DECOMPOSITION APPROACH FOR GENERATION AND TRANSMISSION EXPANSION PLANNING WITH IMPLICIT MULTIPLIERS EVALUATION

In an electric power systems planning framework, decomposition techniques are usually applied to separate investment and operation subproblems to take benefits from the use of independent solution algorithms. Real power systems planning problems can be rather complex and their detailed representation often leads to greater effort to solve the operation subproblems. Traditionally, the algorithms used in the solution of transmission constrained operation problems take great computational advantage with compact representation of the model, which means the elimination of some variables and constraints that don't affect the problem's optimal solution. This work presents a new methodology for solving generation and transmission expansion planning problems based on Benders decomposition where the incorporation of the traditional operation models require an additional procedure for evaluating the Lagrange's multipliers associated to the constraints which are not explicitly represented yet are used in the construction of the Benders cuts during the iterative process. The objective of this work is to seek for efficiency and consistency in the solution of expansion planning problems by allowing specialized algorithms to be applied in the operation model. It is shown that this methodology is particularly interesting when applied to stochastic hydrothermal problems which usually require a large number of problems to be solved. The results of this methodology are illustrated by a Colombian system case study.

[1]  G. Latorre,et al.  Classification of publications and models on transmission expansion planning , 2003 .

[2]  M. V. F. Pereira,et al.  Multi-stage stochastic optimization applied to energy planning , 1991, Math. Program..

[3]  J. F. Benders Partitioning procedures for solving mixed-variables programming problems , 1962 .

[4]  B. Stott,et al.  Review of load-flow calculation methods , 1974 .

[5]  Andres Ramos,et al.  MULTI-AREA REGIONAL INTERCONNECTION PLANNING UNDER UNCERTAINTY , 1999 .

[6]  B. Gorenstin,et al.  Power system expansion planning under uncertainty , 1993 .

[7]  M. V. F. Pereira,et al.  A New Benders Decomposition Approach to Solve Power Transmission Network Design Problems , 2001, IEEE Power Engineering Review.

[8]  O. Alsac,et al.  Fast Decoupled Load Flow , 1974 .

[9]  B Stott,et al.  Linear Programming for Power-System Network Security Applications , 1979, IEEE Transactions on Power Apparatus and Systems.

[10]  Jeremy A. Bloom,et al.  Solving an Electricity Generating Capacity Expansion Planning Problem by Generalized Benders' Decomposition , 1983, Oper. Res..

[11]  Adiel Teixeira de Almeida,et al.  Aplicabilidade da programação matemática multiobjetivo no planejamento da expansão de longo prazo da geração no Brasil , 2009 .

[12]  Laura Bahiense,et al.  Modelo disjuntivo de expanso tima de redes de transmisso em sistemas hidrotrmicos , 2003 .

[13]  Antônio Nélson Rodrigues da Silva,et al.  Análise de decisão multicritério na localização de usinas termoelétricas utilizando SIG , 2005 .

[14]  M. Shahidehpour,et al.  Market-Based Coordination of Transmission and Generation Capacity Planning , 2007, IEEE Transactions on Power Systems.

[15]  Marija D. Ilic,et al.  A global planning methodology for uncertain environments: application to the Lebanese power system , 1995 .

[16]  S. Salon,et al.  Transmission Network Planning Using Linear Programming , 1985, IEEE Transactions on Power Apparatus and Systems.

[17]  M. Shahidehpour,et al.  Network planning in unbundled power systems , 2006, IEEE Transactions on Power Systems.