Evaluating Natural Resource Investments

Notwithstanding impressive advances in the theory of finance over the past 2 decades, practical procedures for capital budgeting have evolved only slowly. The standard technique, which has remained unchanged in essentials since it was originally proposed (see Dean 1951; Bierman and Smidt 1960), derives from a simple adaptation of the Fisher (1907) model of valuation under certainty: under this technique, expected cash flows from an investment project are discounted at a rate deemed appropriate to their risk, and the resulting present value is compared with the cost of the project. This standard textbook technique reflects modern theoretical developments only insofar as estimates of the discount rate may be obtained from crude application of single period asset pricing theory (but see Brennan 1973; Bogue and Roll 1974; Turnbull 1977; Constantinides 1978). The inadequacy of this approach to capital budgeting is widely acknowledged, although not widely discussed. Its obvious deficiency is its The evaluation of mining and other natural resource projects is made particularly difficult by the high degree of uncertainty attaching to output prices. It is shown that the techniques of continuous time arbitrage and stochastic control theory may be used not only to value such projects but also to determine the optimal policies for developing, managing, and abandoning them. The approach may be adapted to a wide variety of contexts outside the natural resource sector where uncertainty about future project revenues is a paramount concern.

[1]  N. Kaldor Speculation and Economic Stability , 1939 .

[2]  Joel Dean,et al.  Capital Budgeting: Top Management Policy on Plant, Equipment, and Product Development , 1951 .

[3]  L. Telser Futures Trading and the Storage of Cotton and Wheat , 1958, Journal of Political Economy.

[4]  H. Bierman,et al.  The Capital Budgeting Decision , 1960 .

[5]  R. C. Merton,et al.  Optimum consumption and portfolio rules in a continuous - time model Journal of Economic Theory 3 , 1971 .

[6]  F. Black,et al.  The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.

[7]  Michael J. Brennan,et al.  AN APPROACH TO THE VALUATION OF UNCERTAIN INCOME STREAMS , 1973 .

[8]  Richard Roll,et al.  CAPITAL BUDGETING OF RISKY PROJECTS WITH “IMPERFECT” MARKETS FOR PHYSICAL CAPITAL , 1974 .

[9]  R. Solow The Economics of Resources or the Resources of Economics , 2008 .

[10]  R. C. Merton,et al.  Optimum Consumption and Portfolio Rules in a Continuous-Time Model* , 1975 .

[11]  M. Brennan The Supply of Storage , 1976 .

[12]  E. Fama Risk-adjusted discount rates and capital budgeting under uncertainty , 1977 .

[13]  S. Turnbull,et al.  CAPITAL BUDGETING AND THE CAPITAL ASSET PRICING MODEL: GOOD NEWS AND BAD NEWS , 1977 .

[14]  P. Boyle Options: A Monte Carlo approach , 1977 .

[15]  S. Myers Determinants of corporate borrowing , 1977 .

[16]  Eduardo S. Schwartz,et al.  Finite Difference Methods and Jump Processes Arising in the Pricing of Contingent Claims: A Synthesis , 1977 .

[17]  S. Ross A Simple Approach to the Valuation of Risky Streams , 1978 .

[18]  G. Constantinides MARKET RISK ADJUSTMENT IN PROJECT VALUATION , 1978 .

[19]  O. Tourinho The Option Value of Reserves of Natural Resources , 1979 .

[20]  M. David HARRISON, J. Michael, and KREPS, . Martingales and Arbitrage in Multiperiod Securities Markets, Journal of Economic Theory, , . , 1979 .

[21]  David M. Kreps,et al.  Martingales and arbitrage in multiperiod securities markets , 1979 .

[22]  S. Ross,et al.  Option pricing: A simplified approach☆ , 1979 .

[23]  B. Heimann,et al.  Fleming, W. H./Rishel, R. W., Deterministic and Stochastic Optimal Control. New York‐Heidelberg‐Berlin. Springer‐Verlag. 1975. XIII, 222 S, DM 60,60 , 1979 .

[24]  Zvi Bodie,et al.  Risk and Return in Commodity Futures , 1980 .

[25]  Joseph T. Williams,et al.  Term-Risk Structures and the Valuation of Projects , 1980, Journal of Financial and Quantitative Analysis.

[26]  R. Pindyck Uncertainty and Exhaustible Resource Markets , 1980, Journal of Political Economy.

[27]  S. Richard,et al.  A continuous time equilibrium model of forward prices and futures prices in a multigood economy , 1981 .

[28]  S. Ross,et al.  The relation between forward prices and futures prices , 1981 .

[29]  George S. Oldfield,et al.  Forward contracts and futures contracts , 1981 .

[30]  Eduardo S. Schwartz,et al.  Regulation and Corporate Investment Policy , 1982 .

[31]  Eduardo S. Schwartz,et al.  Consistent Regulatory Policy under Uncertainty , 1982 .

[32]  Merton H. Miller,et al.  A Test of the Hotelling Valuation Principle , 1985, Journal of Political Economy.