Team development and performance in construction design teams: an assessment of a hierarchical model with mediating effect of compensation

A high-performance construction workplace invests in its human resources and facilitates their technical and innovation skills through team development. Though team development has been explored in many studies, to date, little research has disentangled how team development and compensation methods enhance team performance in construction companies. Accordingly, team development as a hierarchical, reflective construct, incorporating six associated components was extended and the variables of the model in a nomological network analysed using partial least squares (PLS). As a result, with the help of PLS path modelling, a hierarchical team development construct with the mediating effects of compensation on the relationship between team development and team performance was developed. The research analysis was completed on a sample population of 128 construction design teams and the results lead to the development of a model that shows team development has a significant direct and indirect impact on team performance. The results also confirm the mediating role of group compensation on the relationship between team development and team performance. In general, it is suggested that the design teams achieved better performance when the leaders adapted team compensation methods consistent with the team development practices.

[1]  Jacob Cohen Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.

[2]  James Martinez Leadership: Theory and Practice , 2014 .

[3]  Suzanne Wilkinson,et al.  Development of a conceptual team integration performance index for alliance projects , 2013 .

[4]  Chimay J. Anumba,et al.  Development of CDPM matrix for the measurement of collaborative design performance in construction , 2013 .

[5]  Jennifer Whyte,et al.  Safe construction through design: perspectives from the site team , 2013 .

[6]  John Riker Haymaker,et al.  Evaluating and improving the effectiveness and efficiency of design process communication , 2013, Adv. Eng. Informatics.

[7]  Daniela Cruzes,et al.  Interpretative case studies on agile team productivity and management , 2013, Inf. Softw. Technol..

[8]  Ab Halim Abu Bakar,et al.  Effects of training and motivation practices on teamwork improvement and task efficiency: The case of construction firms , 2012 .

[9]  Hamimah Adnan,et al.  Important Qualities of Design Teams in Managing Client's Brief and their Impact on Delivering Quality Buildings , 2012 .

[10]  Geoffrey Qiping Shen,et al.  A group decision support system for implementing value management methodology in construction briefing , 2011 .

[11]  D. Tjosvold,et al.  Linking Transformational Leadership and Team Performance: A Conflict Management Approach , 2011 .

[12]  Shahriar Akter,et al.  Trustworthiness in mHealth information services: An assessment of a hierarchical model with mediating and moderating effects using partial least squares (PLS) , 2011, J. Assoc. Inf. Sci. Technol..

[13]  Habib Chabchoub,et al.  An imprecise goal programming approach for modeling design team's preferences in quality function deployment planning process , 2010 .

[14]  Gary Klein,et al.  User commitment and collaboration: Motivational antecedents and project performance , 2010, Inf. Softw. Technol..

[15]  Tore Dybå,et al.  A teamwork model for understanding an agile team: A case study of a Scrum project , 2010, Inf. Softw. Technol..

[16]  Steve Rowlinson,et al.  Dynamics of control in construction project teams , 2010 .

[17]  Wynne W. Chin How to Write Up and Report PLS Analyses , 2010 .

[18]  Vincenzo Esposito Vinzi,et al.  PLS Path Modeling: From Foundations to Recent Developments and Open Issues for Model Assessment and Improvement , 2010 .

[19]  J. Katzenbach,et al.  The Wisdom of Teams , 2010 .

[20]  Stephen E. Humphrey,et al.  Legitimacy of team rewards: Analyzing legitimacy as a condition for the effectiveness of team incentive designs , 2010 .

[21]  Gerardo Cupido,et al.  The role of production and teamwork practices in construction safety: a cognitive model and an empirical case study. , 2009, Journal of safety research.

[22]  Zhong-Zhong Jiang,et al.  A method for member selection of R&D teams using the individual and collaborative information , 2009, Expert Syst. Appl..

[23]  Thomas C. Cross,et al.  A Meta‐Analysis to Review Organizational Outcomes Related to Charismatic Leadership , 2009 .

[24]  Gaby Odekerken-Schröder,et al.  Using PLS path modeling for assessing hierarchial construct models: guidelines and impirical illustration , 2009 .

