NUCLEAR ENERGY AGENCY COMMITTEE ON THE SAFETY OF NUCLEAR INSTALLATIONS OECD/CSNI SPECIALIST MEETING ON NUCLEAR AEROSOLS IN REACTOR SAFETY

7 Acknowledgement 7 List of Abbreviation 13

[1]  J. E. Groves,et al.  Made in America: Science, Technology and American Modernist Poets , 1989 .

[2]  D. D. Woods,et al.  The Cognitive Environment Simulation as a tool for modeling human performance and reliability , 1990 .

[3]  A. N. Beare,et al.  A Simulator-Based Study of Human Errors in Nuclear Power Plant Control Room Tasks , 1983 .

[4]  William G. Johnson,et al.  Mort Safety Assurance Systems , 1980 .

[5]  George Apostolakis,et al.  The work process analysis model (WPAM) , 1994 .

[6]  R. D. Pfremmer,et al.  HTGR accident initiation and progression analysis status report. Volume II. AIPA risk assessment methodology , 1975 .

[7]  G. Degen,et al.  ESAP, an easy-to-use expert system for the systematic analysis of operator actions within the scope of probabilistic risk assessment , 1995 .

[8]  Robert G. Bea Human and organization factors: engineering operating safety into offshore structures , 1998 .

[9]  Francesco Saverio D'Auria,et al.  Thermohydraulics of Emergency Core Cooling in Light Water Reactors - A State-of-the-Art Report. CSNI Report , 1989 .

[10]  Karlene H. Roberts,et al.  The Self-Designing High-Reliability Organization: Aircraft Carrier Flight Operations at Sea , 1987 .

[11]  R. Mcguire Probabilistic seismic hazard analysis and design earthquakes: Closing the loop , 1995, Bulletin of the Seismological Society of America.

[12]  C. Andrade,et al.  Quantitative measurements of corrosion rate of reinforcing steels embedded in concrete using polarization resistance measurements , 1978 .

[13]  J. Arlin Cooper,et al.  The Utility of Passive Systems for Safety and Reliability , 1997 .

[14]  Sebastián Feliu,et al.  Confinement of the Electrical Signal for in Situ Measurement of Polarization Resistance in Reinforced Concrete , 1990 .

[15]  Françoise Decortis,et al.  COSIMO: A cognitive simulation model of human decision making and behavior in accident management of complex plants , 1992, IEEE Trans. Syst. Man Cybern..

[16]  Carmen Andrade,et al.  Errors in the electrochemical evaluation of very small corrosion rates—I. polarization resistance method applied to corrosion of steel in concrete , 1985 .

[17]  D.C. Bley,et al.  Quantification of human error rates using a SLIM-based approach , 1988, Conference Record for 1988 IEEE Fourth Conference on Human Factors and Power Plants,.

[18]  Helmut E. Knee,et al.  Maintenance Personnel Performance Simulation (MAPPS) model: description of model content, structure, and sensitivity testing. Volume 2 , 1984 .

[19]  J.V.H. Sanderson IEEE Recommended Practice for Protection and Co-ordination of Industrial and Commercial Power Systems , 1989 .

[20]  H. Buchner,et al.  Comparative evaluation of active vs passive system designs , 1994 .

[21]  C. Cornell,et al.  Disaggregation of seismic hazard , 1999 .

[22]  Vicente Feliu,et al.  ON-SITE DETERMINATION OF THE POLARIZATION RESISTANCE IN A REINFORCED CONCRETE BEAM , 1988 .

[23]  L. Hochreiter,et al.  Application of PWR LOCA margin with the revised Appendix K rule , 1992 .

[24]  John M. O'Hara,et al.  Human Systems Interface and Plant Modernization Process: Technical Basis and Human Factors Review Guidance , 2000 .

[25]  W. J. Hall,et al.  DEVELOPMENT OF CRITERIA FOR SEISMIC REVIEW OF SELECTED NUCLEAR POWER PLANTS , 1977 .

[26]  Robert J. Budnitz,et al.  Recommendations for probabilistic seismic hazard analysis: Guidance on uncertainty and use of experts , 1997 .

