Handling equipment Selection in open pit mines by using an integrated model based on group decision making

Article history: Received 25 January 2012 Received in revised form April, 5, 2012 Accepted April 8 2012 Available online 11 April 2012 Process of handling equipment selection is one of the most important and basic parts in the project planning, particularly mining projects due to holding a high charge of the total project's cost. Different criteria impact on the handling equipment selection, while these criteria often are in conflicting with each other. Therefore, the process of handling equipment selection is a complex and multi criteria decision making problem. There are a variety of methods for selecting the most appropriate equipment among a set of alternatives. Likewise, according to the sophisticated structure of the problem, imprecise data, less of information, and inherent uncertainty, the usage of the fuzzy sets can be useful. In this study a new integrated model based on fuzzy analytic hierarchy process (FAHP) and fuzzy technique for order preference by similarity to ideal solution (FTOPSIS) is proposed, which uses group decision making to reduce individual errors. In order to calculate the weights of the evaluation criteria, FAHP is utilized in the process of handling equipment selection, and then these weights are inserted to the FTOPSIS computations to select the most appropriate handling system among a pool of alternatives. The results of this study demonstrate the potential application and effectiveness of the proposed model, which can be applied to different types of sophisticated problems in real problems. © 2012 Growing Science Ltd. All rights reserved

[1]  Edmundas Kazimieras Zavadskas,et al.  Maintenance strategy selection using AHP and COPRAS under fuzzy environment , 2012 .

[2]  Lyès Benyoucef,et al.  Simulation based fuzzy TOPSIS approach for group multi-criteria supplier selection problem , 2012, Eng. Appl. Artif. Intell..

[3]  Dileep R. Sule,et al.  Manufacturing facilities : location, planning, and design , 1988 .

[4]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[5]  F. A. Lootsma,et al.  Multicriteria decision analysis with fuzzy pairwise comparisons , 1989 .

[6]  Javad Siahkali Moradi,et al.  A fuzzy TOPSIS method to rank effective fuel reduction factors: A case study of aviation companies , 2011 .

[7]  Selim Zaim,et al.  Analyzing business competition by using fuzzy TOPSIS method: An example of Turkish domestic airline industry , 2011, Expert Syst. Appl..

[8]  Chia-Chi Sun,et al.  Using fuzzy TOPSIS method for evaluating the competitive advantages of shopping websites , 2009, Expert Syst. Appl..

[9]  Emel Kizilkaya Aydogan,et al.  Performance measurement model for Turkish aviation firms using the rough-AHP and TOPSIS methods under fuzzy environment , 2011, Expert Syst. Appl..

[10]  Hassan Amini,et al.  Exposure Assessment to Dust and Free Silica for Workers of Sangan Iron Ore Mine in Khaf, Iran , 2011, Bulletin of environmental contamination and toxicology.

[11]  Siamak Haji Yakhchali,et al.  Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods , 2012 .

[12]  Edmundas Kazimieras Zavadskas,et al.  A new hybrid model for evaluating the working strategies: case study of construction company , 2012 .

[13]  Anjali Awasthi,et al.  A hybrid approach based on SERVQUAL and fuzzy TOPSIS for evaluating transportation service quality , 2011, Comput. Ind. Eng..

[14]  Hsing-Pei Kao,et al.  An integrated fuzzy TOPSIS and MCGP approach to supplier selection in supply chain management , 2011, Expert Syst. Appl..

[15]  Cengiz Kahraman,et al.  Multicriteria decision making in energy planning using a modified fuzzy TOPSIS methodology , 2011, Expert Syst. Appl..

[16]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[17]  Edmundas Kazimieras Zavadskas,et al.  Risk evaluation of tunneling projects , 2012 .

[18]  Masoud Monjezi,et al.  Prediction and controlling of flyrock in blasting operation using artificial neural network , 2011 .

[19]  Vincent F. Yu,et al.  An integrated fuzzy multi-criteria approach for the performance evaluation of multiple manufacturing plants , 2010, Comput. Ind. Eng..

[20]  Miroslaw J. Skibniewski,et al.  Using an integrated model for shaft sinking method selection , 2011 .

[21]  GuoJun,et al.  Rank B2C e-commerce websites in e-alliance based on AHP and fuzzy TOPSIS , 2011 .

[22]  Davy Janssens,et al.  Improved hierarchical fuzzy TOPSIS for road safety performance evaluation , 2012, Knowl. Based Syst..

[23]  Edmundas Kazimieras Zavadskas,et al.  An integrated model for prioritizing strategies of the iranian mining sector , 2011 .

[24]  A Makui,et al.  A portfolio selection using fuzzy analytic hierarchy process: A case study of Iranian pharmaceutical industry , 2011 .

[25]  F YuVincent,et al.  An integrated fuzzy multi-criteria approach for the performance evaluation of multiple manufacturing plants , 2010 .

[26]  Ali Lashgari,et al.  Hard-rock LHD cost estimation using single and multiple regressions based on principal component analysis , 2012 .

[27]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[28]  Ting-Yu Chen,et al.  A fuzzy risk-assessment method using a TOPSIS approach based on interval-valued fuzzy numbers , 2011 .

[29]  C. Kahraman,et al.  Fuzzy multi-attribute equipment selection based on information axiom , 2005 .

[30]  Ching-Lai Hwang,et al.  Multiple Attribute Decision Making: Methods and Applications - A State-of-the-Art Survey , 1981, Lecture Notes in Economics and Mathematical Systems.

[31]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[32]  Mohammad Reza Feylizadeh,et al.  An order acceptance using FAHP and TOPSIS methods: A case study of Iranian vehicle belt production industry , 2012 .