Multiple failures in a multi-item spares inventory model
暂无分享,去创建一个
[1] John W. Mamer,et al. A Lower Bound Heuristic for Selecting Multi-Item Inventories for a General Job Completion Objective , 1988 .
[2] Richard M. Simon. The reliability of multicomponent systems subject to cannibalization , 1972 .
[3] Alan J. Rolfe. Markov chain analysis of a situation where cannibalization is the only repair activity , 1970 .
[4] Margaret K. Schaefer. A Multi-Item Maintenance Center Inventory Model for Low-Demand Reparable Items , 1983 .
[5] Warren M. Hirsch,et al. Cannibalization in multicomponent systems and the theory of reliability , 1968 .
[6] K. R. Baker,et al. The Effect of Commonality on Safety Stock in a Simple Inventory Model , 1986 .
[7] Stephen A. Smith,et al. Job-Fill Inventories for Sequences of Jobs , 1988 .
[8] Craig C. Sherbrooke,et al. Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..
[9] Stephen A. Smith,et al. Note—Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items , 1980 .
[10] J. J. Brennan,et al. The performance of cannibalization policies in a maintenance system with spares, repair, and resource constraints , 1986 .
[11] G. J. Feeney,et al. The S-1, S Inventory Policy Under Compound Poisson Demand , 1966 .
[12] J. Muckstadt. A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .
[13] Craig C. Sherbrooke. An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System , 1971, Oper. Res..
[14] Samuel Karlin,et al. A First Course on Stochastic Processes , 1968 .