Multi-constraint information management and visualisation for collaborative planning and control in construction

In complex and concurrent construction projects, reliable planning becomes a centre for effective collaboration across upstream supply chains and downstream operations at the work face. Thousands of literatures in construction planning have been published over the past 50 years; introducing, testing, and implementing mountain of techniques and tools. However, they are very fragmented and have not yet provided a universal system that remedies a typical problem of separation of execution from planning. To solve this puzzle, this paper introduced a new methodology called ‘multi-constraint planning’, which possesses five superior characteristics including (1) collaborative and multi-level planning; (2) multi-constraint consideration; (3) effective uncertainty handling; (4) appropriate visual representation; and (5) practicable optimisation. An integrated decision support system that incorporates web-based and mobile information management system, 4D-visualisation system, and evolutionary optimisation system is successfully developed as an enabler for implementation of the proposed methodology. The two modules of information management and visualisation are detailed and demonstrated in the paper. It is envisaged that successful implementation of this system will enable generation of reliable plans and constraint-free execution assignments, in turn, reduce production risks and improve on-site productivity.

[1]  Joao Auada Junior,et al.  Last Planner as a Site Operations Tool , 1998 .

[2]  Onur Behzat Tokdemir,et al.  Scheduling system for high rise building construction , 2002 .

[3]  Nashwan Dawood,et al.  4D visualisation development: Real life case studies , 2002 .

[4]  Bonsang Koo,et al.  Industry Foundation Classes for Project Management - A Trial Implementation , 1999, J. Inf. Technol. Constr..

[5]  Z Mallasi,et al.  A generic inclusion of space strategies with activity execution patterns in 4D tools , 2003 .

[6]  Sou-Sen Leu,et al.  GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .

[7]  Lauri Koskela,et al.  Reforming project management: The role of planning, execution and controlling , 2001 .

[8]  David E. Wilkins,et al.  Extending Artificial Intelligence Techniques for Hierarchical Planning , 1991 .

[9]  Heung-Fai Lam,et al.  Web-Based Information Management System for Construction Projects , 2002 .

[10]  Julio C. Martinez,et al.  Stroboscope: State and resource based simulation of construction processes. , 1996 .

[11]  Nashwan Dawood,et al.  Lean enterprise web-based information system for construction (LEWIS): a framework , 2002 .

[12]  Ali Jaafari Time and priority allocation scheduling technique for projects , 1996 .

[13]  Kwok-wing Chau,et al.  Application of data warehouse and Decision Support System in construction management , 2003 .

[14]  Daniel W. Halpin,et al.  Real world applications of construction process simulation , 1999, WSC '99.

[15]  Jonathan Jingshen Shi,et al.  Object-oriented resource-based planning method (ORPM) for construction , 2000 .

[16]  Graham Winstanley,et al.  Model‐Based Planning: Scaled‐Up Construction Application , 1993 .

[17]  Heng Li,et al.  Using machine learning and GA to solve time-cost trade-off problems , 1999 .

[18]  Frank Harris and Ronald McCaffer Modern Construction Management , 1977 .

[19]  Glenn Ballard,et al.  LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .

[20]  Nashwan Dawood,et al.  Genetic algorithms for multi-constraint scheduling: an application for the construction industry , 2003 .

[21]  Ali Jaafari,et al.  Towards a smart project management information system , 1998 .

[22]  Glenn Ballard,et al.  PARC: A Case Study , 1996 .

[23]  Sherif Ali Mohtady Mohamed,et al.  INDICATORS OF DESIGN AND DOCUMENTATION DEFICIENCY , 1997 .

[24]  Herman Steyn An investigation into the fundamentals of critical chain project scheduling , 2001 .

[25]  Yvan J. Beliveau,et al.  SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .

[26]  William J. O'Brien,et al.  SEEK: Accomplishing enterprise information integration across heterogeneous sources , 2002, J. Inf. Technol. Constr..

[27]  Nashwan Dawood,et al.  Requirements identification for 4D constraintbased construction planning and control system , 2002 .

[28]  Mark J. Clayton,et al.  Anticipating reuse: documenting buildings for operations using web technology , 2002 .

[29]  Bonsang Koo,et al.  Feasibility study of 4D CAD in commercial construction , 2002 .

[30]  Daniel W. Halpin,et al.  Planning and analysis of construction operations , 1992 .

[31]  Martin Fischer,et al.  Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .

[32]  Rafael Sacks,et al.  Building Project Model Support for Automated Labor Monitoring , 2003 .

[33]  Iris D. Tommelein,et al.  WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .

[34]  Robert Amor,et al.  Misconceptions About Integrated Project Databases , 2001, J. Inf. Technol. Constr..

[35]  P. Finlay Introducing Decision Support Systems , 1994 .

[36]  Lee E. Heindel,et al.  P++: a prototype PC-based enterprise management system , 1997 .

[37]  Asbjørn Rolstadås Planning and control of concurrent engineering projects , 1995 .

[38]  Russell Kenley,et al.  Aa Lean Approach to Construction: an Historical Case Study , 1997 .

[39]  Nashwan Dawood,et al.  Product and process integration for 4D visualisation at construction site level: A Uniclass-driven approach , 2002 .

[40]  David Greenwood,et al.  An efficient method for scheduling construction projects with resource constraints , 2001 .

[41]  Ivan Howitt,et al.  Wireless communication and computing at the construction jobsite , 1998 .

[42]  Steve Rowlinson,et al.  Integration of virtually real construction model and design-for-safety-process database , 2002 .

[43]  Robert D. Logcher,et al.  Integrating CAD with Construction‐Schedule Generation , 1991 .

[44]  Nashwan Dawood,et al.  Next generation of construction planning and control: The LEWIS approach , 2002 .

[45]  Peter E.D. Love,et al.  An application of the Internet-based project management system , 2001 .

[46]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[47]  Tarek Hegazy,et al.  Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .

[48]  Leonhard E. Bernold Bar code−driven equipment and materials tracking for construction , 1990 .

[49]  Jouko E. Pakanen,et al.  A Web-Based Information System For Diagnosing, Servicing And Operating Heating Systems , 2001, J. Inf. Technol. Constr..

[50]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[51]  Sherif Ali Mohtady Mohamed,et al.  An empirical investigation of users' perceptions of web-based communication on a construction project , 2003 .

[52]  Nashwan Dawood,et al.  DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .

[53]  M Stone,et al.  Multi-stakeholder collaboration: The CIFE iRoom , 2002 .

[54]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[55]  Nashwan Dawood,et al.  AN INDUSTRIAL EVALUATION OF THE VIRTUAL CONSTRUCTION SITE (VIRCON) TOOLS , 2003 .

[56]  Eliyahu M. Goldratt,et al.  What is this thing called theory of constraints and how should it be implemented , 1990 .

[57]  Jon H. Pittman,et al.  A software industry perspective on AEC information models for distributed collaboration , 1999 .

[58]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[59]  Eddy M. Rojas,et al.  WEB-CENTRIC SYSTEMS: A NEW PARADIGM FOR COLLABORATIVE ENGINEERING , 1999 .

[60]  Willy Herroelen,et al.  On the merits and pitfalls of critical chain scheduling , 2000 .

[61]  A. Thorpe,et al.  Mobile communications for on-site collaboration , 2002 .

[62]  Burcu Akinci,et al.  Formalization and Automation of Time-Space Conflict Analysis , 2002 .

[63]  Mustafa Pultar Progress-based construction scheduling , 1990 .