A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
暂无分享,去创建一个
[1] Iris F. A. Vis,et al. Transshipment of containers at a container terminal: An overview , 2003, Eur. J. Oper. Res..
[2] Andreas Bortfeldt,et al. A tree search procedure for the container relocation problem , 2012, Comput. Oper. Res..
[3] Ting Fang,et al. Dynamic rolling strategy for multi-vessel quay crane scheduling , 2017, Adv. Eng. Informatics.
[4] Jin Sha,et al. An Improved Storage-Space Selection Model and Algorithm for Outbound Shipping Containers: Considering the Synchronous Operation of Multiple Gantry Cranes in Port Terminals Worldwide , 2019 .
[5] Florian Jaehn,et al. Housekeeping: Foresightful container repositioning☆ , 2016 .
[6] Lixin Tang,et al. Modeling and solution of the joint quay crane and truck scheduling problem , 2014, Eur. J. Oper. Res..
[7] Rudy R. Negenborn,et al. Coordinated optimization of equipment operations in a container terminal , 2019, Flexible Services and Manufacturing Journal.
[8] Dehong Xu,et al. Research on coupling scheduling of quay crane dispatch and configuration in the container terminal , 2018, Comput. Ind. Eng..
[9] Xiangtong Qi,et al. Storage space allocation models for inbound containers in an automatic container terminal , 2013, Eur. J. Oper. Res..
[10] Der-Horng Lee,et al. Terminal and yard allocation problem for a container transshipment hub with multiple terminals , 2012 .
[11] Ben Niu,et al. Swarm intelligence algorithms for Yard Truck Scheduling and Storage Allocation Problems , 2016, Neurocomputing.
[12] Yi-Chih Yang,et al. Operating strategies of CO2 reduction for a container terminal based on carbon footprint perspective , 2017 .
[13] Nils Kemme,et al. Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals , 2012, OR Spectr..
[14] Pasquale Legato,et al. A decision support system for integrated container handling in a transshipment hub , 2018, Decis. Support Syst..
[15] Nils Boysen,et al. A generalized classification scheme for crane scheduling with interference , 2017, Eur. J. Oper. Res..
[16] Dejun Mu,et al. Adaptively Random Weighted Cubature Kalman Filter for Nonlinear Systems , 2019 .
[17] André Langevin,et al. Integrated scheduling of crane handling and truck transportation in a maritime container terminal , 2013, Eur. J. Oper. Res..
[18] Xuemin Du,et al. Research on Cooperative Scheduling of Automated Quayside Cranes and Automatic Guided Vehicles in Automated Container Terminal , 2019 .
[19] Kwang Ryel Ryu,et al. Comparison of operations of AGVs and ALVs in an automated container terminal , 2011, J. Intell. Manuf..
[20] Rubén Ruiz,et al. A branch and bound approach for large pre-marshalling problems , 2019, Eur. J. Oper. Res..
[21] Youfang Huang,et al. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption , 2015, Adv. Eng. Informatics.
[22] Endre Pap,et al. Quay Crane Scheduling for River Container Terminals , 2013 .
[23] Kap Hwan Kim,et al. Container Terminal Operation: Current Trends and Future Challenges , 2015 .
[24] Nils Boysen,et al. Determining crane areas for balancing workload among interfering and noninterfering cranes , 2012 .
[25] Ye Zhang,et al. A three-stage decomposition method for the joint vehicle dispatching and storage allocation problem in automated container terminals , 2019, Comput. Ind. Eng..
[26] Jian Gang Jin,et al. A branch-and-price method for integrated yard crane deployment and container allocation in transshipment yards , 2017 .
[27] Kap Hwan Kim,et al. Conservative allocation models for outbound containers in container terminals , 2014, Eur. J. Oper. Res..
[28] Deniz Türsel Eliiyi,et al. STORAGE OPTIMIZATION FOR EXPORT CONTAINERS IN THE PORT OF IZMIR , 2013 .
[29] Hang Yu,et al. Capturing effects of container location dispersion on quay crane performance , 2018 .
[30] Agostinho Agra,et al. MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem , 2018, Eur. J. Oper. Res..
[31] Jian Jin,et al. Simulation-Based Optimization for Storage Allocation Problem of Outbound Containers in Automated Container Terminals , 2015 .
[32] Yongpei Guan,et al. The crane scheduling problem: models and solution approaches , 2013, Ann. Oper. Res..
[33] Yongsheng Yang,et al. An integrated scheduling method for AGV routing in automated container terminals , 2018, Comput. Ind. Eng..
[34] Isam Kaysi,et al. An integrated model for resource allocation and scheduling in a transshipment container terminal , 2012 .
[35] Lifeng Xi,et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal , 2007, Eur. J. Oper. Res..
[36] Andreas T. Ernst,et al. Approaches for solving the container stacking problem with route distance minimization and stack rearrangement considerations , 2014, Comput. Oper. Res..
[37] Chengle Ma,et al. Cranes scheduling in frame bridges based automated container terminals , 2018, Transportation Research Part C: Emerging Technologies.
[38] Lu Zhen,et al. A decomposition method to analyze the performance of frame bridge based automated container terminal , 2014, Expert Syst. Appl..
[39] Belén Melián-Batista,et al. Empirical study of variable neighbourhood search applied to the optimization of the internal delivery vehicles at maritime container terminals , 2017, Electron. Notes Discret. Math..
[40] Loo Hay Lee,et al. A novel approach to yard planning under vessel arrival uncertainty , 2012 .
[41] Amir Hossein Gharehgozli,et al. Stacking outbound barge containers in an automated deep-sea terminal , 2018, Eur. J. Oper. Res..
[42] Yang Yang,et al. QCs scheduling scheme of genetic algorithm (GA) and improved firefly algorithm (FA) , 2019, Cluster Computing.
[43] Ali H. Diabat,et al. A joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational results , 2015, Optim. Lett..
[44] Aihu Wang,et al. The impact of incomplete vessel arrival information on container stacking , 2020 .
[45] Jeongmin Kim,et al. Online preference learning for adaptive dispatching of AGVs in an automated container terminal , 2016, Appl. Soft Comput..
[46] Branislav Dragović,et al. Simulation modelling in ports and container terminals: literature overview and analysis by research field, application area and tool , 2017 .
[47] Milan Tuba,et al. A multi-heuristic approach for solving the pre-marshalling problem , 2014, Central Eur. J. Oper. Res..
[48] Belén Melián-Batista,et al. Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem , 2013, Appl. Soft Comput..
[49] Nathan Huynh,et al. An efficient genetic algorithm for solving the quay crane scheduling problem , 2012, Expert Syst. Appl..
[50] Xiaoming Sun,et al. An Effective Heuristic for the Integrated Scheduling Problem of Automated Container Handling System Using Twin 40' Cranes , 2010, 2010 Second International Conference on Computer Modeling and Simulation.
[51] Kap Hwan Kim,et al. Estimating the space requirement for outbound container inventories in port container terminals , 2011 .
[52] Mark Goh,et al. An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem , 2014, Eur. J. Oper. Res..
[53] Chang Daofang,et al. Optimization of Gantry Crane Scheduling in Container Sea-Rail Intermodal Transport Yard , 2018 .
[54] Mark Johnston,et al. Hybrid evolutionary computation methods for quay crane scheduling problems , 2013, Comput. Oper. Res..
[55] Lu Zhen. Container yard template planning under uncertain maritime market , 2014 .
[56] Dominik Kress,et al. Scheduling cooperative gantry cranes with seaside and landside jobs , 2018, Discret. Appl. Math..
[57] Francesco Corman,et al. Control of interacting machines in automated container terminals using a sequential planning approach for collision avoidance , 2015 .
[58] Kevin Tierney,et al. Deep Learning Assisted Heuristic Tree Search for the Container Pre-marshalling Problem , 2017, Comput. Oper. Res..
[59] Pasquale Legato,et al. Modeling and solving rich quay crane scheduling problems , 2012, Comput. Oper. Res..
[60] Kees Jan Roodbergen,et al. Storage yard operations in container terminals: Literature overview, trends, and research directions , 2014, Eur. J. Oper. Res..
[61] Ahmed El Hilali Alaoui,et al. Simulation optimization based ant colony algorithm for the uncertain quay crane scheduling problem , 2019, International Journal of Industrial Engineering Computations.
[62] Ali H. Diabat,et al. A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach , 2014, Expert Syst. Appl..
[63] Rolf H. Möhring,et al. Conflict-free vehicle routing , 2012, EURO J. Transp. Logist..
[64] Matthew E. H. Petering. Decision support for yard capacity, fleet composition, truck substitutability, and scalability issues at seaport container terminals , 2011 .
[65] Tobias Buer,et al. An online storage strategy with dynamic bay reservations for container terminals , 2016, 2016 IEEE Symposium Series on Computational Intelligence (SSCI).
[66] Loo Hay Lee,et al. Frame Trolley Dispatching Algorithm for the Frame Bridge Based Automated Container Terminal , 2018, Transp. Sci..
[67] Yue Wu,et al. Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal , 2016, Comput. Ind. Eng..
[68] Wenkai Li,et al. A continuous time model for multiple yard crane scheduling with last minute job arrivals , 2012 .
[69] Mi Weijian,et al. Storage Allocation in Automated Container Terminals: the Upper Level , 2016 .
[70] Stefan Voß,et al. Solving the pre-marshalling problem to optimality with A* and IDA* , 2017 .
[71] Kevin Tierney,et al. Solving real-world sized container pre-marshalling problems with an iterative deepening branch-and-bound algorithm , 2018, Eur. J. Oper. Res..
[72] Iván Castilla-Rodríguez,et al. Simulation-optimization for the management of the transshipment operations at maritime container terminals , 2020, Expert Syst. Appl..
[73] Junliang He,et al. Modelling a resilient yard template under storage demand fluctuations in a container terminal , 2019 .
[74] Yue Zhang,et al. Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clusters , 2019, Comput. Ind. Eng..
[75] Hassan Rashidi,et al. A complete and an incomplete algorithm for automated guided vehicle scheduling in container terminals , 2011, Comput. Math. Appl..
[76] Youfang Huang,et al. Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption , 2015, Expert Syst. Appl..
[77] Yi Ding,et al. Model and heuristic algorithm for Quay Crane Scheduling at container terminal , 2012, 2012 9th International Conference on Fuzzy Systems and Knowledge Discovery.
[78] Stefan Voß,et al. Container terminal operation and operations research — a classification and literature review , 2004 .
[79] Wang Li,et al. Efficient container stacking approach to improve handling: efficiency in Chinese rail–truck transshipment terminals , 2020 .
[80] Shell-Ying Huang,et al. Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals , 2012, Transp. Sci..
[81] Katta G. Murty,et al. Real-time container storage location assignment at a seaport container transshipment terminal: dispersion levels, yard templates, and sensitivity analyses , 2017 .
[82] Francesco Corman,et al. A Tabu Search Algorithm for Inter-terminal Container Transport , 2016 .
[83] Ali Diabat,et al. Quay Crane Scheduling with Vessel Stability , 2018 .
[84] Yu Wang,et al. Storage yard management based on flexible yard template in container terminal , 2017, Adv. Eng. Informatics.
[85] Ceyhun Güven,et al. Modelling and optimisation of online container stacking with operational constraints , 2019 .
[86] Liang Liang,et al. A heuristic algorithm for integrated scheduling problem of container handling system , 2009, 2009 International Conference on Computers & Industrial Engineering.