[27]  C. B. Cooper,et al.  IEEE Recommended Practice for Electric Power Distribution for Industrial Plants , 1987 .

[28]  Sonja B. Haber,et al.  Organizational processes and nuclear power plant safety , 1994 .

[29]  G. Reina,et al.  DYLAM-1 : a software package for event sequence and consequence spectrum methodology , 1984 .

[30]  Antonio Pugliese,et al.  Attenuation of peak horizontal acceleration and velocity from italian strong-motion records , 1987 .

[31]  G Apostolakis Organisational factors and nuclear power plant safety , 1998 .

[32]  G. G. Stokes "J." , 1890, The New Yale Book of Quotations.

[33]  G. W. Parry,et al.  Trial application of a technique for human error analysis (ATHEANA) , 1996 .

[34]  Roger A. Kisner,et al.  Methodology for allocating nuclear power plant control functions to human or automatic control , 1983 .

[35]  Gene I. Rochlin Technology and adaptive hierarchy : formal and informal organization for flight operations in the U.S. Navy , 1988 .

[36]  M. K. Ravindra,et al.  Seismic fragilities for nuclear power plant risk studies , 1984 .

[37]  M. Bourrier,et al.  Compliance as a strategy , 1994 .

[38]  W. L. Ferrell,et al.  Analysis of core damage frequency from internal events: Peach Bottom, Unit 2 , 1986 .

[39]  David M. Perkins,et al.  SEISRISK III; a computer program for seismic hazard estimation , 1987 .

[40]  Mathilde Bourrier Constructing organisational reliability: the problem of embeddedness and duality , 1998 .

[41]  Ergonomic requirements for office work with visual display terminals ( VDTs ) — Part 11 : Guidance on usability , 1998 .

[42]  L. Burgazzi,et al.  RELIABILITY ASSESSMENT OF PASSIVE SAFETY SYSTEMS , 1998 .

[43]  Kazuhiro Kiyokawa,et al.  Overview of human factors research in Japan , 1992 .

[44]  L. Phillips,et al.  A socio-technical approach to assessing human reliability , 1990 .

[45]  M. Landau On the Concept of a Self-Correcting Organization , 1973 .

[46]  H. Bungum,et al.  Attenuation models inferred from intraplate earthquake recordings , 1990 .

[47]  Washington Human-system interface design review guideline -- Reviewer`s checklist: Final report. Revision 1, Volume 2 , 1996 .

[48]  William F. Stubler,et al.  Human Factors Engineering Guidance for the Review of Advanced Alarm Systems , 1994 .

[49]  M. T. Drouin,et al.  Analysis of core damage frequency from internal events, Grand Gulf, Unit 1: Main report , 1987 .

[50]  Francesco Saverio D'Auria,et al.  Overview of Uncertainty Issues and Methodologies , 1998 .

[51]  D. A. Seaver,et al.  Procedures for using expert judgment to estimate human-error probabilities in nuclear power plant operations. [PWR; BWR] , 1983 .

[52]  Robert J. Budnitz,et al.  Relay chatter and operator response after a large earthquake: An improved PRA methodology with case studies , 1987 .

[53]  J. N. O'Brien,et al.  Multiple-sequential failure model: evaluation of and procedures for human error dependency , 1985 .

[54]  J. F. Pignatel,et al.  Theoretical Design and Assessment of Isolation Condenser System Controlled with Thermal Valve Device , 1998 .

[55]  O. Sträter A Method for Human Reliability Data Collection and Assessment , 1996 .

[56]  J. V. Ramsdell,et al.  Tornado climatology of the contiguous United States , 1986 .

[57]  Robin K. McGuire,et al.  Seismic design spectra and mapping procedures using hazard analysis based directly on oscillator response , 1977 .

[58]  A. J. Spurgin,et al.  Advances in human reliability analysis methodology. Part I: frameworks, models and data , 1994 .

[59]  R. Duncan Organizations and Their Environments. , 1974 .

[60]  Norbert K. Semmer,et al.  Situational assessment of safety culture , 1998 .

[61]  Jorge Daniel Riera,et al.  On the consideration of phenomenological uncertainty , 1997 .

[62]  Eugene A. Rosa,et al.  Organizations, Uncertainties, and Risk. , 1992 .

[63]  W. Edwards How to Use Multi-Attribute Utility Measurement for Social Decision Making , 1976 .

[64]  M. O'hare,et al.  Searching for Safety , 1990 .

[65]  E. J. Kozinsky,et al.  Criteria for safety-related nuclear power plant operator actions: initial simulator to field data calibration. [PWR; BWR] , 1983 .

[66]  A. D. Swain,et al.  Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report , 1983 .

[67]  Paul S. Fischbeck,et al.  PRA as a management tool: organizational factors and risk-based priorities for the maintenance of the tiles of the space shuttle orbiter , 1993 .

[68]  P. C. Cacciabue,et al.  A Dynamic HRA Method Based on a Taxonomy and a Cognitive Simulation Model , 1996 .

[69]  F. D'auria,et al.  Outline of the uncertainty methodology based on accuracy extrapolation , 1995 .

[70]  Kanichi Takagi,et al.  Human error and human reliability , 1967 .

[71]  Harold S. Blackman,et al.  INTENT: a method for estimating human error probabilities for decisionbased errors , 1992 .

[72]  Byung-Ho Lee,et al.  Development of an uncertainty quantification method of the best estimate large LOCA analysis , 1992 .

[73]  Shunsuke Kondo Probabilistic safety assessment of nuclear power plants. , 1986 .

[74]  R. P. Kennedy,et al.  Subsystem response review. Seismic Safety Margins Research Program , 1981 .

[75]  K. Weick,et al.  Collective mind in organizations: Heedful interrelating on flight decks. , 1993 .

[76]  K. Weick Organizational Culture as a Source of High Reliability , 1987 .

[77]  Constantine P. Tzanos,et al.  Thermal-hydraulic unreliability of passive systems , 1995 .

[78]  M. Elisabeth Paté-Cornell,et al.  Human and management factors in probabilistic risk analysis: the SAM approach and observations from recent applications , 1996 .

[79]  Beirn Wahlstrem Finnish and Swedish practices in nuclear safety , 1998 .

[80]  D. E. Embrey,et al.  Incorporating management and organisational factors into probabilistic safety assessment , 1992 .

[81]  D. L. Bernreuter,et al.  Application of the SSMRP methodology to the seismic risk at the Zion Nuclear Power Plant , 1983 .

[82]  J. N. O'Brien,et al.  Influence of organizational factors on performance reliability , 1991 .

[83]  Erik Hollnagel,et al.  Cognitive reliability and error analysis method , 1998 .

[84]  Bernhard Zimolong,et al.  Empirical evaluation of THERP, SLIM and ranking to estimate HEPs , 1992 .

[85]  R. P. Kennedy,et al.  Probabilistic seismic safety study of an existing nuclear power plant , 1980 .

[86]  Vinh Ngoc Dang Modeling operator cognition for accident sequence analysis : development of an operator-plant simulation , 1996 .

[87]  Yushi Fujita Human reliability analysis: a human point of view , 1992 .

[88]  Ed M. Dougherty A note on HRA at PSAM-II , 1994 .

[89]  John C. Devine Conceptual benefits of passive nuclear power plants and their effect on component design , 1996 .

[90]  G. Grote,et al.  Understanding Safety Culture in Organizations — The Concept of Total Safety Management and Its Practical Use in Audit Instruments , 1997 .

[91]  R E Hall,et al.  Post-event human decision errors: operator action tree/time reliability correlation , 1982 .

[92]  M. Bourrier Une analyse stratégique de la fiabilité organisationnelle : organisation des activités de maintenance dans quatre centrales nucléaires en France et aux Etats-unis , 1996 .

[93]  A. D. Swain Accident Sequence Evaluation Program: Human reliability analysis procedure , 1987 .

[94]  N. O. Siu,et al.  Dynamic event tree analysis method (DETAM) for accident sequence analysis , 1991 .

[95]  George Apostolakis,et al.  Incorporating organizational factors into risk assessment through the analysis of work processes , 1994 .

[96]  Johannes Mertens,et al.  Development of advanced methods and related software for human reliability evaluation within probabilistic safety analyses , 1994 .

[97]  Harry F. Martz,et al.  On comparing PRA results with operating experience , 1998 .

[98]  Marcel Pourbaix,et al.  Lectures on Electrochemical Corrosion , 1973 .

[99]  R. P. Kennedy,et al.  A seismic margin assessment procedure , 1988 .

[100]  Ieee Standards Board IEEE standard criteria for the protection of class 1E power systems and equipment in nuclear power generating stations , 1990 .

[101]  A. J. Spurgin,et al.  Systematic Human Action Reliability Procedure (SHARP) , 1984 .

[102]  Francesco Saverio D'Auria,et al.  Methodology for the evaluation of the reliability of passive systems , 2000 .

[103]  Erik Hollnagel,et al.  Human Reliability Analysis: Context and Control , 1994 .

[104]  L. Reiter,et al.  Procedural and submittal guidance for the individual plant examination of external events (IPEEE) for severe accident vulnerabilities , 1991 .

[105]  O. Sträter Assessment Of Cognitive Errors And Organizational Aspects Based On Evaluation Of Plant Experience , 1996 .

[106]  A. Poucet Survey of methods used to assess human reliability in the human factors reliability Benchmark exercise , 1988 .

[107]  Hee-Dong Kim,et al.  A Formal Procedure for Probabilistic Quantification of Modeling Uncertainties Employed in Phenomenological Transient Models , 2000 .

[108]  M. Cushing,et al.  Atlas of macroseismic maps for French earthquakes with their principal characteristics , 1994 .

[109]  C. Cornell Engineering seismic risk analysis , 1968 .

[110]  Mathilde Bourrier,et al.  Elements for designing a Self-correcting Organisation: examples from nuclear power plants , 1998 .

[111]  Karl E. Weick,et al.  Organization design: Organizations as self-designing systems , 1977 .

[112]  K. Haskell,et al.  SLATEC Common Mathematical Subprogram Library: SNLA implementation , 1980 .

[113]  Ioannis A. Papazoglou,et al.  An auditing methodology for safety management of the Greek process industry , 1998 .

[114]  Ed M. Dougherty,et al.  Human errors of commission revisited: an evaluation of the ATHEANA approach , 1998 .

[115]  J. Bommer,et al.  PREDICTION OF HORIZONTAL RESPONSE SPECTRA IN EUROPE , 1996 .

[116]  Alan D. Swain,et al.  An approach to the diagnosis and misdiagnosis of abnormal conditions in post-accident sequences in complex man-machine systems , 1988 .

[117]  and G I Rochlin,et al.  Nuclear Power Operations: A Cross-Cultural Perspective , 1994 .

[118]  S. N. Aksan,et al.  Further evaluation of the CSNI separate effect test activity , 1995 .

[119]  Ali Mosleh,et al.  A procedure for the analysis of errors of commission in a Probabilistic Safety Assessment of a nuclear power plant at full power , 1995 .

[120]  J Rodriguez,et al.  ON-SITE CORROSION MEASUREMENTS IN CONCRETE STRUCTURES , 1995 .

[121]  Cruz Alonso,et al.  Comparison of rates of general corrosion and maximum pitting penetration on concrete embedded steel reinforcement , 1995 .

[122]  L. Burgazzi,et al.  Passive System Reliability Analysis: a Study on Decay Heat Removal Passive Systems , 2000 .

[123]  J. S. Moore,et al.  NUCLEAR SAFETY CRITERIA FOR THE DESIGN OF STATIONARY PRESSURIZED-WATER REACTOR PLANTS. , 1970 .

[124]  F. Sabetta,et al.  Estimation of response spectra and simulation of nonstationary earthquake ground motions , 1996, Bulletin of the Seismological Society of America.

[125]  H. Eichhorn,et al.  Accident analysis of nuclear power plants , 1973 .

[126]  Gary Herrin,et al.  A guide to practical human reliability assessment , 1996 .

[127]  Charles Perrow,et al.  The bureaucratic paradox: The efficient organization centralizes in order to decentralize , 1977 .

[128]  V. N. Dang,et al.  International Survey of PSA-Identified Critical Operator Actions , 1996 .