Managing the Transition to the “5-Day Car” in Europe

As industry executives acknowledge, at present there is little evidence of a relationship between car production and the actual orders being generated in sales rooms. This reality has significant implications for customer satisfaction, the industry cost base and future competitiveness. Many executives think that build-to-order (BTO) concepts and practices offer the European automotive industry one of the best opportunities for survival. However, there are significant challenges to be overcome to achieve the BTO transition. In this chapter, key enablers and barriers that will govern the supply chain transition to a BTO business model for the European automotive industry are explored. Research was undertaken at a number of dissemination events regarding the implementation of BTO concepts, attracting top executives from around Europe, and has provided valuable insight into the possibility of an industry transition to BTO. The findings of this study are presented and the chapter goes on to discuss some of the key factors that industry leaders will need to consider in managing the transition to the “5-day car” in Europe including building on existing examples of good practice; training and re-educating industry leaders and the workforce in BTO principles and practices; clear planning and objective setting; enhancing supply chain learning; aligning performance and accounting practices; and communicating and benchmarking progress.

[1]  Nick Rich,et al.  Companies’ perceptions of inhibitors and enablers for process improvement activities , 2003 .

[2]  Daniel A. Levinthal,et al.  ABSORPTIVE CAPACITY: A NEW PERSPECTIVE ON LEARNING AND INNOVATION , 1990 .

[3]  J. Heineke,et al.  Business Process Reengineering: Improving in New Strategic Directions , 1994 .

[4]  Glenn Parry,et al.  Transformation of the European automotive industry: the future of lean , 2006 .

[5]  Stepehn Drew BPR in financial services: Factors for success , 1994 .

[6]  C. Cahill,et al.  Success and failure in implementing supply chain partnering: an empirical study , 1998 .

[7]  Christopher A. Voss,et al.  Benchmarking best practice in European manufacturing sites , 1995 .

[8]  Carlos Cordón,et al.  Lessons from the ‘made in Switzerland’ study: What makes a world-class manufacturer? , 1996 .

[9]  Kate Blackmon,et al.  The impact of national and parent company origin on world‐class manufacturing: Findings from Britain and Germany , 1996 .

[10]  C. Voss,et al.  Made in Europe: A four nations best practice study , 1994 .

[11]  Nick Oliver,et al.  High-Performance Manufacturing: Evidence from the Automotive Components Industry , 1997 .

[12]  G. Wright,et al.  A longitudinal study of TQM implementation: factors influencing success and failure , 2003 .

[13]  Raphael Kaplinsky,et al.  Putting supply chain learning into practice , 2003 .

[14]  Soumitra Dutta,et al.  Reengineering and organizational change: Lessons from a comparative analysis of company experiences , 1995 .

[15]  Matthias Holweg,et al.  The Second Century: Reconnecting Customer and Value Chain through Build-to-Order Moving beyond Mass and Lean Production in the Auto Industry , 2005 .

[16]  Thiagarajan Ravichandran,et al.  An innovation diffusion model of TQM implementation , 2001, IEEE Trans. Engineering Management.

[17]  A. H. Rubenstein,et al.  Interorganizational transfer of technology: A study of adoption of NASA innovations , 1976, IEEE Transactions on Engineering Management.

[18]  John Bessant,et al.  Learning to manage innovation , 2005 .

[19]  D. Longbottom Benchmarking in the UK: an empirical study of practitioners and academics , 2000 .

[20]  Ashok Kochhar,et al.  Why British companies don’t do effective benchmarking , 1999 .

[21]  T. Guimaraes Field testing of the proposed predictors of BPR success in manufacturing firms , 1999 .

[22]  S. Mark Young,et al.  Assessing the organizational fit of a just-in-time manufacturing system: Testing selection, interaction and systems models of contingency theory☆ , 1995 .

[23]  John Bessant,et al.  Learning tomanage innovation , 1996 .

[24]  Andy Neely,et al.  Adoption of Promising Practices: A Systematic Review of the Evidence , 2004 .

[25]  Kate Blackmon,et al.  Small firms under MICROSCOPE: international differences in production/operations management practices and performance , 2001 .

[26]  Charu Chandra,et al.  Enhancing the effectiveness of benchmarking in manufacturing organizations , 2001, Ind. Manag. Data Syst..

[27]  Roberto Panizzolo,et al.  Managing Innovation in SMEs: A Multiple Case Analysis of the Adoption and Implementation of Product and Process Design Technologies , 1998 .

[28]  Ron McLachlin,et al.  Management initiatives and just-in-time manufacturing , 1997 .

[29]  Daniel Roos,et al.  The machine that changed the world : the story of lean production , 1991 .

[30]  Suleiman K. Kassicieh,et al.  Training, performance evaluation, rewards, and TQM implementation success , 1998 .

[31]  Alberto Petroni,et al.  Critical factors of MRP implementation in small and medium‐sized firms , 2002 .

[32]  Charles B. Handy,et al.  The empty raincoat , 2002 .