Single-machine scheduling with a variable maintenance activity

We consider the problem of scheduling a maintenance activity and jobs on a single machine, where the maintenance activity must start before a given deadline and the maintenance duration increases with its starting time. We provide polynomial-time algorithms to solve the problems to minimize the makespan, sum of completion times, maximum lateness, and number of tardy jobs.

[1]  Chung-Yee Lee,et al.  Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint , 1997, Oper. Res. Lett..

[2]  T. C. Edwin Cheng,et al.  Single-machine scheduling with periodic maintenance to minimize makespan , 2007, Comput. Oper. Res..

[3]  Guoqing Wang,et al.  Preemptive Scheduling with Availability Constraints to Minimize Total Weighted Completion Times , 2005, Ann. Oper. Res..

[4]  Yang Yang,et al.  Reheat furnace scheduling with energy consideration , 2015 .

[5]  Imed Kacem Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval , 2008, Comput. Ind. Eng..

[6]  Vitaly A. Strusevich,et al.  Planning Machine Maintenance in Two-Machine Shop Scheduling , 2006, Oper. Res..

[7]  Chung-Yee Lee,et al.  Single machine flow-time scheduling with scheduled maintenance , 1992, Acta Informatica.

[8]  Günter Schmidt,et al.  Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..

[9]  Chung-Yee Lee,et al.  Machine scheduling with an availability constraint , 1996, J. Glob. Optim..

[10]  Chengbin Chu,et al.  Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period , 2008, Eur. J. Oper. Res..

[11]  Leen Stougie,et al.  Universal Sequencing on an Unreliable Machine , 2012, SIAM J. Comput..

[12]  Yazid Mati,et al.  Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability , 2010, Comput. Ind. Eng..

[13]  Lin Chen,et al.  Approximation Algorithms for Scheduling with a Variable Machine Maintenance , 2010, AAIM.

[14]  J. M. Moore An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .

[15]  Hans Kellerer,et al.  Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval , 2009, Eur. J. Oper. Res..

[16]  Chengbin Chu,et al.  A survey of scheduling with deterministic machine availability constraints , 2010, Comput. Ind. Eng..

[17]  Xiangtong Qi,et al.  Scheduling the maintenance on a single machine , 1999, J. Oper. Res. Soc..

[18]  Julien Moncel,et al.  Computational performances of a simple interchange heuristic for a scheduling problem with an availability constraint , 2014, Comput. Ind. Eng..

[19]  Gur Mosheiov,et al.  Heuristics for scheduling problems with an unavailability constraint and position-dependent processing times , 2012, Comput. Ind. Eng..

[20]  Han Hoogeveen,et al.  Minimizing the number of late jobs when the start time of the machine is variable , 2012, Oper. Res. Lett..

[21]  T. C. Edwin Cheng,et al.  Unrelated parallel-machine scheduling with deteriorating maintenance activities , 2011, Comput. Ind. Eng..

[22]  Bin Fu,et al.  Exponential inapproximability and FPTAS for scheduling with availability constraints , 2009, Theor. Comput. Sci..

[23]  Chung-Yee Lee Two-machine flowshop scheduling with availability constraints , 1999, Eur. J. Oper. Res..

[24]  Dehua Xu,et al.  Scheduling jobs under increasing linear machine maintenance time , 2010, J. Sched..

[25]  Chengbin Chu,et al.  Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times , 2008, Comput. Oper. Res..

[26]  Zhi-Long Chen,et al.  Scheduling jobs and maintenance activities on parallel machines , 2000 .

[27]  Gur Mosheiov,et al.  Scheduling a deteriorating maintenance activity on a single machine , 2010, J. Oper. Res. Soc..

[28]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[29]  Ling Cheng,et al.  Note on "Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activity" , 2014, Comput. Ind. Eng..