[87] Christian Bierwirth,et al. A Framework for Integrated Berth Allocation and Crane Operations Planning in Seaport Container Terminals , 2013, Transp. Sci..
[88] Lixin Tang,et al. A Benders decomposition-based framework for solving quay crane scheduling problems , 2019, Eur. J. Oper. Res..
[89] Dominique Feillet,et al. A Local-Search Based Heuristic for the Unrestricted Block Relocation Problem , 2018, Comput. Oper. Res..
[90] Qianqian Wang,et al. Scheduling cooperative twin automated stacking cranes in automated container terminals , 2019, Comput. Ind. Eng..
[91] Stefan Voß,et al. Applying the corridor method to a blocks relocation problem , 2011, OR Spectr..
[92] René B. M. de Koster,et al. Sea container terminals: New technologies and OR models , 2016 .
[93] Der-Horng Lee,et al. Schedule Template Design and Storage Allocation for Cyclically Visiting Feeders in Container Transshipment Hubs , 2012 .
[94] Nathan Huynh,et al. Integrated quay crane and yard truck scheduling for unloading inbound containers , 2015 .
[95] Ching-Jung Ting,et al. Optimizing container relocation operations at container yards with beam search , 2017 .
[96] Ali H. Diabat,et al. An Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price , 2014, 2016 International Conference on Computational Science and Computational Intelligence (CSCI).
[97] Xiaoming Yang,et al. An Intelligent Storage Determining Method for Inbound Containers in Container Terminals , 2015 .
[98] Yong Chen,et al. Approximate the scheduling of quay cranes with non-crossing constraints , 2017, Eur. J. Oper. Res..
[99] Dominik Kress,et al. Straddle carrier routing at seaport container terminals in the presence of short term quay crane buffer areas , 2019, Eur. J. Oper. Res..
[100] Chengbin Chu,et al. Optimal Algorithm for the General Quay Crane Double-Cycling Problem , 2015, Transp. Sci..
[101] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[102] Loo Hay Lee,et al. A container yard storage strategy for improving land utilization and operation efficiency in a transshipment hub port , 2012, Eur. J. Oper. Res..
[103] Valéria Cesário Times,et al. A reactive GRASP metaheuristic for the container retrieval problem to reduce crane’s working time , 2018, J. Heuristics.
[104] Nathan Huynh,et al. Yard crane scheduling at container terminals: A comparative study of centralized and decentralized approaches , 2012 .
[105] Jin Xin Cao,et al. Integrated quay crane and yard truck schedule problem in container terminals , 2010 .
[106] Pasquale Legato,et al. A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules , 2014, 4OR.
[107] Huiling Zhu,et al. Two-stage search algorithm for the inbound container unloading and stacking problem , 2020 .
[108] Ceyda Oguz,et al. Constraint programming approach to quay crane scheduling problem , 2013 .
[109] Lixin Miao,et al. An ant colony algorithm for yard truck scheduling and yard location assignment problems with precedence constraints , 2013 .
[110] Youfang Huang,et al. An investigation into knowledge-based yard crane scheduling for container terminals , 2011, Adv. Eng. Informatics.
[111] Kees Jan Roodbergen,et al. Seaside operations in container terminals: literature overview, trends, and research directions , 2015 .
[112] Jian She Huang,et al. Research on SA-Based Addressing Model of Slot in Container Terminal , 2011 .
[113] Sai Hong Tang,et al. INTEGRATED SCHEDULING OF SP-AS/RS AND HANDLING EQUIPMENT IN AUTOMATED CONTAINER TERMINALS , 2012 .
[114] Evrim Ursavas,et al. Scheduling cranes at an indented berth , 2016, Eur. J. Oper. Res..
[115] Zuhua Jiang,et al. Developing a dynamic rolling-horizon decision strategy for yard crane scheduling , 2011, Adv. Eng. Informatics.
