The Behavior Of Forecast Errors From A Nearly Integrated Ar(1) Model As Both Sample Size And Forecast Horizon Become Large
暂无分享,去创建一个
[1] Michael P. Clements,et al. Forecasting in Cointegrated Systems , 1995 .
[2] Nikolay Gospodinov. Median Unbiased Forecasts for Highly Persistent Autoregressive Processes , 2002 .
[3] P. Phillips,et al. Multiple Time Series Regression with Integrated Processes , 1986 .
[4] Jan R. Magnus,et al. The exact multi-period mean-square forecast error for the first-order autoregressive model , 1988 .
[5] Peter C. B. Phillips,et al. Towards a Unified Asymptotic Theory for Autoregression , 1987 .
[6] The sampling distributions of the predictor for an autoregressive model under misspecifications , 1984 .
[7] Michael P. Clements,et al. On the limitations of comparing mean square forecast errors , 1993 .
[8] Robert F. Engle,et al. Forecasting and testing in co-integrated systems , 1987 .
[9] Kenneth Frank Wallis,et al. Models of the Uk Economy: A Review by the Esrc Macroeconomic Modelling Bureau , 1985 .
[10] Michael Sampson,et al. The Effect of Parameter Uncertainty on Forecast Variances and Confidence Intervals for Unit Root and Trend Stationary Time-Series Models , 1991 .
[11] W. Fuller,et al. Properties of Predictors for Autoregressive Time Series , 1981 .
[12] Peter C. B. Phillips,et al. Estimating Long Run Economic Equilibria , 1991 .
[13] Peter C. B. Phillips,et al. Impulse response and forecast error variance asymptotics in nonstationary VARs , 1998 .