Preventive maintenance policy for multi-component systems subject to random environmental damage generation

This paper presents a preventive maintenance strategy for multi-component systems subject to risk of environmental damage generation. The policy aims to maximize the profit, which includes, amongst others, the environmental damage cost with respect to the threshold amount of damage generated by each component. A numerical procedure is used to determine the optimal maintenance strategy to be adopted for each component.

[1]  E Topuz,et al.  Integration of environmental and human health risk assessment for industries using hazardous materials: a quantitative multi criteria approach for environmental decision makers. , 2011, Environment international.

[2]  Per Hokstad,et al.  An overall model for maintenance optimization , 1996 .

[3]  T. C. McKelvey How to improve the effectiveness of hazard and operability analysis , 1988 .

[4]  Efstratios N. Pistikopoulos,et al.  Minimizing the environmental impact of process Plants: A process systems methodology , 1995 .

[5]  Hong Zhou,et al.  A study of maintenance environment impact evaluation method based on activity , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[6]  C G Vassiliadis,et al.  Maintenance-based strategies for environmental risk minimization in the process industries. , 2000, Journal of hazardous materials.

[7]  Christine Jasch,et al.  The use of Environmental Management Accounting (EMA) for identifying environmental costs , 2003 .

[8]  Riitta Molarius,et al.  Environmental risk analysis for accidental emissions , 2008 .

[9]  Dinesh Kumar,et al.  Predicting uncertain behavior of industrial system using FM - A practical case , 2008, Appl. Soft Comput..

[10]  Robert S. Kaplan,et al.  Management accounting (1984-1994): development of new practice and theory , 1994 .

[11]  Borut Mavko,et al.  Fault tree developed by an object-based method improves requirements specification for safety-related systems , 1999 .

[12]  Efstratios N. Pistikopoulos,et al.  Maintenance scheduling and process optimization under uncertainty , 2001 .

[13]  Fernando Gonçalves Amaral,et al.  An integrated methodology for environmental impacts and costs evaluation in industrial processes , 2009 .

[14]  Cost-benefit analysis and environmental impact assessment , 1990 .