Productivity of parallel production lines with unreliable Machines and material handling

Using parallelism in bufferless production lines can improve productivity, with significant productivity gains achieved with crossover. However, including crossover in the line implies additional material-handling requirements that may reduce the availability of the system. This paper examines if parallel systems with crossover between the stages are more productive than parallel systems without crossover between the stages, when one considers the availability of the additional material handling required for the crossover. The minimum material-handling availability necessary for inclusion of crossover is determined for a given parallel line's configuration such that productivity can be maximized.Note to Practitioners-Two approaches in configuring parallel manufacturing lines are currently being used in industrial plants. These have been characterized as the Japanese approach of parallel independent cells of serial operations, and the European approach of a serial line with each operation being duplicated in parallel. The European approach has a productivity advantage over the Japanese approach when considering machine failures within each operation. However, the European approach requires more material handling which increases the configuration complexity and can reduce productivity. A math model is developed to determine which approach is best for a given line design when line length is defined by process planning and line balancing, and line width is determined by throughput requirements. The analysis is limited to cell configurations that do not use buffers internal to the cell.

[1]  Andrea Matta,et al.  Analysis of loop networks by decomposition , 2001 .

[2]  David Andrew Jacobs,et al.  Improvability in production systems: Theory and case studies. , 1993 .

[3]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[4]  Mehmet Savsar Reliability analysis of a flexible manufacturing cell , 2000, Reliab. Eng. Syst. Saf..

[5]  Kripa Shanker,et al.  DETERMINATION OF OPTIMAL AGV FLEET SIZE FOR AN FMS , 1998 .

[6]  Semyon M. Meerkov,et al.  c-bottlenecks in serial production lines: identification and application , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).

[7]  Mehmet Savsar Effects of scheduling policies on the performance of transfer lines with duplicate stations , 1998 .

[8]  Dong-Jo Park,et al.  Performance analysis and optimization of cyclic production lines , 2002 .

[9]  Semyon M. Meerkov,et al.  On asymptotically reliable closed serial production lines , 1993 .

[10]  Stanley B. Gershwin,et al.  Manufacturing Systems Engineering , 1993 .

[11]  B. M. Beamon,et al.  Performance, reliability, and performability of material handling systems , 1998 .

[12]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..

[13]  Manjunath Kamath,et al.  Chapter 5 Performance evaluation of production networks , 1993, Logistics of Production and Inventory.

[14]  Margaret L. Brandeau,et al.  Stochastic Modeling for Automated Material Handling System Design and Control , 1996, Transp. Sci..

[15]  H. T. Papadopoulos,et al.  Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines , 1996 .

[16]  Yves Dallery,et al.  Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers , 1996 .

[17]  Yoram Koren,et al.  Impact of Manufacturing System Configuration on Performance , 1998 .

[18]  S. Jack Hu,et al.  Productivity of Parallel-Serial Manufacturing Lines With and Without Crossover , 2002 .

[19]  Raif O. Onvural,et al.  Survey of closed queueing networks with blocking , 1990, CSUR.

[20]  K. Maag,et al.  New UV curing systems for automotive applications , 2000 .

[21]  Yadati Narahari,et al.  Performance modeling of automated manufacturing systems , 1992 .

[22]  Margaret L. Brandeau,et al.  An Analytic Model for Design of a Multivehicle Automated Guided Vehicle System , 1993 .

[23]  Semyon M. Meerkov,et al.  c-Bottlenecks in serial production lines: Identification andapplication , 2001 .

[24]  Detlev Glüer,et al.  MaxFlow theory for availability calculation of automated material handling systems , 2003 .

[25]  Yoram Koren,et al.  Designing productive manufacturing systems without buffers , 2003 .