Steady state analysis of a timed event graph with time window constraints
暂无分享,去创建一个
[1] B. Carré. An Algebra for Network Routing Problems , 1971 .
[2] P. Aygalinc,et al. Structural analysis of p-time Petri nets , 1996 .
[3] Tae-Eog Lee,et al. Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .
[4] Tadao Murata,et al. Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.
[5] Chengbin Chu,et al. Cyclic scheduling of a hoist with time window constraints , 1998, IEEE Trans. Robotics Autom..
[6] Tae-Eog Lee. Stable Earliest Starting Schedules for Periodic Job Shops: a Linear System Approach , 1994 .
[7] Tae-Eog Lee,et al. An extended event graph with negative places and tokens for time window constraints , 2005, IEEE Transactions on Automation Science and Engineering.
[8] TAE-EOG LEE,et al. Performance Measures and Schedules in Periodic Job Shops , 1997, Oper. Res..
[9] Tae-Eog Lee,et al. An extended event graph with negative places and negative tokens for time window constraints , 2002, Sixth International Workshop on Discrete Event Systems, 2002. Proceedings..
[10] Lei Lei,et al. Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints , 2001 .
[11] Tae-Eog Lee,et al. Modeling and implementing a real-time scheduler for dual-armed cluster tools , 2001, Comput. Ind..