Impact of Advance Rate on Entrapment Risk of a Double-Shielded TBM in Squeezing Ground
暂无分享,去创建一个
[1] Giovanni Battista Barla,et al. The Saint Martin La Porte access adit (Lyon–Turin Base Tunnel) revisited , 2012 .
[2] Faisal I. Shalabi. FE analysis of time-dependent behavior of tunneling in squeezing ground using two different creep models , 2005 .
[3] J. Schmitt,et al. Spannungsverformungsverhalten des Gebirges beim Vortrieb mit Tunnelbohrmaschinen mit Schild , 2009 .
[4] Jamal Rostami,et al. 3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds , 2014 .
[5] Georg Anagnostou,et al. The Effect of Consolidation on TBM Shield Loading in Water-Bearing Squeezing Ground , 2011 .
[6] Giovanni Battista Barla,et al. Time Dependent Deformations in Squeezing Tunnels , 2010 .
[7] Georg Anagnostou,et al. On the feasibility of TBM drives in squeezing ground , 2006 .
[8] E. Fjaer,et al. Petroleum Related Rock Mechanics , 1992 .
[9] F. Pellet,et al. On the 3D numerical modelling of the time-dependent development of the damage zone around underground galleries during and after excavation , 2009 .
[10] G. Barla. Tunnelling under squeezing rock conditions , 2002 .
[11] E. Hoek,et al. Overcoming Squeezing in the Yacambú-Quibor Tunnel, Venezuela , 2009 .
[12] Giovanni Battista Barla,et al. A Completely 3D Model for the Simulation of Mechanized Tunnel Excavation , 2012, Rock Mechanics and Rock Engineering.
[13] R. Ribacchi,et al. 3D-Modelling of TBM excavation in squeezing rock masses , 2007 .
[14] Giovanni Battista Barla,et al. New Viscoplastic Model for Design Analysis of Tunnels in Squeezing Conditions , 2009 .
[15] Georgios Anagnostou,et al. The Effect of the Stress Path on Squeezing Behavior in Tunneling , 2009 .
[16] Georgios Anagnostou,et al. Numerical Analysis of the Development of Squeezing Pressure During TBM Standstills , 2007 .
[17] Georg Anagnostou,et al. Tunnel boring machines under squeezing conditions , 2010 .
[18] Giovanni Lombardi,et al. Gibraltar Tunnel Project update – the geomechanical challenges , 2009 .
[19] Georg Anagnostou,et al. The Interaction Between Shield, Ground and Tunnel Support in TBM Tunnelling Through Squeezing Ground , 2011 .
[20] Ebrahim Farrokh,et al. Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project , 2009 .
[21] Marco Barla,et al. The Mechanical Behaviour of Clay Shales and Implications on the Design of Tunnels , 2009 .
[22] Giovanni Lombardi Dr. Ing.,et al. Gibraltar Tunnel Project update – the geomechanical challenges. Gibraltar Tunnel Projektaktualisierung – die geomechanischen Herausforderungen , 2009 .
[23] Ian W. Farmer,et al. Engineering Behaviour of Rocks , 1983 .