Postupgrade performance of the 3.8-m United Kingdom Infrared Telescope (UKIRT)
暂无分享,去创建一个
Ralf-Rainer Rohloff | Nicholas P. Rees | Richard J. Bennett | Timothy G. Hawarden | Eli Ettedgui-Atad | Timothy C. Chuter | Antonio C. Chrysostomou | Charles P. Cavedoni | Eckhart Pitz | Donald G. Pettie
[1] Andreas Glindemann,et al. Upgraded UKIRT , 1998, Astronomical Telescopes and Instrumentation.
[2] Nicholas P. Rees,et al. UKIRT fast guide system improvements , 1997, Optics & Photonics.
[3] Nicholas P. Rees,et al. Progress on the UKIRT Upgrades programme , 1997, Optics & Photonics.
[4] Nicholas P. Rees,et al. Controlling the UKIRT upgrades program , 1995, Defense, Security, and Sensing.
[5] Edward A. Hileman,et al. UKIRT Upgrades Program: design and installation of the Dome Ventilation System (DVS) , 1997, Other Conferences.
[6] Nicholas P. Rees,et al. Active optics at UKIRT , 1998, Astronomical Telescopes and Instrumentation.
[7] Ralf-Rainer Rohloff,et al. Five-axis secondary system for UKIRT , 1994, Astronomical Telescopes and Instrumentation.
[8] Malcolm J. Northcott,et al. Testing optical telescopes from defocused stellar images , 1994, Astronomical Telescopes and Instrumentation.