. An optimal production run length in deteriorating production processes , 1999 .
[8] S. Goyal,et al. An imperfect production process in a volume flexible inventory model , 2007 .
[9] Mustapha Nourelfath,et al. Service level robustness in stochastic production planning under random machine breakdowns , 2011, Eur. J. Oper. Res..
[10] Mohamad Y. Jaber,et al. Production , Manufacturing and Logistics Learning curves for processes generating defects requiring reworks , 2004 .
[11] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[12] Sheng-Tsaing Tseng,et al. Optimal production run length for products sold with warranty , 2000, Eur. J. Oper. Res..
[13] Mohamad Y. Jaber,et al. Learning curves for imperfect production processes with reworks and process restoration interruptions , 2008, Eur. J. Oper. Res..
[14] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[15] Chih-Chung Lo,et al. Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages , 2006, Math. Comput. Model..
[16] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[17] Chih-Hsiung Wang. The impact of a free-repair warranty policy on EMQ model for imperfect production systems , 2004, Comput. Oper. Res..
[18] Viliam Makis. Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .
[19] S. Papachristos,et al. Economic ordering quantity models for items with imperfect quality , 2006 .
[20] Shey-Huei Sheu,et al. Optimal lot-sizing problem with imperfect maintenance and imperfect production , 2004, Int. J. Syst. Sci..
[21] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[22] Tadashi Dohi,et al. Inspection scheduling for imperfect production processes under free repair warranty contract , 2007, Eur. J. Oper. Res..
[23] Mohamed Ben-Daya,et al. Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .
[24] Hsu-Hua Lee,et al. The investment model in preventive maintenance in multi-level production systems , 2008 .
[25] Manoranjan Maiti,et al. A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints , 2008, Eur. J. Oper. Res..
[26] H. Wee,et al. An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation , 2007 .
[27] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[28] Gwo-Liang Liao. Optimal production correction and maintenance policy for imperfect process , 2007, Eur. J. Oper. Res..
[29] B. Maddah,et al. Economic order quantity for items with imperfect quality: Revisited , 2008 .
[30] R L Schwaller. EOQ UNDER INSPECTION COSTS , 1988 .
[31] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[32] Hung-Chi Chang,et al. An application of fuzzy sets theory to the EOQ model with imperfect quality items , 2004, Comput. Oper. Res..
[33] W. M. Chan,et al. A new EPQ model: integrating lower pricing, rework and reject situations , 2003 .
[34] Hsu-Hua Lee,et al. A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system , 2005, Comput. Ind. Eng..
[35] G. Ozdemir,et al. An economic order quantity model with defective items and shortages , 2007 .
[36] Stanley B. Davis,et al. Quality Management , 2005 .