An Agent-Based Approach for Scheduling Multiple Machines
暂无分享,去创建一个
Frederick Y. Wu | Rama Akkiraju | Sesh Murthy | Pinar Keskinocak | S. Murthy | R. Akkiraju | P. Keskinocak | Frederick Y. Wu
[1] Joseph Y.-T. Leung,et al. Minimizing Total Tardiness on One Machine is NP-Hard , 1990, Math. Oper. Res..
[2] Michael Pinedo,et al. A heuristic to minimize the total weighted tardiness with sequence-dependent setups , 1997 .
[3] Yih-Long Chang,et al. Heuristics for minimizing mean tardiness form parallel machines , 1991 .
[4] Philippe Baptiste,et al. Incorporating Efficient Operations Research Algorithms in Constraint-Based Scheduling , 1995 .
[5] Norman Sadeh,et al. A Multi-Agent Framework for Modeling Supply Chain Dynamics , 1996 .
[6] Monte Zweben,et al. Scheduling and rescheduling with iterative repair , 1993, IEEE Trans. Syst. Man Cybern..
[7] Stephen F. Smith,et al. An Integrated Framework for Generating and Revising Factory Schedules , 1990 .
[8] M. Shaw,et al. MADISON STREAMLINES BUSINESS PROCESSES WITH INTEGRATED INFORMATION SYSTEM , 1998 .
[9] Santhosh Kumaran,et al. Scheduling Solutions for the Paper Industry , 2002, Oper. Res..
[10] Victor R. Lesser,et al. The Hearsay-II Speech-Understanding System: Integrating Knowledge to Resolve Uncertainty , 1980, CSUR.
[11] Christos Koulamas,et al. A heuristic for the single machine tardiness problem , 1993 .
[12] Alok Aggarwal,et al. Cooperative Multiobjective Decision Support for the Paper Industry , 1999, Interfaces.
[13] Martin W. P. Savelsbergh,et al. Heuristic Optimization: A hybrid AI/OR approach , 1997 .
[14] Chris N. Potts,et al. An Iterated Dynasearch Algorithm for the Single-Machine Total Weighted Tardiness Scheduling Problem , 2002, INFORMS J. Comput..
[15] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[16] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[17] Randolph M. Russell,et al. Evaluation of leading heuristics for the single machine tardiness problem , 1997 .
[18] J. J. Brennan,et al. An Improved Algorithm for Scheduling Jobs on Identical Machines , 1977 .
[19] Michael Pinedo,et al. Scheduling jobs on parallel machines with sequence-dependent setup times , 1997, Eur. J. Oper. Res..
[20] Katia Sycara,et al. Multiagent coordination in tightly coupled task scheduling , 1997 .
[21] Christos Koulamas,et al. The Total Tardiness Problem: Review and Extensions , 1994, Oper. Res..
[22] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[23] Esther M. Arkin,et al. Weighted-Tardiness Scheduling on Parallel Machines with Proportional Weights , 1991, Oper. Res..
[24] Chris N. Potts,et al. A survey of algorithms for the single machine total weighted tardiness scheduling problem , 1990, Discret. Appl. Math..
[25] Seshashayee Sankarshana Murthy. Synergy in cooperating agents: designing manipulators from task specifications , 1992 .
[26] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[27] Christopher J. Biermann,et al. Essentials of Pulping and Papermaking , 1993 .