The introduction of diagnostics into the maintenance and operation of high voltage plant should show clear benefits if it is to be a useful tool in running a competitive electricity distribution company. This paper shows that the potential is certainly there, but some investment is required if the potential is to be realized. In a regulated business, this may be one of the essential tools in cost reduction and hence in competitive advantage. The examples of diagnostic methods applied to a network, come from London’s 11kV cable network.
[1] R. R. Mackinlay,et al. Some advances in PD monitoring for high voltage cables , 1998 .
[2] C. M. Walton. Detecting and locating MV failure before it occurs. Experience with live line partial discharge detection on underground paper insulated 11 kV cables in London , 2001 .
[3] C. L. Bowmer. On-line diagnostic trials on London Electricity's 11 kV cable system , 2000 .