Characteristic of a Proactive Assembly System

Competitive assembly systems must cope with frequent demand changes, requiring drastically shortened resetting and ramp-up times. Characteristics of assembly systems capable of rapid change are e.g. Flexibility; Robustness, Agility, and ability to handle frequent changes and disturbances. This paper proposes proactivity as a vital factor of semi-automated assembly systems to increase speed of change. Proactive systems utilize the full potential of human operators and technical systems. Such systems have ability to dynamically change system automation levels, resulting in decrease of time consumed for assembly tasks. Proactivity criteria for assembly systems are reviewed based on theory and industrial case studies

[1]  Alberto De Toni,et al.  Definitions and linkages between operational and strategic flexibilities , 2005 .

[2]  Alphonse Chapanis,et al.  Human factors in systems engineering , 1996 .

[3]  Johan Stahre,et al.  Analysing changeability and time parameters due to levels of Automation in an assembly system , 2008 .

[4]  Johan Stahre,et al.  Proactive assembly systems-realising the potential of human collaboration with automation , 2009, Annu. Rev. Control..

[5]  Elizabeth Walter,et al.  Cambridge advanced learner's dictionary , 2005 .

[6]  Johan Stahre,et al.  RELATIONS BETWEEN PARAMETERS/PERFORMERS AND LEVELS OF AUTOMATION , 2007 .

[7]  Johan Stahre,et al.  Measuring and analysing Levels of Automation in an assembly system , 2008 .

[8]  Andrew Kusiak,et al.  Handbook of life cycle engineering : concepts, models, and technologies , 1998 .

[9]  A. Tharumarajah,et al.  Comparison of the bionic, fractal and holonic manufacturing system concepts , 1996 .

[10]  David Upton,et al.  What Really Makes Factories Flexible , 1995 .

[11]  M. Bjelkemyr,et al.  An Engineering Systems Perspective on System of Systems Methodology , 2007, 2007 1st Annual IEEE Systems Conference.

[12]  Jörgen Frohm,et al.  Levels of Automation in Production Systems , 2008 .

[13]  A. G. U Lso,et al.  Reconfigurable manufacturing systems: Key to future manufacturing , 2000 .

[14]  P. Drucker Management Challenges for the 21st Century , 1992 .

[15]  J. Stahre,et al.  An Approach to Proactive Assembly Systems: -Towards competitive assembly systems , 2007, 2007 IEEE International Symposium on Assembly and Manufacturing.

[16]  S S Stevens,et al.  HUMAN ENGINEERING FOR AN EFFECTIVE AIR-NAVIGATION AND TRAFFIC-CONTROL SYSTEM, AND APPENDIXES 1 THRU 3 , 1951 .

[17]  J. Barata,et al.  Evolvable production systems , 2009, 2009 IEEE International Symposium on Assembly and Manufacturing.

[18]  Monica Bellgran,et al.  A model for parallel levels of automation within manufacturing , 2005 .

[19]  M. Onori,et al.  Evolvable Assembly Systems: Developments and Advances , 2007, 2007 IEEE International Symposium on Assembly and Manufacturing.

[20]  Gudela Grote,et al.  Uncertainty management at the core of system design , 2003, Annu. Rev. Control..

[21]  Johan Stahre,et al.  TOWARDS EFFICIENT AUTOMATION IMPLEMENTATION , 2006 .

[22]  Jens Rasmussen,et al.  Skills, rules, and knowledge; signals, signs, and symbols, and other distinctions in human performance models , 1983, IEEE Transactions on Systems, Man, and Cybernetics.

[23]  Mauro Onori,et al.  Evolvable Production System : a position paper , 2007 .

[24]  Jessica Bruch,et al.  Considering design demands of a proactive assembly system : A position paper , 2007 .

[25]  Johan Stahre Towards Human Supervisory Control in Advanced Manufacturing Systems , 1995 .