Single Stage Minimum Absolute Lateness Problem with a Common Due Date on Non-Identical Machines
暂无分享,去创建一个
[1] Yih-Long Chang,et al. MINIMIZING MEAN ABSOLUTE DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE. , 1986 .
[2] J. J. Kanet. Minimizing the average deviation of job completion times about a common due date , 1981 .
[3] Jan Karel Lenstra,et al. Sequencing and scheduling : an annotated bibliography , 1997 .
[4] P Dileepan,et al. Bicriterion static scheduling research for a single machine , 1988 .
[5] Hamilton Emmons,et al. Scheduling to a common due date on parallel uniform processors , 1987 .
[6] T.C.E. Cheng,et al. A Heuristic for Common Due-date Assignment and Job Scheduling on Parallel Machines , 1989 .
[7] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[8] Mesbah U. Ahmed,et al. Minimizing the sum of absolute lateness in single‐machine and multimachine scheduling , 1984 .
[9] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[10] Edward G. Coffman,et al. Scheduling independent tasks to reduce mean finishing time , 1974, CACM.
[11] S. S. Panwalkar,et al. Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem , 1982, Oper. Res..