Estimating harvester productivity in Pinus radiata plantations using StanForD stem files

Abstract Productivity models produced using time differences between consecutive StanForD stem files collected by harvester onboard computers were compared with models produced using traditional time and motion techniques for the same initial trees. Three sites were studied in Pinus radiata plantation clearfell operations across southern Australia. Delays and trees with multiple leaders or broken tops were removed from the data. This was done for the stem file data using filters. The same filters were applied to data from all sites. No significant differences were found between the models at each site, though the stem file productivity models generally had a poorer fit than the time and motion models. The advantages of using stem files for modelling are the ready availability of stem file data, which enables rapid creation of generalised harvester productivity models and avoids short-term changes in productivity caused by the presence of an observer (the “Hawthorne effect”). Disadvantages are the inability to account for unforeseen changes in conditions during data collection, and the inability to isolate work-cycle time-element data.

[1]  Jori Uusitalo,et al.  Characteristics and Significance of a Harvester Operators’ Working Technique in Thinnings , 2004 .

[2]  A. Christopoulos,et al.  Fitting Models to Biological Data Using Linear and Nonlinear Regression: A Practical Guide to Curve Fitting , 2004 .

[3]  Chris B. LeDoux,et al.  Estimating and Validating Ground-Based Timber Harvesting Production Through Computer Simulation , 2003 .

[4]  Frank Thomas Purfürst,et al.  Learning Curves of Harvester Operators , 2010 .

[5]  Thomas Purfürst Der Einfluss des Menschen auf die Leistung von Harvestersystemen , 2008 .

[6]  Jori Uusitalo,et al.  Time consumption analysis of the mechanized cut-to-length harvesting system , 2006 .

[7]  J. Fourier,et al.  Stanford , 2007, Nineteenth-Century Music Review.

[8]  Bruce R. Hartsough,et al.  Productivity standards for harvesters and processors in Italy. , 2010 .

[9]  Timothy P. McDonald,et al.  Using GPS to evaluate productivity and performance of forest machine systems , 2001 .

[10]  Karl Stampfer,et al.  A New Approach To Derive A Productivity Model for the Harvester "Valmet 911 Snake" , 2001 .

[11]  Hans Rudolf Heinimann,et al.  Productivity of a cut-to-length harvester family - an analysis based on operation data , 2001 .

[12]  Lars Sängstuvall Estimates of the productivity of logging operations with a focus on forest fuel extraction , 2010 .

[13]  A. Keeves,et al.  Yield regulation in South Australian Pinus radiata plantations. , 1976 .

[14]  P. O'farrell,et al.  The Assumptions of the Linear Regression Model , 1971 .

[15]  Kalevi Tervo,et al.  A hierarchical fuzzy inference method for skill evaluation of machine operators , 2009, 2009 IEEE/ASME International Conference on Advanced Intelligent Mechatronics.

[16]  Alexander D. Knudson,et al.  Statistical Software , 2019, Wiley StatsRef: Statistics Reference Online.

[17]  Yanjun Qi,et al.  Automated analysis of nursing home observations , 2004, IEEE Pervasive Computing.

[18]  H. Redkey,et al.  A new approach. , 1967, Rehabilitation record.

[19]  Loren D. Kellogg,et al.  Comparison of Time-Study Techniques for Evaluating Logging Production , 1983 .

[20]  Dominik Röser,et al.  The accuracy of manually recorded time study data for harvester operation shown via simulator screen , 2008 .

[21]  Glynn A. Hogg,et al.  Multi-stem mechanised harvesting operation analysis : application of discrete-event simulation , 2009 .

[22]  T. Evanson,et al.  Productivity Measurements of Two Waratah 234 Hydraulic Tree Harvesters in Radiata Pine in New Zealand , 1996 .

[23]  Yuri Gerasimov,et al.  Productivity of single-grip harvesters in clear-cutting operations in the northern European part of Russia , 2011, European Journal of Forest Research.