On the implementation of the Shewhart sign control chart for low-volume production

Today, many companies use job production to produce small batches of work output according to customised specifications required by customers. With job production, the quantity of parts to be produced is finite and can be limited to a few thousands or hundreds (low-volume production). Usually, job production requires high-quality standards. When 100% sampling is not possible, online monitoring is a viable solution to immediately start process quality control. However, knowledge about the process distribution is frequently unavailable. Recently, it has been shown that the distribution-free Shewhart sign control chart is an efficient means to monitor processes performing high-volume production within a finite production horizon. In this paper, we reconsider the definition of the Shewhart sign chart statistic when the population size is small and we propose an approach that extends its implementation to finite batch sizes of work to be produced. Tables presenting the statistical properties of the Shewhart sign control chart for low-volume production are shown and commented. An illustrative example is discussed on a simulated data-set.

[1]  Giovanni Celano,et al.  The variable sample size t control chart for monitoring short production runs , 2012 .

[2]  Yan Li,et al.  On the Performance of Two‐sided Control Charts for Short Production Runs , 2012, Qual. Reliab. Eng. Int..

[3]  Tirupathi R. Chandrupatla Quality and reliability in engineering , 1997 .

[4]  M. A. Graham,et al.  A Nonparametric EWMA Sign Chart for Location Based on Individual Measurements , 2011 .

[5]  Shihong Zhang,et al.  A t‐chart for Monitoring Multi‐variety and Small Batch Production Run , 2014, Qual. Reliab. Eng. Int..

[6]  Steven Cox,et al.  Simulation of high precision process control for set-up dominant processes. , 2013 .

[7]  Maurice Pillet A Specific SPC Chart For Small-Batch Control , 1996 .

[8]  Giovanni Celano,et al.  The economic performance of the Shewhart t chart , 2012, Qual. Reliab. Eng. Int..

[9]  Michael B. C. Khoo,et al.  The run sum t control chart for monitoring process mean changes in manufacturing , 2014 .

[10]  Shaul P. Ladany,et al.  Selection of the optimal setup policy , 1976 .

[11]  George Nenes,et al.  The economically designed CUSUM chart for monitoring short production runs , 2006 .

[12]  Douglas C. Montgomery,et al.  A general model for the optimal economic design of X¯ charts used to control short or long run processes , 1996 .

[13]  George Tagaras,et al.  Dynamic control charts for finite production runs , 1996 .

[14]  Stephen V. Crowder,et al.  An SPC model for short production runs: minimizing expected cost , 1992 .

[15]  Giovanni Celano,et al.  Shewhart and EWMA t control charts for short production runs , 2011, Qual. Reliab. Eng. Int..

[16]  Stefan H. Steiner PRE-CONTROL AND SOME SIMPLE ALTERNATIVES , 1997 .

[17]  M. R. Reynolds,et al.  Nonparametric quality control charts based on the sign statistic , 1995 .

[18]  Douglas C. Montgomery,et al.  Statistical quality control : a modern introduction , 2009 .

[19]  Shaul P. Ladany,et al.  Optimal Use of Control Charts for Controlling Current Production , 1973 .

[20]  George Tagaras,et al.  Comparing the Effectiveness of Various Bayesian X Control Charts , 2002, Oper. Res..

[21]  Kai Gu,et al.  A Study on t Chart for Short-Run and Mixed Model Productions , 2011 .

[22]  Herschel Weil,et al.  The Distribution of Radial Error , 1954 .

[23]  S. Chakraborti Nonparametric (Distribution-Free) Quality Control Charts† , 2011 .

[24]  Giovanni Celano,et al.  Performance of t control charts in short runs with unknown shift sizes , 2013, Comput. Ind. Eng..

[25]  Giovanni Celano,et al.  The performance of the Shewhart sign control chart for finite horizon processes , 2015 .