Heuristic algorithms to minimize total weighted tardiness with stochastic rework and reprocessing times
暂无分享,去创建一个
Krishnaswami Srihari | Sang Won Yoon | Venkatesh Arasanipalai Raghavan | S. Yoon | K. Srihari | V. Raghavan
[1] Hong Zhou,et al. Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm , 2009, Eur. J. Oper. Res..
[2] Joseph Y.-T. Leung,et al. Minimizing Total Tardiness on One Machine is NP-Hard , 1990, Math. Oper. Res..
[3] Krishna R. Pattipati,et al. A practical approach to job-shop scheduling problems , 1993, IEEE Trans. Robotics Autom..
[4] John W. Fowler,et al. A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops , 2002 .
[5] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[6] Omar Ghrayeb,et al. A particle swarm optimization algorithm for minimizing makespan of nonidentical parallel batch processing machines , 2012 .
[7] Oded Maimon,et al. A genetic algorithm approach to scheduling PCBs on a single machine , 1998 .
[8] Purushothaman Damodaran,et al. Mixed integer formulation to minimize makespan in a flow shop with batch processing machines , 2004, Math. Comput. Model..
[9] Jorge M. S. Valente,et al. Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups , 2008, Comput. Oper. Res..
[10] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..
[11] Danping Lin,et al. Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs , 2011 .
[12] Sarah S. Y. Lam,et al. Minimizing makespan during environmental stress screening using a genetic algorithm and an ant colony optimization , 2007 .
[13] George G. Polak,et al. Job release policy and printed circuit board assembly , 2003 .
[14] Andreas Klinkert,et al. Surgical case scheduling as a generalized job shop scheduling problem , 2008, Eur. J. Oper. Res..
[15] J.W. Fowler,et al. Heuristics for minimizing total weighted tardiness in complex job shops , 2005 .
[16] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[17] Hans-Otto Günther,et al. PCB assembly scheduling for collect-and-place machines using genetic algorithms , 2007 .
[18] Alan S. Manne,et al. On the Job-Shop Scheduling Problem , 1960 .
[19] Purushothaman Damodaran,et al. Heuristics to minimize makespan of parallel batch processing machines , 2008 .
[20] Manop Reodecha,et al. A memetic algorithm-based heuristic for a scheduling problem in printed circuit board assembly , 2009, Comput. Ind. Eng..
[21] Sergey Kovalev,et al. Batching for work and rework processes on dedicated facilities to minimize the makespan , 2010 .
[22] D. Y. Sha,et al. A dispatching rule for photolithography scheduling with an on-line rework strategy , 2006, Comput. Ind. Eng..
[23] S. S. Kim,et al. A dispatching algorithm for parallel machines with rework processes , 2010, J. Oper. Res. Soc..
[24] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[25] Purushothaman Damodaran,et al. Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing , 2009 .
[26] Tsung-Shin Hsu,et al. Enhanced performance of overlap flow-shop scheduling involving reworking and a time buffer , 2008 .
[27] Ping Ji,et al. A scheduling problem for PCB assembly: a case with multiple lines , 2008 .
[28] Hyun Joon Shin,et al. An adaptive scheduling algorithm for a parallel machine problem with rework processes , 2010 .
[29] Zhibin Jiang,et al. Simulation based real-time scheduling method for dispatching and rework control of semiconductor manufacturing system , 2007, 2007 IEEE International Conference on Systems, Man and Cybernetics.