[25]  Erick C. Jones,et al.  Can team effectiveness be predicted , 2008 .

[26]  David. Proverbs,et al.  Towards developing competency-based measures for construction project managers: Should contextual behaviours be distinguished from task behaviours? , 2008 .

[27]  Detmar W. Straub,et al.  Specifying Formative Constructs in Information Systems Research , 2007, MIS Q..

[28]  Dennis O’Connor,et al.  Team Leadership , 2007 .

[29]  P. Northouse Leadership theory and practice, 4th ed. , 2007 .

[30]  Tetsuo Tomiyama,et al.  Advanced Engineering Informatics , 2007, Adv. Eng. Informatics.

[31]  M. Kenward,et al.  An Introduction to the Bootstrap , 2007 .

[32]  Bernd Irlenbusch,et al.  Relative Rewards within Team-Based Compensation , 2006, SSRN Electronic Journal.

[33]  Rebecca Duray,et al.  Teamwork Orientation, Group Cohesiveness, and Student Learning: A Study of the Use of Teams in Online Distance Education , 2006 .

[34]  David B. Balkin,et al.  Top management team compensation in high-growth technology ventures , 2006 .

[35]  Ani Raiden,et al.  Human Resource Development in Construction Organisations: An Example of a "Chaordic" Learning Organisation?. , 2006 .

[36]  Cheryl Burke Jarvis,et al.  The problem of measurement model misspecification in behavioral and organizational research and some recommended solutions. , 2005, The Journal of applied psychology.

[37]  Martin Skitmore,et al.  CHARACTERISTICS OF TEAMWORK IN SINGAPORE CONSTRUCTION PROJECTS , 2005 .

[38]  Jörg Henseler,et al.  Testing Moderating Effects in PLS Path Models. An Illustration of Available Procedures , 2005 .

[39]  Stefan Tangen,et al.  Demystifying productivity and performance , 2005 .

[40]  Michel Tenenhaus,et al.  PLS path modeling , 2005, Comput. Stat. Data Anal..

[41]  Detmar W. Straub,et al.  A Practical Guide To Factorial Validity Using PLS-Graph: Tutorial And Annotated Example , 2005, Commun. Assoc. Inf. Syst..

[42]  Shelley D. Dionne,et al.  Transformational leadership and team performance , 2004 .

[43]  M. West,et al.  Building Team-Based Working , 2004 .

[44]  S. Cowley,et al.  Multidisciplinary communication in the Irish public health nursing service: a study. , 2003, British journal of community nursing.

[45]  Cheryl Burke Jarvis,et al.  A Critical Review of Construct Indicators and Measurement Model Misspecification in Marketing and Consumer Research , 2003 .

[46]  Finian Buckley,et al.  Increasing team emotional intelligence through process , 2003 .

[47]  P. Shrout,et al.  Mediation in experimental and nonexperimental studies: new procedures and recommendations. , 2002, Psychological methods.

[48]  David Arditi,et al.  Assessing contractor quality performance , 2002 .

[49]  M. Hoegl,et al.  Teamwork Quality and the Success of Innovative Projects , 2001 .

[50]  J. Edwards Multidimensional Constructs in Organizational Behavior Research: An Integrative Analytical Framework , 2001 .

[51]  J Molyneux,et al.  Interprofessional teamworking: what makes teams work well? , 2001, Journal of interprofessional care.

[52]  Gordon Culp,et al.  UNDERSTANDING PSYCHOLOGICAL TYPE TO IMPROVE PROJECT TEAM PERFORMANCE , 2001 .

[53]  Tudor Rickards,et al.  Creative Leadership Processes in Project Team Development: An Alternative to Tuckman's Stage Model , 2000 .

[54]  Detmar W. Straub,et al.  Structural Equation Modeling and Regression: Guidelines for Research Practice , 2000, Commun. Assoc. Inf. Syst..

[55]  Thomas W. Scott,et al.  Performance measurement and managerial teams , 1999 .

