Customer demand satisfaction in production systems: a due-time performance approach

The problem of customer demand satisfaction in production systems with unreliable machines and finite finished goods buffers (FGB) is addressed. The measure of customer demand satisfaction is characterized by the probability to ship to the customer a required number of parts during a fixed time interval. This measure, referred to as the due-time performance (DTP), is often used to characterize the quality of a supplier in the automotive industry supply chain. In the paper, a method for evaluating DTP in serial and assembly lines is developed and the problem of selecting capacity of the FGB is discussed. The results obtained are illustrated by a case study at an automotive component plant.

[1]  Barış Tan,et al.  Effects of variability on the due-time performance of a continuous materials flow production system in series , 1998 .

[2]  Baris Tan Variance of the output as a function of time: Production line dynamics , 1999, Eur. J. Oper. Res..

[3]  Jong-Tae Lim,et al.  Improvability of assembly systems I: Problem formulation and performance evaluation , 2000 .

[4]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..

[5]  Max-Olivier Hongler,et al.  Fluctuations of the production output of transfer lines , 2000, J. Intell. Manuf..

[6]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[7]  Baris Tan,et al.  Asymptotic variance rate of the output in production lines with finite buffers , 2000, Ann. Oper. Res..

[8]  E. Muth The Reversibility Property of Production Lines , 1979 .

[9]  W. Hopp,et al.  CONWIP ASSEMBLY WITH DETERMINISTIC PROCESSING AND RANDOM OUTAGES , 1992 .

[10]  Semyon M. Meerkov,et al.  A system-theoretic property of serial production lines: improvability , 1995 .

[11]  Semyon M. Meerkov,et al.  A system-theoretic property of serial production lines: improvability , 1993, Proceedings of 32nd IEEE Conference on Decision and Control.

[12]  G. J. Miltenburg,et al.  Variance of the number of units produced on a transfer line with buffer inventories during a period of lengthT , 1987 .

[13]  Semyon M. Meerkov,et al.  Improvability theory for assembly systems: Two component—one assembly machine case , 1996 .

[14]  Jingshan Li,et al.  Production variability in manufacturing systems: problem formulation and performance bounds , 1998, Proceedings of the 37th IEEE Conference on Decision and Control (Cat. No.98CH36171).

[15]  Semyon M. Meerkov,et al.  Production variability in manufacturing systems: Bernoulli reliability case , 2000, Ann. Oper. Res..

[16]  Jingshan Li,et al.  Production variability in manufacturing systems: A systems approach. , 2000 .

[17]  D. S. Kim,et al.  Estimating the distribution and variance of time to produce a fixed lot size given deterministic processing times and random downtimes , 1997 .

[18]  Maria Carrascosa,et al.  Variance of the Output in a Deterministic Two-Machine Line , 1995 .

[19]  Semyon M. Meerkov,et al.  System-theoretic analysis of due-time performance in production systems , 1995 .

[20]  Stanley B. Gershwin,et al.  Manufacturing Systems Engineering , 1993 .

[21]  Tayfur Altiok,et al.  Performance analysis of manufacturing systems , 1996 .

[22]  S. Fotopoulos Stochastic modeling and analysis of manufacturing systems , 1996 .

[23]  Kevin B. Hendricks,et al.  The Output Processes of Serial Production Lines of Exponential Machines with Finite Buffers , 1992, Oper. Res..

[24]  Yadati Narahari,et al.  Performance modeling of automated manufacturing systems , 1992 .

[25]  J.-T. Lim,et al.  Improvability of assembly systems. I. Problem formulation and performance evaluation , 1998, Proceedings of the 37th IEEE Conference on Decision and Control (Cat. No.98CH36171).

[26]  Max-Olivier Hongler,et al.  On the variance of the production output of transfer lines , 1999, IEEE Trans. Robotics Autom..