Multidisciplinary design optimization of hard rock tunnel boring machine using collaborative optimization
暂无分享,去创建一个
Wei Sun | Xueguan Song | Maolin Shi | Xiaobang Wang | Zhuqing Wang | Wei Sun | Xueguan Song | Maolin Shi | Zhu Wang | Xiaobang Wang
[1] Sayan Ghosh,et al. Covariance Matching Collaborative Optimization for Uncertainty-based Multidisciplinary Aircraft Design , 2014 .
[2] Dimitris Kaliampakos,et al. Modelling TBM performance with artificial neural networks , 2004 .
[3] Wei Sun,et al. Multidisciplinary design optimization of tunnel boring machine considering both structure and control parameters under complex geological conditions , 2016 .
[4] Pm Singh. Design and Analysis of a Micro Tunnel Boring Machines (TBM) , 2014 .
[5] Timothy W. Simpson,et al. ATTRIBUTE-BASED MULTIDISCIPLINARY OPTIMIZATION OF UNDERSEA VEHICLES , 2000 .
[6] Hadi Fattahi,et al. Applying Optimized Support Vector Regression Models for Prediction of Tunnel Boring Machine Performance , 2017, Geotechnical and Geological Engineering.
[7] Ping Wang,et al. Multidisciplinary design optimization of vehicle instrument panel based on multi-objective genetic algorithm , 2013 .
[8] Jamal Rostami,et al. Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground , 2016 .
[9] Jaroslaw Sobieszczanski-Sobieski,et al. Multidisciplinary aerospace design optimization - Survey of recent developments , 1996 .
[10] Tiago F. S. Miranda,et al. Prediction of hard rock TBM penetration rate based on Data Mining techniques , 2013 .
[11] Wu Guangqiang. Multidisciplinary Design Optimization of Vehicle Body Structure Based on Collaborative Optimization and Multi-objective Genetic Algorithm , 2011 .
[12] Danial Jahed Armaghani,et al. Performance prediction of tunnel boring machine through developing a gene expression programming equation , 2017, Engineering with Computers.
[13] Reza Mikaeil,et al. Optimization of Tunnel Boring Machine (TBM) Disc Cutter Spacing in Jointed Hard Rock Using a Distinct Element Numerical Simulation , 2016 .
[14] Ilan Kroo,et al. Implementation and Performance Issues in Collaborative Optimization , 1996 .
[15] G. Wijk. A model of tunnel boring machine performance , 1992 .
[16] Soo-Ho Chang,et al. Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method , 2010 .
[17] Yimin Xia,et al. Design Optimization of TBM Disc Cutters for Different Geological Conditions , 2015 .
[18] Pier Davide Ciampa,et al. Multidisciplinary Design Optimization in a Collaborative Distributed Aircraft Design System , 2012 .
[19] O. Acaroglu,et al. A fuzzy logic model to predict specific energy requirement for TBM performance prediction , 2008 .
[20] Fred Hapgood. The underground cutting edge , 2004 .