Note on minimizing total tardiness in a two-machine flowshop
暂无分享,去创建一个
[1] Christos Koulamas,et al. The Total Tardiness Problem: Review and Extensions , 1994, Oper. Res..
[2] Jen-Shiang Chen,et al. Minimizing tardiness in a two-machine flow-shop , 2002, Comput. Oper. Res..
[3] Jason Chao-Hsien Pan,et al. Two-machine flowshop scheduling to minimize total tardiness , 1997, Int. J. Syst. Sci..
[4] Yeong-Dae Kim,et al. A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops , 1993, Comput. Oper. Res..
[5] Jatinder N. D. Gupta,et al. The two-machine flowshop scheduling problem with total tardiness , 1989, Comput. Oper. Res..