Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction
暂无分享,去创建一个
[1] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[2] Fayez F. Boctor. The G-group heuristic for single machine lot scheduling , 1987 .
[3] Robert C. Leachman,et al. Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine , 1991 .
[4] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .
[5] B. Deuermeyer,et al. A By-Product Production System with an Alternative , 1978 .
[6] Lawrence M. Wein,et al. Dynamic scheduling of a production/inventory system with by-products and random yield , 1995 .
[7] Brian G. Kingsman,et al. The economic lot scheduling problem: theory and practice , 1991 .
[8] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[9] Gabriel R. Bitran,et al. Co-Production Processes with Random Yields in the Semiconductor Industry , 1994, Oper. Res..
[10] Gabriel R. Bitran,et al. Ordering Policies in an environment of Stochastic Yields and Substitutable Demands , 1992, Oper. Res..
[11] John M. Wilson,et al. The capacitated lot sizing problem: a review of models and algorithms , 2003 .
[12] D. P. Donk,et al. Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand , 2004 .
[13] Dong X. Shaw,et al. Complexity of the ELSP with general cyclic schedules , 1997 .
[14] Anders Segerstedt,et al. Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand , 2005 .
[15] Roger C. Vergin,et al. Scheduling Rules For The Multiple Product Single Machine System With Stochastic Demand , 1978 .
[16] R. W. Haessler. An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem , 1979 .
[17] Julio Juan García Sabater,et al. ELSP Variants: A review , 2008 .
[18] Taner Bilgiç,et al. Economic lot scheduling with uncontrolled co-production , 2008, Eur. J. Oper. Res..
[19] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .
[20] Peter L. Jackson,et al. A review of the stochastic lot scheduling problem 1 This paper is based upon work supported in part , 1999 .
[21] S. Eilon. Scheduling for batch production , 1957 .
[22] Wilbert E. Wilhelm,et al. Scheduling and lot sizing with sequence-dependent setup: A literature review , 2006 .
[23] Robert C. Leachman,et al. A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands , 1988 .
[24] Robert C. Leachman,et al. Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics , 1994 .
[25] Luis M. Romeo,et al. Enhanced coal gasification heated by unmixed combustion integrated with an hybrid system of SOFC/GT , 2008 .
[26] P. C. Jones,et al. When Is The Economic Lot Scheduling Problem Easy , 1989 .
[27] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .