Digital Situation Picture in Construction – Case of Prefabricated Structural Elements

Efficient construction supply chain management necessitates that all parties possess an adequate situation picture (SP) of construction projects. Currently, an SP of project operations is formed by combining information from phone calls, emails and site visits. As a result, the scope, quality and accessibility of the information is weak and does not support supply chain management. Although several studies have been conducted on technologies supporting data capture, data exchange and analysis, a digital SP is still missing in the construction sector. This study aims to advance understanding of how to create a digital SP of construction operations. A digital SP in construction refers to an up-to-date context-specific machine-to-machine readable information, which can be used by different project parties to manage construction operations. The empirical study is conducted in the context of developing supply chain management of prefabricated structural elements by way of interviews and participatory workshops. The findings indicate that specific data, such as – the identification number of the prefabricated structural element, installation blocks, installation order and its schedule, transport loads and their orders and element statuses – should be shared in a digital format. The study describes inter-company data flows that are needed to create a digital SP employing seven use cases. These findings contribute to the SP literature in construction by mapping opportunities of a digital SP of construction for supporting efficient construction supply chain management.

[1]  Amr A. Oloufa,et al.  Situational awareness of construction equipment using GPS, wireless and web technologies , 2003 .

[2]  Carlos Torres Formoso,et al.  Planning and controlling design in engineered-to-order prefabricated building systems , 2018 .

[3]  Ruwini Edirisinghe,et al.  Digital skin of the construction site , 2018, Engineering, Construction and Architectural Management.

[4]  Ricardo Jardim-Gonçalves,et al.  IoT based situational awareness framework for real-time project management , 2017, Int. J. Comput. Integr. Manuf..

[5]  Jere Backman,et al.  Three methods for exchanging status information of building elements , 2015 .

[6]  Burcin Becerik-Gerber,et al.  Life-Cycle Approach for Implementing RFID Technology in Construction: Learning from Academic and Industry Use Cases , 2011 .

[7]  Carlos Torres Formoso,et al.  Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM , 2020 .

[8]  Frédéric Bosché,et al.  Automated progress tracking using 4D schedule and 3D sensing technologies , 2012 .

[9]  Marcelo Azambuja,et al.  Cloud-based Materials Tracking System Prototype Integrated with Radio Frequency Identification Tagging Technology , 2016 .

[10]  Olli Seppänen,et al.  Real-time resource tracking for analyzing value-adding time in construction , 2019, Automation in Construction.

[11]  Andrew Whyte,et al.  Life-cycle Asset Management in Residential Developments Building on Transport System Critical Attributes via a Data-mining Algorithm , 2018, Buildings.

[12]  Matthew B. Miles,et al.  Qualitative Data Analysis: An Expanded Sourcebook , 1994 .

[13]  Ke Chen,et al.  Bridging BIM and building: From a literature review to an integrated conceptual framework , 2015 .

[14]  Olli Seppänen,et al.  Situation Picture Through Construction Information Management , 2019 .

[15]  Frédéric Bosché,et al.  Toward Automated Earned Value Tracking Using 3D Imaging Tools , 2013 .

[16]  Thomas A. Schwandt Constructivist, interpretivist approaches to human inquiry. , 1994 .

[17]  Anita Moum,et al.  What did you learn from practice today? Exploring experiences from a Danish R&D effort in digital construction , 2009, Adv. Eng. Informatics.

[18]  Rafaela Bortolini,et al.  Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling , 2019, Automation in Construction.

[19]  Javier Irizarry,et al.  Integrating BIM and GIS to improve the visual monitoring of construction supply chain management , 2013 .

[20]  P. Biernacki,et al.  Snowball Sampling: Problems and Techniques of Chain Referral Sampling , 1981 .

[21]  Jouni Ikonen,et al.  Use of embedded RFID tags in concrete element supply chains , 2013, J. Inf. Technol. Constr..

[22]  Chris Harty,et al.  Actors and objects: a socio‐technical networks approach to technology uptake in the construction sector , 2010 .

[23]  Ray Y. Zhong,et al.  Prefabricated construction enabled by the Internet-of-Things , 2017 .

[24]  Burcu Akinci Situational Awareness in Construction and Facility Management , 2014 .

[25]  Stephen Emmitt,et al.  Social BIM: Co-creation with shared situational awareness , 2015, J. Inf. Technol. Constr..

[26]  Burcu Akinci,et al.  Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS , 2007 .

[27]  Dominik T. Matt,et al.  BIM-based and AR Application Combined with Location-Based Management System for the Improvement of the Construction Performance , 2019, Buildings.

[28]  S. Merriam Merriam, Sharan B., ed., Qualitative Research in Practice: Examples for Discussion and Analysis. San Francisco: Jossey-Bass, 2002. , 2002 .

[29]  Farzad Khosrowshahi,et al.  Roadmap for implementation of BIM in the UK construction industry , 2012 .

[30]  Hans Voordijk,et al.  Engaged scholarship in construction management research: the adoption of information and communications technology in construction projects , 2016 .

[31]  Burcu Akinci,et al.  Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains , 2008 .

[32]  Donald A. Schön,et al.  Participatory Action Research and Action Science Compared , 1989 .

[33]  Tao Cheng,et al.  Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications , 2013 .

[34]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[35]  Paul M. Goodrum,et al.  Assessing the impact of materials tracking technologies on construction craft productivity , 2009 .