Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
暂无分享,去创建一个
Xiaoxiao Li | R. Edward Minchin | Raja R. A. Issa | Gary G. Vargas | R. Issa | R. Minchin | Xiaoxiao Li | Gary G. Vargas
[1] C. William Ibbs,et al. Project delivery systems and project change: Quantitative analysis , 2003 .
[2] Douglas D. Gransberg,et al. Communicating Design Quality Requirements for Public Sector Design/Build Projects , 2008 .
[3] Wei Tong Chen,et al. Setting maximum incentive for Incentive/Disincentive contracts for highway projects , 2004 .
[4] Keith R. Molenaar,et al. Best-Value Procurement Methods for Highway Construction Projects , 2006 .
[5] Mark Konchar,et al. Comparison of U.S. Project Delivery Systems , 1998 .
[6] Albert P.C. Chan,et al. Framework of Success Criteria for Design/Build Projects , 2002 .
[7] Keith R. Molenaar,et al. Decision Support System for Selection of Project Delivery Method in Transit , 2009 .
[8] D D Gransberg,et al. DESIGN-BUILD CONTRACT AWARD METHODS FOR TRANSPORTATION PROJECTS. TECHNICAL NOTE , 1999 .
[9] John Messner,et al. Comparing procurement methods for design-build projects , 2006 .
[10] G. Ruxton. The unequal variance t-test is an underused alternative to Student's t-test and the Mann–Whitney U test , 2006 .
[11] Keith R. Molenaar,et al. MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .
[12] Keith R. Molenaar,et al. PUBLIC-SECTOR DESIGN/BUILD EVOLUTION AND PERFORMANCE , 1999 .
[13] Anthony D. Songer,et al. PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD , 1997 .
[14] G. Edward Gibson,et al. Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods , 2009 .