EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment

The article scrutinises the learning effect of the unit production time on optimal lot size for the uncertain and imprecise imperfect production process, wherein shortages are permissible and partially backlogged. Contextually, we contemplate the fuzzy chance of production process shifting from an ‘in-control’ state to an ‘out-of-control’ state and re-work facility of imperfect quality of produced items. The elapsed time until the process shifts is considered as a fuzzy random variable, and consequently, fuzzy random total cost per unit time is derived. Fuzzy expectation and signed distance method are used to transform the fuzzy random cost function into an equivalent crisp function. The results are illustrated with the help of numerical example. Finally, sensitivity analysis of the optimal solution with respect to major parameters is carried out.

[1]  C. H. Kim,et al.  An optimal production run length in deteriorating production processes , 1999 .

[2]  DaeSoo Kim,et al.  Optimal two-stage lot sizing and inventory batching policies , 1999 .

[3]  Shib Sankar Sana,et al.  An economic production lot size model in an imperfect production system , 2010, Eur. J. Oper. Res..

[4]  K. S. Chaudhuri,et al.  Production lot sizing with process deterioration and machine breakdown , 2008, Eur. J. Oper. Res..

[5]  Maurice Bonney,et al.  The effect of learning and forgetting on the economic manufactured quantity (EMQ) with the consideration of intracycle backorders , 1997 .

[6]  Gede Agus Widyadana,et al.  An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown , 2012, Int. J. Syst. Sci..

[7]  Shey-Huei Sheu,et al.  Production , Manufacturing and Logistics Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance , 2008 .

[8]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[9]  Jing-Shing Yao,et al.  Ranking fuzzy numbers based on decomposition principle and signed distance , 2000, Fuzzy Sets Syst..

[10]  Mohamad Y. Jaber,et al.  Optimal lot sizing under learning considerations: Shortages allowed and backordered , 1995 .

[11]  Mohamad Y. Jaber,et al.  Learning curves for imperfect production processes with reworks and process restoration interruptions , 2008, Eur. J. Oper. Res..

[12]  K. S. Chaudhuri,et al.  Fuzzy EPQ models for an imperfect production system , 2009, Int. J. Syst. Sci..

[13]  Kuo-Lung Hou,et al.  An optimal production run time with imperfect production processes and allowable shortages , 2003, Comput. Oper. Res..

[14]  Gwo-Liang Liao,et al.  Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance , 2013, Int. J. Syst. Sci..

[15]  Wansheng Tang,et al.  Optimal production run length in deteriorating production processes with fuzzy elapsed time , 2009, Comput. Ind. Eng..

[16]  Wansheng Tang,et al.  Optimal run lengths in deteriorating production processes in random fuzzy environments , 2009, Comput. Ind. Eng..

[17]  Mohamad Y. Jaber,et al.  Mathematical modelling of the effect of human learning in the finite production inventory model , 1993 .

[18]  Maurice Bonney,et al.  Optimal lot sizing under learning considerations: The bounded learning case , 1996 .

[19]  Hui Zheng,et al.  Optimal production run length with imperfect production processes and backorder in fuzzy random environment , 2010, Comput. Ind. Eng..

[20]  Deng-Maw Tsai,et al.  Optimal ordering and production policy for a recoverable item inventory system with learning effect , 2012, Int. J. Syst. Sci..

[21]  Tadashi Dohi,et al.  Inspection scheduling for imperfect production processes under free repair warranty contract , 2007, Eur. J. Oper. Res..

[22]  K. S. Chaudhuri,et al.  An EMQ model in an imperfect production process , 2010, Int. J. Syst. Sci..

[23]  N. Stone Factors Affecting the Cost of Airplanes and Use of Proprotein Convertase Subtilisin/Kexin Type 9 Inhibitors , 2017, JAMA cardiology.

[24]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[25]  Chih-Chung Lo,et al.  Optimal lot size with learning consideration on an imperfect production system with allowable shortages , 2008 .

[26]  Huibert Kwakernaak,et al.  Fuzzy random variables - I. definitions and theorems , 1978, Inf. Sci..

[27]  Mohamad Y. Jaber,et al.  Production , Manufacturing and Logistics Learning curves for processes generating defects requiring reworks , 2004 .