Application of Seepage Stabilization Analysis and Seepage Quantity Calculation in Wharf Dry Construction
暂无分享,去创建一个
Based on the project of large-scale structures pre-fabricating base in Dalian Changxing island,by combining with the characteristics of gravity wharf construction,through seepage stabilization analysis and seepage quantity calculation,the optimized dry construction technologies are used,which could reduce construction procedures,decrease construction cost,shorten construction period and gain more economic benefit.The project design and construction experiences can be used as the reference for the similar projects.