[116] Roberto Trunfio,et al. A Timed Petri Net Model For The Quay Crane Scheduling Problem , 2014, ECMS.
[117] Dusan Ku,et al. On the abstraction method for the container relocation problem , 2016, Comput. Oper. Res..
[118] Lu Chen,et al. The storage location assignment problem for outbound containers in a maritime terminal , 2012 .
[119] Taesik Lee,et al. Container loading and unloading scheduling for a Mobile Harbor system: a global and local search method , 2013 .
[120] Sabeur Elkosantini,et al. A multi agent system for the online container stacking in seaport terminals , 2019, J. Comput. Sci..
[121] Zhong-Zhong Jiang,et al. Stack pre-marshalling problem: a heuristic-guided branch-and-bound algorithm , 2015 .
[122] Youfang Huang,et al. An efficient approach for solving yard crane scheduling in a container terminal , 2013 .
[123] Feifeng Zheng,et al. A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks , 2019 .
[124] Andreas Bortfeldt,et al. A tree search procedure for the container pre-marshalling problem , 2012, Eur. J. Oper. Res..
[125] Junliang He,et al. Integrated Yard Space Allocation and Yard Crane Deployment Problem in Resource-Limited Container Terminals , 2016, Sci. Program..
[126] Carlos F. Daganzo,et al. THE CRANE SCHEDULING PROBLEM , 1989 .
[127] Nils Boysen,et al. Gantry crane scheduling in intermodal rail-road container terminals , 2018, Int. J. Prod. Res..
[128] Eleni Hadjiconstantinou,et al. Modelling and solution approaches to the multi-load AGV dispatching problem in container terminals , 2011 .
[129] Anibal Tavares de Azevedo,et al. Solving the 3D stowage planning problem integrated with the quay crane scheduling problem by representation by rules and genetic algorithm , 2018, Appl. Soft Comput..
[130] Omid Motlagh,et al. A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals , 2014, J. Comput. Appl. Math..
[131] Eelco van Asperen,et al. Evaluating impact of truck announcements on container stacking efficiency , 2013 .
[132] Katta G. Murty,et al. A decision support system for operations in a container terminal , 2005, Decis. Support Syst..
[133] Kevin Tierney,et al. A biased random-key genetic algorithm for the container pre-marshalling problem , 2016, Comput. Oper. Res..
[134] Li Wang,et al. Integrated scheduling of handling operations in railway container terminals , 2019 .
[135] Loo Hay Lee,et al. Storage yard management for transshipment ports , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).
[136] Jiang Hang Chen. A note on: a flexible crane scheduling methodology for container terminals , 2019 .
[137] Sai Ho Chung,et al. A modified genetic algorithm for quay crane scheduling operations , 2012, Expert Syst. Appl..
[138] Jun Zheng,et al. Multi Resource Scheduling Problem Based on an Improved Discrete Particle Swarm Optimization , 2012 .
[139] Bo Jin,et al. A feasibility-based heuristic for the container pre-marshalling problem , 2017, Eur. J. Oper. Res..
[140] Tao Zhang,et al. Scheduling optimization of yard cranes with minimal energy consumption at container terminals , 2017, Comput. Ind. Eng..
[141] Loo Hay Lee,et al. Short-term space allocation for storage yard management in a transshipment hub port , 2014, OR Spectr..
[142] Kwang Ryel Ryu,et al. Dynamic adjustment of container stacking policy in an automated container terminal , 2011 .
[143] Yi Wang,et al. A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints , 2012, 1210.6896.
[144] Ning Wang,et al. Target-guided algorithms for the container pre-marshalling problem , 2015 .
[145] Tonguç Ünlüyurt,et al. Improved Rehandling Strategies for the Container Retrieval Process , 2012 .
[146] Henry Y. K. Lau,et al. Integrated scheduling of handling equipment at automated container terminals , 2008 .
