Performance measurement: roles and challenges

Purpose – The purpose of this paper is to identify the past and present practices, and the future roles of performance measurement in the Thai public sector. It is part of a transformation effort initiated by the Office of the Public Sector Development Commission (OPDC) on m‐government – more mobile, responsive, and flexible government. The paper also aims to identify possible roadblocks from successfully integrating performance measurement into a management process.Design/methodology/approach – In‐depth interviews with 12 executives and top administrators from private firms and public agencies, and document reviews are performed. The analysis on the participants' opinions is based on the applications of the grounded theory. The interview's findings are verified with document reviews. The roadblocks are identified and substantiated by two experts.Findings – For past and present practices, performance measurement is part of management tool and responsibility, a quality management system, and a learning org...

[1]  Benjamin S. Blanchard System Engineering and Management , 1994 .

[2]  Jay Liebowitz,et al.  Will knowledge management work in the government? , 2004, Electron. Gov. an Int. J..

[3]  W. Eggers Government 2.0: Using Technology to Improve Education, Cut Red Tape, Reduce Gridlock, and Enhance Democracy , 2004 .

[4]  Antti Lönnqvist,et al.  Performance measurement systems in the Finnish public sector , 2007 .

[5]  D. Scott Sink,et al.  Productivity management : planning, measurement and evaluation, control, and improvement , 1985 .

[6]  Chimay J. Anumba,et al.  STEPS: a knowledge management maturity roadmap for corporate sustainability , 2006, Bus. Process. Manag. J..

[7]  Paula Mettänen,et al.  Design and implementation of a performance measurement system for a research organization , 2005 .

[8]  M. Broadbent Measuring business performance , 1999 .

[9]  Zoe Radnor,et al.  Developing an understanding of results‐based management through public value theory , 2007 .

[10]  Alexander Kouzmin,et al.  Towards learning for agency effectiveness , 1999 .

[11]  D. S. Sink,et al.  Planning and Measurement in Your Organization of the Future , 1989 .

[12]  Srinivas Talluri,et al.  A Model for Monitoring Supplier Performance , 2002 .

[13]  Julie Gauthier,et al.  Results using the balanced scorecard in the public sector , 2004 .

[14]  J. McNiven Governing by Network: The New Shape of the Public Sector. Stephen Goldsmith and William D. Eggers. Forward by Professor Donald F. Kettl. (2004). , 2009 .

[15]  David J. Sumanth,et al.  Total Productivity Management , 1997 .

[16]  Bo Edvardsson,et al.  Quality improvement in governmental services : The role of change pressure exerted by the -market-, , 2006 .

[17]  Jeffrey Roy,et al.  E-service delivery and new governance capacities: 'Service Canada' as a case study , 2006, Int. J. Serv. Technol. Manag..

[18]  Amjed S. Al-Fahoum,et al.  An innovative model for university-industry partnership , 2008 .

[19]  A. Gore From Red Tape to Results: Creating a Government That Works Better and Costs Less , 2001 .

[20]  R. Dorf,et al.  The Balanced Scorecard: Translating Strategy Into Action , 1997, Proceedings of the IEEE.

[21]  Alireza Shokri,et al.  Business performance management , 2011 .

[22]  Peter B. Meyer,et al.  Preliminary estimates of multifactor productivity growth , 2005 .

[23]  Sandra Tillema,et al.  Public sector performance measurement in developing countries: a literature review and research agenda , 2007 .

[24]  Daniel A. Levinthal,et al.  ABSORPTIVE CAPACITY: A NEW PERSPECTIVE ON LEARNING AND INNOVATION , 1990 .

[25]  Hang Nguyen,et al.  Cross-generational knowledge flows in edge organizations , 2007, Ind. Manag. Data Syst..

[26]  Christina Goulding Grounded Theory: A Practical Guide for Management, Business and Market Researchers , 2002 .

[27]  Alfred J. Nanni,et al.  The New Performance Challenge: Measuring Operations for World-Class Competition , 1990 .

[28]  Gerald Steiner Supporting sustainable innovation through stakeholder management: a systems view , 2008 .

[29]  John Duke,et al.  Multifactor Productivity Change in the Air Transportation Industry: Productivity Increases in the U.S. Airline Industry-The Nation's Primary Intercity Mass Transportation System-Have Played a Significant Role in the Industry's Cost-Containment Efforts and Its Ability to Accelerate Growth , 2005 .

[30]  Vicky Rich Interpreting the balanced scorecard: an investigation into performance analysis and bias , 2007 .

[31]  Robert J. Vokurka,et al.  Operationalising the balanced scorecard using the Malcolm Baldrige Criteria for Performance Excellence (MBCPE) , 2004 .

[32]  Ralph Mosser Barnes,et al.  Motion and Time Study: Design and Measurement of Work , 1968 .

[33]  Silvana Trimi,et al.  M-government: technologies, applications and challenges , 2008, Electron. Gov. an Int. J..

[34]  Zahirul Hoque,et al.  Measuring and reporting public sector outputs/outcomes: Exploratory evidence from Australia , 2008 .

[35]  Robert Johnston,et al.  Exploring strategy‐misaligned performance measurement , 2008 .

[36]  Tahir M. Nisar,et al.  Value for money drivers in public private partnership schemes , 2007 .

[37]  Anselm L. Strauss,et al.  Qualitative Analysis For Social Scientists , 1987 .

[38]  Andy Neely,et al.  Business performance measurement: Performance measurement – practical applications , 2002 .

[39]  W. Eggers,et al.  Governing by Network: The New Shape of the Public Sector , 2004 .