Application of Integrated Mechanism in Financing Project Works

The issues of building an integrated management mechanism by combining two different mechanisms are considered. One mechanism is designed to distribute finances for the performance of work, the second - to stimulate the performance of work on time. The parameters of mechanisms are determined that induce to inform the planned costs of the work as close as possible to the actual costs and reduce the actual time of the work. The conditions are analyzed, the execution of work with minimal cost and on time.