[147] Wen-Jing Hsu,et al. Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information , 2011, Adv. Eng. Informatics.
[148] Ghaith Rabadi,et al. Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level , 2018, Comput. Oper. Res..
[149] Der-Horng Lee,et al. The Integrated Yard Truck and Yard Crane Scheduling Problem: Benders' Decomposition-Based Methods , 2010 .
[150] Debjit Roy,et al. A stochastic model for the throughput analysis of passing dual yard cranes , 2017, Comput. Oper. Res..
[151] Nasim Nahavandi,et al. A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint , 2019, International Journal of Engineering.
[152] Wei Deng Solvang,et al. A genetic algorithm approach for quay crane scheduling with non-interference constraints at Narvik container terminal , 2012 .
[153] Michel Bierlaire,et al. The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion , 2017, Eur. J. Oper. Res..
[154] Yiqin Lu,et al. The integrated optimization of container terminal scheduling with uncertain factors , 2014, Comput. Ind. Eng..
[155] Kees Jan Roodbergen,et al. Transport operations in container terminals: Literature overview, trends, research directions and classification scheme , 2014, Eur. J. Oper. Res..
[156] Dusan Ku,et al. On double cycling for container port productivity improvement , 2016, Ann. Oper. Res..
[157] Habib Chabchoub,et al. Real-Time Stacking System for dangerous containers in seaport terminals , 2015 .
[158] Weimin Ma,et al. Quay crane scheduling with draft and trim constraints , 2017 .
[159] Yang Li,et al. Truck Scheduling Problem Considering Carbon Emissions under Truck Appointment System , 2019, Sustainability.
[160] Nils Boysen,et al. The parallel stack loading problem to minimize blockages , 2016, Eur. J. Oper. Res..
[161] Ali Diabat,et al. A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem , 2015 .
[162] S.M.T. Fatemi Ghomi,et al. Optimisation of yard crane scheduling considering velocity coefficient and preventive maintenance , 2014 .
[163] Ding Liu,et al. CO2 emission evaluation of yard tractors during loading at container terminals , 2017 .
[164] Tom Cherrett,et al. Study on berth planning problem in a container seaport: Using an integrated programming approach , 2012, Comput. Ind. Eng..
[165] Erhan Kozan,et al. A flexible crane scheduling methodology for container terminals , 2016, Flexible Services and Manufacturing Journal.
[166] Erwin Pesch,et al. Solving the single crane scheduling problem at rail transshipment yards , 2019, Discret. Appl. Math..
[167] Christian Bierwirth,et al. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals , 2015, Eur. J. Oper. Res..
[168] Yuting Zhang,et al. Yard crane scheduling problem in a container terminal considering risk caused by uncertainty , 2019, Adv. Eng. Informatics.
[169] Loo Hay Lee,et al. Information-Based Allocation Strategy for GRID-Based Transshipment Automated Container Terminal , 2018, Transp. Sci..
[170] Li Wang,et al. Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode , 2014, Comput. Intell. Neurosci..
[171] Huang Youfang,et al. Multi-yard-crane routing optimization at container terminals based on a two-stage programming , 2016, 2016 12th International Conference on Natural Computation, Fuzzy Systems and Knowledge Discovery (ICNC-FSKD).
[172] Luca Quadrifoglio,et al. Dispatch Problem of Automated Guided Vehicles for Serving Tandem Lift Quay Crane , 2012 .
[173] Panagiotis Ypsilantis,et al. Collaborative Fleet Deployment and Routing for Sustainable Transport , 2019, Sustainability.
[174] Sai Hong Tang,et al. Multi Objective Optimization of Coordinated Scheduling of Cranes and Vehicles at Container Terminals , 2013 .
[175] Kannan Govindan,et al. Disruption management for truck appointment system at a container terminal: A green initiative , 2016, Transportation Research Part D: Transport and Environment.
