Single-machine scheduling with a variable maintenance activity
暂无分享,去创建一个
[1] Chung-Yee Lee,et al. Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint , 1997, Oper. Res. Lett..
[2] T. C. Edwin Cheng,et al. Single-machine scheduling with periodic maintenance to minimize makespan , 2007, Comput. Oper. Res..
[3] Guoqing Wang,et al. Preemptive Scheduling with Availability Constraints to Minimize Total Weighted Completion Times , 2005, Ann. Oper. Res..
[4] Yang Yang,et al. Reheat furnace scheduling with energy consideration , 2015 .
[5] Imed Kacem. Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval , 2008, Comput. Ind. Eng..
[6] Vitaly A. Strusevich,et al. Planning Machine Maintenance in Two-Machine Shop Scheduling , 2006, Oper. Res..
[7] Chung-Yee Lee,et al. Single machine flow-time scheduling with scheduled maintenance , 1992, Acta Informatica.
[8] Günter Schmidt,et al. Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..
[9] Chung-Yee Lee,et al. Machine scheduling with an availability constraint , 1996, J. Glob. Optim..
[10] Chengbin Chu,et al. Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period , 2008, Eur. J. Oper. Res..
[11] Leen Stougie,et al. Universal Sequencing on an Unreliable Machine , 2012, SIAM J. Comput..
[12] Yazid Mati,et al. Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability , 2010, Comput. Ind. Eng..
[13] Lin Chen,et al. Approximation Algorithms for Scheduling with a Variable Machine Maintenance , 2010, AAIM.
[14] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[15] Hans Kellerer,et al. Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval , 2009, Eur. J. Oper. Res..
[16] Chengbin Chu,et al. A survey of scheduling with deterministic machine availability constraints , 2010, Comput. Ind. Eng..
[17] Xiangtong Qi,et al. Scheduling the maintenance on a single machine , 1999, J. Oper. Res. Soc..
[18] Julien Moncel,et al. Computational performances of a simple interchange heuristic for a scheduling problem with an availability constraint , 2014, Comput. Ind. Eng..
[19] Gur Mosheiov,et al. Heuristics for scheduling problems with an unavailability constraint and position-dependent processing times , 2012, Comput. Ind. Eng..
[20] Han Hoogeveen,et al. Minimizing the number of late jobs when the start time of the machine is variable , 2012, Oper. Res. Lett..
[21] T. C. Edwin Cheng,et al. Unrelated parallel-machine scheduling with deteriorating maintenance activities , 2011, Comput. Ind. Eng..
[22] Bin Fu,et al. Exponential inapproximability and FPTAS for scheduling with availability constraints , 2009, Theor. Comput. Sci..
[23] Chung-Yee Lee. Two-machine flowshop scheduling with availability constraints , 1999, Eur. J. Oper. Res..
[24] Dehua Xu,et al. Scheduling jobs under increasing linear machine maintenance time , 2010, J. Sched..
[25] Chengbin Chu,et al. Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times , 2008, Comput. Oper. Res..
[26] Zhi-Long Chen,et al. Scheduling jobs and maintenance activities on parallel machines , 2000 .
[27] Gur Mosheiov,et al. Scheduling a deteriorating maintenance activity on a single machine , 2010, J. Oper. Res. Soc..
[28] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[29] Ling Cheng,et al. Note on "Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activity" , 2014, Comput. Ind. Eng..