A Petri-Net-based modelling approach to railway bridge asset management
暂无分享,去创建一个
Luís C. Neves | John Andrews | Dovile Rama | Panayioti C. Yianni | David Castlo | J. Andrews | L. Neves | P. Yianni | D. Rama | D. Castlo
[1] William T. Scherer,et al. Markovian Models for Bridge Maintenance Management , 1994 .
[2] Kurt Jensen,et al. A Brief Introduction to Coloured Petri Nets , 1997, TACAS.
[3] Gopinath Chattopadhyay,et al. Life cycle management for railway bridge assets , 2013 .
[4] Yong K. Cho,et al. An integrated system for bridge management using probabilistic and mechanistic deterioration models: Application to bridge decks , 2010 .
[5] George Morcous,et al. Modeling Bridge Deterioration Using Case-Based Reasoning , 2002 .
[6] Anil K. Agrawal,et al. Deterioration Rates of Typical Bridge Elements in New York , 2008 .
[7] Dan M. Frangopol,et al. Probabilistic models for life‐cycle performance of deteriorating structures: review and future directions , 2004 .
[8] George Morcous,et al. Performance Prediction of Bridge Deck Systems Using Markov Chains , 2006 .
[9] Erik H. Vanmarcke,et al. Modeling Bridge Deterioration with Markov Chains , 1992 .
[10] Bryant Le,et al. Petri net modelling of bridge asset management using maintenance-related state conditions , 2016 .
[11] Dietmar P. F. Möller,et al. Systems and Software Engineering , 2016 .
[12] John Andrews,et al. A modelling approach to railway track asset management , 2013 .
[13] Dan M. Frangopol,et al. Condition, safety and cost profiles for deteriorating structures with emphasis on bridges , 2005, Reliab. Eng. Syst. Saf..
[14] Wolfgang Reisig,et al. Understanding Petri Nets Modeling Techniques, Analysis Methods, Case Studies , 2013, Bull. EATCS.
[15] John O Sobanjo,et al. Enhancement of the FDOT's project level and network level bridge management analysis tools , 2011 .
[16] John Andrews,et al. A reliability analysis of railway switches , 2013 .
[17] Yi Jiang,et al. BRIDGE SERVICE LIFE PREDICTION MODEL USING THE MARKOV CHAIN , 1989 .
[18] I-Tung Yang,et al. Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning , 2012 .
[19] Samer Madanat,et al. History-Dependent Bridge Deck Maintenance and Replacement Optimization with Markov Decision Processes , 2007 .
[20] Tieling Zhang,et al. Modified Weibull Approach to Deterioration Modelling: An Application to Bridge Elements , 2014 .
[21] Anna Philippou,et al. Tools and Algorithms for the Construction and Analysis of Systems , 2018, Lecture Notes in Computer Science.
[22] Moshe Sniedovich. Dynamic Programming: Foundations and Principles, Second Edition , 2010 .
[23] Tarek Hegazy,et al. Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs , 2006, Comput. Aided Civ. Infrastructure Eng..
[24] G. Kuczera,et al. Markov Model for Storm Water Pipe Deterioration , 2002 .
[25] W. G. Cochran. Some Methods for Strengthening the Common χ 2 Tests , 1954 .
[26] C. Petri. Kommunikation mit Automaten , 1962 .
[27] Bryant Le,et al. Modelling railway bridge asset management , 2013 .
[28] M. M. Kumaraswamy,et al. Framework Development of Performance Prediction Models for Concrete Bridges , 2009 .
[29] Wolfgang Reisig,et al. Understanding Petri nets , 1995, IEEE Parallel & Distributed Technology: Systems & Applications.