The Schedule Optimization and Control of Nuclear Power Construction Project Prophase Based on Petri Network
暂无分享,去创建一个
Yu Lei | Lei Qin | Yan Ding | Ruyu Zhang | Jianfeng Lin | Lirong Liu
[1] Eberhard Roos,et al. Lifetime management for mechanical systems, structures and components in nuclear power plants , 2006 .
[2] Aviel Verbruggen,et al. Renewable and nuclear power: A common future? , 2008 .
[3] S. A. Bohra,et al. Construction management of Indian pressurized heavy water reactors , 2006 .
[4] Fang Zong-de. Research on Cooperation Workflow Model Based on Fuzzy-timing Petri Nets , 2008 .
[5] Hu Yu,et al. Study on the Provider Selection in International Procurement Based on Fuzzy Petri Net , 2009, 2009 Second International Conference on Intelligent Computation Technology and Automation.