A logistic regression approach to modelling the contractor's decision to bid

Significant factors in the decision to bid process are identified and a pro‐forma to elicit a numerical assessment of these factors is developed and validated using the bid/no‐bid decision‐makers from a UK construction company. Using the pro‐forma, data were collected from the collaborating company for historical bid opportunities. Statistical techniques are used to gain a better understanding of the data characteristics and to model the process. Eight variables have a significant relationship with the decision to bid outcome and for which the decision‐makers are able to discriminate. Factor analysis is used to identify the underlying dimensions of the pro‐forma and to validate functional decomposition of the factors. Finally, two logistic regression models of the decision to bid process are developed. While one model is ultimately rejected, the selected model is capable of classifying the total sample with an overall predictive accuracy rate of 94.8%. The results, therefore, demonstrate that the model functions effectively in predicting the bid/no‐bid decision process.

[1]  M. Gates Bidding Strategies and Probabilities , 1967 .

[2]  D. K. H. Chua,et al.  Key Factors in Bid Reasoning Model , 2000 .

[3]  William R. Park,et al.  Construction Bidding: Strategic Pricing for Profit , 1992 .

[4]  Mohammed Fadhil Dulaimi,et al.  The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore , 2002 .

[5]  Mohammed Wanous,et al.  To bid or not to bid: a parametric solution , 2000 .

[6]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[7]  Tarek Hegazy,et al.  Neural networks as tools in construction , 1991 .

[8]  N. Nagelkerke,et al.  A note on a general definition of the coefficient of determination , 1991 .

[9]  Mohamed Marzouk,et al.  A decision support tool for construction bidding , 2003 .

[10]  Adrian J. Smith Estimating, Tendering and Bidding for Construction , 1995 .

[11]  R. M. Skitmore,et al.  Contract bidding in construction : strategic management and modelling , 1989 .

[12]  Robert I. Carr,et al.  General Bidding Model , 1982 .

[13]  D. A. Turin,et al.  Aspects of the economics of construction , 1975 .

[14]  Irtishad Ahmad Decision‐Support System for Modeling Bid/No‐Bid Decision Problem , 1990 .

[15]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .

[16]  R. Fellows,et al.  An examination of the importance of resource considerations when contractors make project selection decisions , 1992 .

[17]  Chris Chapman,et al.  Developing Competitive Bids: A Framework For Information Processing , 1988 .

[18]  Simaan M. AbouRizk,et al.  UTILITY-THEORY MODEL FOR BID MARKUP DECISIONS , 1996 .

[19]  Patricia M. Hillebrandt,et al.  The Modern Construction Firm , 1990 .

[20]  Ali A. Shash,et al.  SUBCONTRACTORS' BIDDING DECISIONS , 1998 .

[21]  L. Friedman A Competitive-Bidding Strategy , 1956 .

[22]  Peter E.D. Love,et al.  Combining rule-based expert systems and artificial neural networks for mark-up estimation , 1999 .