Installation Technology of 9.2 km Corridor Belt Conveyor

During the process of installing 9.2 km corridor belt conveyor,successfully solved the poor construction sites and road problems.Especially for the traction program of steel structure in Haihe-crossing Bridge,a large-span steel trestle was smoothly installed to solve the rubber belt run-out in hyperbolic long-span conveyer,to ensure a smooth operation for the equipment and a well environment for the port.