[176] Mario Rodríguez-Molins,et al. A GRASP-based metaheuristic for the Berth Allocation Problem and the Quay Crane Assignment Problem by managing vessel cargo holds , 2013, Applied Intelligence.
[177] Amir Hossein Gharehgozli,et al. A simulation study of the performance of twin automated stacking cranes at a seaport container terminal , 2017, Eur. J. Oper. Res..
[178] Lu Zhen,et al. Column Generation for the Integrated Berth Allocation, Quay Crane Assignment, and Yard Assignment Problem , 2018, Transp. Sci..
[179] Felix T.S. Chan,et al. A workload balancing genetic algorithm for the quay crane scheduling problem , 2013 .
[180] Yue Wu,et al. An integrated programming model for storage management and vehicle scheduling at container terminals , 2013 .
[181] Loo Hay Lee,et al. A Review on Yard Management in Container Terminals , 2013 .
[182] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[183] Lifeng Xi,et al. Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal , 2011 .
[184] Octavian Postolache,et al. Adaptive Autotuning Mathematical Approaches for Integrated Optimization of Automated Container Terminal , 2019 .
[185] Sisi Zheng,et al. Using path optimum algorithm to solve slot selection problems for outbound containers of different attributes in container terminals , 2019 .
[186] Lu Zhen,et al. Multi-period yard template planning in container terminals , 2016 .
[187] Ali Haghani,et al. Multiple Equipment Integrated Scheduling and Storage Space Allocation in Rail–Water Intermodal Container Terminals Considering Energy Efficiency , 2019, Transportation Research Record: Journal of the Transportation Research Board.
[188] Qingcheng Zeng,et al. Integrated optimization of pickup sequence and container rehandling based on partial truck arrival information , 2019, Comput. Ind. Eng..
[189] Ali H. Diabat,et al. The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints , 2016, Comput. Ind. Eng..
[190] R. Trunfio,et al. A note on: A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints , 2015 .
[191] Rubén Ruiz,et al. Integer programming models for the pre-marshalling problem , 2019, Eur. J. Oper. Res..
[192] Florian Bruns,et al. Complexity results for storage loading problems with stacking constraints , 2016, Eur. J. Oper. Res..
[193] Xiaoning Zhu,et al. A Novel Two-Stage Heuristic for Solving Storage Space Allocation Problems in Rail-Water Intermodal Container Terminals , 2019, Symmetry.
[194] Dominik Kress,et al. An exact solution approach for scheduling cooperative gantry cranes , 2019, Eur. J. Oper. Res..
[195] Adriana Felicia Gabor,et al. The Time Window Assignment Vehicle Routing Problem , 2012, Transp. Sci..
[196] Guangdong Tian,et al. Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm , 2019, International Journal of Engineering.
[197] Erhan Kozan,et al. Optimising container storage processes at multimodal terminals , 2012, J. Oper. Res. Soc..
[198] Lu Zhen,et al. Modeling of yard congestion and optimization of yard template in container ports , 2016 .
[199] Dayong Yu,et al. Carbon-efficient deployment of electric rubber-tyred gantry cranes in container terminals with workload uncertainty , 2019, Eur. J. Oper. Res..
[200] Lu Zhen,et al. Quay crane scheduling problem with considering tidal impact and fuel consumption , 2017 .
[201] Youfang Huang,et al. A simulation optimization method for internal trucks sharing assignment among multiple container terminals , 2013, Adv. Eng. Informatics.
[202] Xi Chen,et al. Stowage Plan Based Slot Optimal Allocation in Rail-Water Container Terminal , 2017, J. Control. Sci. Eng..
[203] Gokalp Yildiz,et al. Simulated annealing based simulation optimization method for solving integrated berth allocation and quay crane scheduling problems , 2019, Simul. Model. Pract. Theory.
[204] Andrew Lim,et al. Solving the container relocation problem by an improved greedy look-ahead heuristic , 2015, Eur. J. Oper. Res..
