Incremental temporal reasoning in job shop scheduling repair
暂无分享,去创建一个
Brian C. Williams | L. Zheng | H. Yang | Y. Huang | L. Tang | B. Williams | L. Tang | Y. Huang | L. Zheng | H. Yang
[1] Mark Abramson,et al. Executing Reactive, Model-based Programs through Graph-based Temporal Planning , 2001, IJCAI.
[2] Rina Dechter,et al. Temporal Constraint Networks , 1989, Artif. Intell..
[3] P. Brunn,et al. Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment , 1999 .
[4] Stephen F. Smith,et al. Applying constraint satisfaction techniques to job shop scheduling , 1997, Ann. Oper. Res..
[5] William J. Cook,et al. A Computational Study of the Job-Shop Scheduling Problem , 1991, INFORMS Journal on Computing.
[6] Jürgen Dorn,et al. Case-based reactive scheduling , 1995 .
[7] Rina Dechter,et al. Constraint Processing , 1995, Lecture Notes in Computer Science.
[8] Jürgen Kletti,et al. Manufacturing Execution Systems (MES) , 2007 .
[9] Stephen F. Smith,et al. Reactive Scheduling Systems , 1995 .
[10] Robert T. Effinger,et al. Enabling Fast Flexible Planning through Incremental Temporal Reasoning with Conflict Extraction , 2005, ICAPS.
[11] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[12] Brian C. Williams,et al. Model-based programming of intelligent embedded systems and robotic space explorers , 2003, Proc. IEEE.
[13] Oliver Günther,et al. RFID in manufacturing , 2008 .
[14] Kazuo Miyashita,et al. Case-based knowledge acquisition for schedule optimization , 1995, Artif. Intell. Eng..
[15] G. Fozzard,et al. Constraint-Based Reactive Rescheduling in a Stochastic Environment , 1997, ECP.
[16] Velusamy Subramaniam,et al. Reactive Recovery of Job Shop Schedules – A Review , 2002 .
[17] Reha Uzsoy,et al. Predictable scheduling of a single machine with breakdowns and sensitive jobs , 1999 .
[18] Brian C. Williams,et al. Conflict-directed A* and its role in model-based embedded systems , 2007, Discret. Appl. Math..
[19] Robert H. Storer,et al. Robustness Measures and Robust Scheduling for Job Shops , 1994 .
[20] J. Efstathiou. Anytime heuristic schedule repair in manufacturing industry , 1996 .
[21] Dirk Braeken,et al. Manufacturing execution system (MES) , 2005 .
[22] Janet Efstathiou. Formalising the Repair of Schedules Through Knowledge Acquisition , 1996, EKAW.