Multi-constraint information management and visualisation for collaborative planning and control in construction
暂无分享,去创建一个
[1] Joao Auada Junior,et al. Last Planner as a Site Operations Tool , 1998 .
[2] Onur Behzat Tokdemir,et al. Scheduling system for high rise building construction , 2002 .
[3] Nashwan Dawood,et al. 4D visualisation development: Real life case studies , 2002 .
[4] Bonsang Koo,et al. Industry Foundation Classes for Project Management - A Trial Implementation , 1999, J. Inf. Technol. Constr..
[5] Z Mallasi,et al. A generic inclusion of space strategies with activity execution patterns in 4D tools , 2003 .
[6] Sou-Sen Leu,et al. GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .
[7] Lauri Koskela,et al. Reforming project management: The role of planning, execution and controlling , 2001 .
[8] David E. Wilkins,et al. Extending Artificial Intelligence Techniques for Hierarchical Planning , 1991 .
[9] Heung-Fai Lam,et al. Web-Based Information Management System for Construction Projects , 2002 .
[10] Julio C. Martinez,et al. Stroboscope: State and resource based simulation of construction processes. , 1996 .
[11] Nashwan Dawood,et al. Lean enterprise web-based information system for construction (LEWIS): a framework , 2002 .
[12] Ali Jaafari. Time and priority allocation scheduling technique for projects , 1996 .
[13] Kwok-wing Chau,et al. Application of data warehouse and Decision Support System in construction management , 2003 .
[14] Daniel W. Halpin,et al. Real world applications of construction process simulation , 1999, WSC '99.
[15] Jonathan Jingshen Shi,et al. Object-oriented resource-based planning method (ORPM) for construction , 2000 .
[16] Graham Winstanley,et al. Model‐Based Planning: Scaled‐Up Construction Application , 1993 .
[17] Heng Li,et al. Using machine learning and GA to solve time-cost trade-off problems , 1999 .
[18] Frank Harris and Ronald McCaffer. Modern Construction Management , 1977 .
[19] Glenn Ballard,et al. LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .
[20] Nashwan Dawood,et al. Genetic algorithms for multi-constraint scheduling: an application for the construction industry , 2003 .
[21] Ali Jaafari,et al. Towards a smart project management information system , 1998 .
[22] Glenn Ballard,et al. PARC: A Case Study , 1996 .
[23] Sherif Ali Mohtady Mohamed,et al. INDICATORS OF DESIGN AND DOCUMENTATION DEFICIENCY , 1997 .
[24] Herman Steyn. An investigation into the fundamentals of critical chain project scheduling , 2001 .
[25] Yvan J. Beliveau,et al. SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .
[26] William J. O'Brien,et al. SEEK: Accomplishing enterprise information integration across heterogeneous sources , 2002, J. Inf. Technol. Constr..
[27] Nashwan Dawood,et al. Requirements identification for 4D constraintbased construction planning and control system , 2002 .
[28] Mark J. Clayton,et al. Anticipating reuse: documenting buildings for operations using web technology , 2002 .
[29] Bonsang Koo,et al. Feasibility study of 4D CAD in commercial construction , 2002 .
[30] Daniel W. Halpin,et al. Planning and analysis of construction operations , 1992 .
[31] Martin Fischer,et al. Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .
[32] Rafael Sacks,et al. Building Project Model Support for Automated Labor Monitoring , 2003 .
[33] Iris D. Tommelein,et al. WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .
[34] Robert Amor,et al. Misconceptions About Integrated Project Databases , 2001, J. Inf. Technol. Constr..
[35] P. Finlay. Introducing Decision Support Systems , 1994 .
[36] Lee E. Heindel,et al. P++: a prototype PC-based enterprise management system , 1997 .
[37] Asbjørn Rolstadås. Planning and control of concurrent engineering projects , 1995 .
[38] Russell Kenley,et al. Aa Lean Approach to Construction: an Historical Case Study , 1997 .
[39] Nashwan Dawood,et al. Product and process integration for 4D visualisation at construction site level: A Uniclass-driven approach , 2002 .
[40] David Greenwood,et al. An efficient method for scheduling construction projects with resource constraints , 2001 .
[41] Ivan Howitt,et al. Wireless communication and computing at the construction jobsite , 1998 .
[42] Steve Rowlinson,et al. Integration of virtually real construction model and design-for-safety-process database , 2002 .
[43] Robert D. Logcher,et al. Integrating CAD with Construction‐Schedule Generation , 1991 .
[44] Nashwan Dawood,et al. Next generation of construction planning and control: The LEWIS approach , 2002 .
[45] Peter E.D. Love,et al. An application of the Internet-based project management system , 2001 .
[46] Ali Jaafari. Criticism of CPM for Project Planning Analysis , 1984 .
[47] Tarek Hegazy,et al. Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .
[48] Leonhard E. Bernold. Bar code−driven equipment and materials tracking for construction , 1990 .
[49] Jouko E. Pakanen,et al. A Web-Based Information System For Diagnosing, Servicing And Operating Heating Systems , 2001, J. Inf. Technol. Constr..
[50] Gregory A. Howell,et al. SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .
[51] Sherif Ali Mohtady Mohamed,et al. An empirical investigation of users' perceptions of web-based communication on a construction project , 2003 .
[52] Nashwan Dawood,et al. DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .
[53] M Stone,et al. Multi-stakeholder collaboration: The CIFE iRoom , 2002 .
[54] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[55] Nashwan Dawood,et al. AN INDUSTRIAL EVALUATION OF THE VIRTUAL CONSTRUCTION SITE (VIRCON) TOOLS , 2003 .
[56] Eliyahu M. Goldratt,et al. What is this thing called theory of constraints and how should it be implemented , 1990 .
[57] Jon H. Pittman,et al. A software industry perspective on AEC information models for distributed collaboration , 1999 .
[58] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[59] Eddy M. Rojas,et al. WEB-CENTRIC SYSTEMS: A NEW PARADIGM FOR COLLABORATIVE ENGINEERING , 1999 .
[60] Willy Herroelen,et al. On the merits and pitfalls of critical chain scheduling , 2000 .
[61] A. Thorpe,et al. Mobile communications for on-site collaboration , 2002 .
[62] Burcu Akinci,et al. Formalization and Automation of Time-Space Conflict Analysis , 2002 .
[63] Mustafa Pultar. Progress-based construction scheduling , 1990 .