[205] Sigrid Knust,et al. Loading, unloading and premarshalling of stacks in storage areas: Survey and classification , 2014, Eur. J. Oper. Res..
[206] Pascal Van Hentenryck,et al. Constraint and Mathematical Programming Models for Integrated Port Container Terminal Operations , 2017, CPAIOR.
[207] Mario Rodríguez-Molins,et al. Intelligent planning for allocating containers in maritime terminals , 2012, Expert Syst. Appl..
[208] Nils Boysen,et al. Cooperative twin-crane scheduling , 2016, Discret. Appl. Math..
[209] Huiling Zhu,et al. Mathematical formulation and heuristic algorithm for the block relocation and loading problem , 2019 .
[210] Kwang Ryel Ryu,et al. Generating a rehandling-free intra-block remarshaling plan for an automated container yard , 2011, J. Intell. Manuf..
[211] Belén Melián-Batista,et al. Pre-Marshalling Problem: Heuristic solution method and instances generator , 2012, Expert Syst. Appl..
[212] Li Wang,et al. A Practical Model for Inbound Container Distribution Organization in Rail-Water Transhipping Terminal , 2018, J. Control. Sci. Eng..
[213] Taesik Lee,et al. A scheduling problem for a novel container transport system: a case of mobile harbor operation schedule , 2013 .
[214] Feifeng Zheng,et al. Scheduling small number of quay cranes with non-interference constraint , 2015, Optim. Lett..
[215] Shan-Huen Huang,et al. Heuristic algorithms for container pre-marshalling problems , 2012, Comput. Ind. Eng..
[216] Ya Li,et al. A bounded two-level dynamic programming algorithm for quay crane scheduling in container terminals , 2018, Comput. Ind. Eng..
[217] Habib Chabchoub,et al. A case based heuristic for container stacking in seaport terminals , 2018, Adv. Eng. Informatics.
[218] Feng Chu,et al. Quay crane scheduling problem with the consideration of maintenance , 2018, 2018 IEEE 15th International Conference on Networking, Sensing and Control (ICNSC).
[219] Loo Hay Lee,et al. Flexible space-sharing strategy for storage yard management in a transshipment hub port , 2013, OR Spectr..
[220] Kap Hwan Kim,et al. A Simulation Study on a Workload-based Operation Planning Method in Container Terminals , 2012 .
[221] Ya Li,et al. Optimization and evaluation of tandem quay crane performance , 2017, 2017 4th International Conference on Systems and Informatics (ICSAI).
[222] Guolei Tang,et al. Performance Comparison of Real-Time Yard Crane Dispatching Strategies at Nontransshipment Container Terminals , 2018 .
[223] Gabriel Lodewijks,et al. Energy-aware control for automated container terminals using integrated flow shop scheduling and optimal control , 2014 .
[224] Houjun Lu,et al. A study on multi-ASC scheduling method of automated container terminals based on graph theory , 2019, Comput. Ind. Eng..
[225] Yun Peng,et al. Optimal allocation of resources for yard crane network management to minimize carbon dioxide emissions , 2016 .
[226] Khaled Ghedira,et al. A Hybrid Method for Assigning Containers to AGVs in Container Terminal , 2015 .
[227] Zhiqiang Lu,et al. A heuristic for the quay crane scheduling problem based on contiguous bay crane operations , 2012, Comput. Oper. Res..
[228] Cynthia Barnhart,et al. Yard Crane Scheduling for container storage, retrieval, and relocation , 2018, Eur. J. Oper. Res..
[229] Sebastián Maldonado,et al. Analytics meets port logistics: A decision support system for container stacking operations , 2019, Decis. Support Syst..
[230] Feng Chu,et al. Framework branch-and-price algorithm for yard management problem at container terminals , 2016, 2016 IEEE 13th International Conference on Networking, Sensing, and Control (ICNSC).
[231] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..