The M/G/1 queue with disasters and working breakdowns
暂无分享,去创建一个
[1] Satish K. Tripathi,et al. A single server priority queue with server failures and queue flushing , 1989, Oper. Res. Lett..
[2] Karl Sigman,et al. A Pollaczek–Khintchine formula for M/G/1 queues with disasters , 1996, Journal of Applied Probability.
[3] Won S. Yang,et al. A note on the GI/M/1 queue with Poisson negative arrivals , 2001, Journal of Applied Probability.
[4] Won Seok Yang,et al. Geo/G/1 queues with disasters and general repair times , 2011 .
[5] B. Avi-Itzhak,et al. A Many-Server Queue with Service Interruptions , 1968, Oper. Res..
[6] Ramanath Kasturi,et al. A queue with working breakdowns , 2012, Comput. Ind. Eng..
[7] Uri Yechiali,et al. Queues with system disasters and impatient customers when system is down , 2007, Queueing Syst. Theory Appl..
[8] Hendrik Baumann,et al. Steady state analysis of level dependent quasi-birth-and-death processes with catastrophes , 2012, Comput. Oper. Res..
[9] Jau-Chuan Ke,et al. Bi-level control for batch arrival queues with an early startup and un-reliable server , 2004 .
[10] Ioannis Dimitriou,et al. A repairable queueing model with two-phase service, start-up times and retrial customers , 2010, Comput. Oper. Res..
[11] Eric Renshaw,et al. The M / M /1 queue with mass exodus and mass arrivals when empty , 1997 .
[12] Ronald W. Wolff,et al. Poisson Arrivals See Time Averages , 1982, Oper. Res..
[13] Antonis Economou,et al. Synchronized abandonments in a single server unreliable queue , 2010, Eur. J. Oper. Res..
[14] Ioannis Dimitriou,et al. A preemptive resume priority retrial queue with state dependent arrivals, unreliable server and negative customers , 2013 .
[15] Jau-Chuan Ke,et al. On M/G/1 system under NT policies with breakdowns, startup and closedown , 2006 .
[16] J. Gani,et al. Birth, immigration and catastrophe processes , 1982, Advances in Applied Probability.
[17] Zhe George Zhang,et al. Optimal (d, c) vacation policy for a finite buffer M/M/c queue with unreliable servers and repairs , 2009 .
[18] Gautam Choudhury,et al. The optimal control of an Mx/G/1 unreliable server queue with two phases of service and Bernoulli vacation schedule , 2011, Math. Comput. Model..
[19] Jau-Chuan Ke,et al. Modified T vacation policy for an M/G/1 queueing system with an unreliable server and startup , 2005, Math. Comput. Model..
[20] Jesús R. Artalejo,et al. Analysis of a stochastic clearing system with repeated attempts , 1998 .
[21] Gautam Choudhury,et al. A BATCH ARRIVAL RETRIAL QUEUE WITH GENERAL RETRIAL TIMES UNDER BERNOULLI VACATION SCHEDULE FOR UNRELIABLE SERVER AND DELAYING REPAIR , 2012 .
[22] Jau-Chuan Ke,et al. An M/G/1 queue under hysteretic vacation policy with an early startup and un-reliable server , 2006, Math. Methods Oper. Res..
[23] Won S. Yang,et al. ANALYSIS OF M/G/1 STOCHASTIC CLEARING SYSTEMS , 2002 .
[24] R. Sudhesh. Transient analysis of a queue with system disasters and customer impatience , 2010, Queueing Syst. Theory Appl..
[25] Gennadi Falin. An M/G/1 retrial queue with an unreliable server and general repair times , 2010, Perform. Evaluation.