Co-analysing situations and production control rules in a large-scale manufacturing environment

[1]  Fu-Kwun Wang,et al.  Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab , 2001 .

[2]  Stéphane Dauzère-Pérès,et al.  Simulation results and formalism for global-local scheduling in semiconductor manufacturing facilities , 2007, 2007 Winter Simulation Conference.

[3]  Gergely Popovics,et al.  Self-building simulation tool for daily decision support in production control , 2009 .

[4]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[5]  Oliver Rose Improved simple simulation models for semiconductor wafer factories , 2007, 2007 Winter Simulation Conference.

[6]  Hark Hwang,et al.  Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility , 2003 .

[7]  Jerry Banks,et al.  Handbook of simulation - principles, methodology, advances, applications, and practice , 1998, A Wiley-Interscience publication.

[8]  George Chryssolouris,et al.  A simulation-based hybrid backwards scheduling framework for manufacturing systems , 2006, Int. J. Comput. Integr. Manuf..

[9]  Chin Soon Chong,et al.  A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing , 2001, Comput. Ind..

[10]  Sugato Bagchi,et al.  A full-factory simulator as a daily decision-support tool for 300MM wafer fabrication productivity , 2008, 2008 Winter Simulation Conference.

[11]  Abhijit Deshmukh,et al.  A hybrid approach to manufacturing enterprise simulation , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..