The Inclusion of Dynamic Factors in Statistical Power System Cost Models Part I: Assessment of Startup and Banking Costs

Methods are developed for approximating dynamic aspects of power system costs within the load duration and probabilistic framework. The approach uses a transition-frequency function, as applied in frequency and duration methods of system reliability assessment, together with a function expressing the RMS prediction error in load forecasting. The author shows how the transition-frequency function can be used to estimate plant startup and banking costs under various conditions. He demonstrates how the calculations can be performed in terms of cumulants of the functions involved, making possible a very efficient formulation. >

[1]  M. J. H. Sterling,et al.  Power system control , 1986, Fifth European Solid State Circuits Conference - ESSCIRC 79.

[2]  Tharam S. Dillon,et al.  An error correction algorithm for stochastic production costing , 1988 .

[3]  Roy Billinton,et al.  Power system reliability evaluation , 1970 .

[4]  Jeremy Bloom,et al.  Long Range Generation Planning With Limited Energy and Storage Plants Part I: Production Costing , 1983, IEEE Transactions on Power Apparatus and Systems.

[5]  L. R. Noyes Two-Area Probabilistic Production Costing by the Method of Bi-variant Cumulants , 1983, IEEE Power Engineering Review.

[6]  N.S. Rau,et al.  Expected Energy Production Costs by the Method of Moments , 1980, IEEE Transactions on Power Apparatus and Systems.

[7]  Michael C. Caramanis,et al.  Probabilistic production costing , 1983 .