[56]  Daniel R. Ilgen,et al.  TEAMS EMBEDDED IN ORGANIZATIONS : SOME IMPLICATIONS , 1999 .

[57]  Giles Hirst The relationship between team communication and R&D project performance: a five factor model of team communication , 1999 .

[58]  Watts S. Humphrey,et al.  Introduction to the Team Software Process , 1999 .

[59]  Peter E.D. Love,et al.  Concurrent engineering : a strategy for procuring construction projects , 1998 .

[60]  Kenneth S. Law,et al.  Toward A Taxonomy of Multidimensional Constructs , 1998 .

[61]  Chimay J. Anumba,et al.  An integrated framework for concurrent life-cycle design and construction , 1998 .

[62]  Low Sui Pheng Back to the basics: biblical wisdom for effective construction project management , 1998 .

[63]  Wynne W. Chin Issues and Opinion on Structural Equation Modeling by , 2009 .

[64]  Irtishad Ahmad,et al.  Construction project teams for TQM: a factor-element impact model , 1997 .

[65]  Todd R. Zenger,et al.  The Determinants of Incentive Intensity in Group-Based Rewards , 1996 .

[66]  Richard A. Guzzo,et al.  Teams in organizations: recent research on performance and effectiveness. , 1996, Annual review of psychology.

[67]  Wynne W. Chin,et al.  Adoption intention in GSS: relative importance of beliefs , 1995, DATB.

[68]  R. Wageman Interdependence and Group Effectiveness , 1995 .

[69]  A. K. Munns,et al.  Potential influence of trust on the successful completion of a project , 1995 .

[70]  Dwight D. Frink,et al.  A Review of the Influence of Group Goals on Group Performance , 1994 .

[71]  M. A. Campion,et al.  The Knowledge, Skill, and Ability Requirements for Teamwork: Implications for Human Resource Management , 1994 .

[72]  P. Goodman Groups That Work (and Those That Don't)Groups That Work (and Those That Don't) by Hackman Richard. San Francisco: Jossey-Bass, 1991, 512 pp. , 1992 .

[73]  Kazemek Ea Ten criteria for effective team building. , 1991 .

[74]  David G. Mathiasen Groups that work (and those that Don't): Creating Conditions for Effective Teamwork, edited by J. Richard Hackman. San Francisco, CA: Jossey-Bass 1990, 512 pp. Price: $39.95 cloth , 1991 .

[75]  S. Green How Many Subjects Does It Take To Do A Regression Analysis. , 1991, Multivariate behavioral research.

[76]  E. Kazemek Ten criteria for effective team building. , 1991, Healthcare financial management : journal of the Healthcare Financial Management Association.

[77]  H. Thamhain Managing technologically innovative team efforts toward new product success , 1990 .

[78]  Gregory E. Huszczo Training for team building , 1990 .

[79]  E. Sundstrom,et al.  Work teams: Applications and effectiveness. , 1990 .

[80]  Kevin J. Murphy,et al.  Performance Pay and Top Management Incentives , 1990 .

[81]  P. Lachenbruch Statistical Power Analysis for the Behavioral Sciences (2nd ed.) , 1989 .

[82]  D. Whetten What Constitutes a Theoretical Contribution , 1989 .

[83]  Jan-Bernd Lohmöller,et al.  Latent Variable Path Modeling with Partial Least Squares , 1989 .

[84]  S. Ghoshal,et al.  Internal differentiation within multinational corporations , 1989 .

[85]  Deborah Diane Milosevich,et al.  The Leadership Experience , 1988 .

[86]  R. Keller,et al.  Predictors of the Performance of Project Groups in R & D Organizations , 1986 .

[87]  M. Sobel Asymptotic Confidence Intervals for Indirect Effects in Structural Equation Models , 1982 .

[88]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[89]  Mike Woodcock,et al.  Team Development Manual , 1979 .

[90]  I. Ajzen,et al.  Attitude-behavior relations: A theoretical analysis and review of empirical research. , 1977 .

[91]  N. C. Morse,et al.  Satisfactions in the white-collar job , 1977 .