Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida

AbstractThe choice of construction delivery system is one of the most important decisions that a public highway agency will make with regard to a highway, bridge, or transit construction project. Although several research projects have been conducted on the subject of comparing costs and project duration, there has been no study that statistically analyzes these factors specifically for transportation projects, much less one that eliminates the largest variable of all: different public agencies. The objective of the research reported in this paper was to determine which of two delivery methods, design-bid-build (DBB) and design-build (DB), delivers highway and bridge construction projects at the lowest cost and in the shortest time period, and to back up the findings with a rigorous statistical analysis of the data. Data were taken from the databases of the Florida Department of Transportation (FDOT) and arithmetically and statistically compared through Levene’s test, the independent samples t-test, the W...

[1]  C. William Ibbs,et al.  Project delivery systems and project change: Quantitative analysis , 2003 .

[2]  Douglas D. Gransberg,et al.  Communicating Design Quality Requirements for Public Sector Design/Build Projects , 2008 .

[3]  Wei Tong Chen,et al.  Setting maximum incentive for Incentive/Disincentive contracts for highway projects , 2004 .

[4]  Keith R. Molenaar,et al.  Best-Value Procurement Methods for Highway Construction Projects , 2006 .

[5]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[6]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[7]  Keith R. Molenaar,et al.  Decision Support System for Selection of Project Delivery Method in Transit , 2009 .

[8]  D D Gransberg,et al.  DESIGN-BUILD CONTRACT AWARD METHODS FOR TRANSPORTATION PROJECTS. TECHNICAL NOTE , 1999 .

[9]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[10]  G. Ruxton The unequal variance t-test is an underused alternative to Student's t-test and the Mann–Whitney U test , 2006 .

[11]  Keith R. Molenaar,et al.  MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .

[12]  Keith R. Molenaar,et al.  PUBLIC-SECTOR DESIGN/BUILD EVOLUTION AND PERFORMANCE , 1999 .

[13]  Anthony D. Songer,et al.  PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD , 1997 .

[14]  G. Edward Gibson,et al.  Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods , 2009 .