A TWO-LEVEL SDDP SOLVING STRATEGY WITH RISK-AVERSE MULTIVARIATE RESERVOIR STORAGE LEVELS FOR LONG TERM POWER GENERATION PLANNING
暂无分享,去创建一个
[1] John D. C. Little,et al. The Use of Storage Water in a Hydroelectric System , 1955, Oper. Res..
[2] Ross N. Brudenell,et al. Economic Complementary Operation of Hydro Storage and Steam Power in the Integrated TVA System , 1959, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[3] Y. Larsson,et al. Incremental Cost of Water Power , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[4] Stuart E. Dreyfus,et al. Applied Dynamic Programming , 1965 .
[5] Jakob Rosing,et al. Composite Representation of a Multireservoir Hydroelectric Power System , 1970 .
[6] A. Askew. Optimum Reservoir Operating Policies and the Imposition of a Reliability Constraint , 1974 .
[7] R. H. Hicks,et al. Large Scale, Nonlinear Optimization of Energy Capability for the Pacific Northwest Hydroelectric System , 1974 .
[8] M. Sniedovich. Reliability‐constrained reservoir control problems: 1. Methodological issues , 1979 .
[9] John R. Birge,et al. Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs , 1985, Oper. Res..
[10] Mario V. F. Pereira,et al. A Risk-Constrained Stochastic Dynamic Programming Approach to the Operation Planning of Hydrothermal Systems , 1985, IEEE Power Engineering Review.
[11] P. R. H. Sales,et al. Coordinating the Energy Generation of the Brazilian National Hydrothermal Electrical Generating System , 1986 .
[12] M. V. F. Pereira,et al. Multi-stage stochastic optimization applied to energy planning , 1991, Math. Program..
[13] A. Gjelsvik,et al. Stochastic dual dynamic programming for seasonal scheduling in the Norwegian power system , 1992 .
[14] Gerd Infanger,et al. Cut sharing for multistage stochastic linear programs with interstage dependency , 1996, Math. Program..
[15] David P. Morton,et al. An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling , 1996, Ann. Oper. Res..
[16] R. Frowd,et al. A coordinated approach for real-time short term hydro scheduling , 1996 .
[17] Francisco D. Galiana,et al. Systems to optimise conversion efficiencies at Ontario Hydro's hydroelectric plants , 1997 .
[18] Warrren B Powell,et al. Convergent Cutting-Plane and Partial-Sampling Algorithm for Multistage Stochastic Linear Programs with Recourse , 1999 .
[19] J. M. Damázio,et al. Chain of Optimization Models for Setting the Energy Dispatch and Spot Price in the Brazilian System , 2001 .
[20] Jery R. Stedinger,et al. Reservoir optimization using sampling SDP with ensemble streamflow prediction (ESP) forecasts , 2001 .
[21] Birger Mo,et al. Integrated risk management of hydro power scheduling and contract management , 2001 .
[22] D.M. Falcao,et al. Stochastic streamflow model for hydroelectric systems using clustering techniques , 2001, 2001 IEEE Porto Power Tech Proceedings (Cat. No.01EX502).
[23] Hugh Rudnick,et al. Short-term hydrothermal generation scheduling model using a genetic algorithm , 2003 .
[24] Karen A. Loveland,et al. LARGE SCALE , 1991 .
[25] John R. Birge,et al. The Abridged Nested Decomposition Method for Multistage Stochastic Linear Programs with Relatively Complete Recourse , 2006, Algorithmic Oper. Res..
[26] Andrew B. Philpott,et al. On the convergence of stochastic dual dynamic programming and related methods , 2008, Oper. Res. Lett..
[27] C. Sagastizábal,et al. A robust approach to handle risk constraints in mid and long-term energy-planning of hydro-thermal systems , 2008 .
[28] M.E.P. Maceira,et al. TEN YEARS OF APPLICATION OF STOCHASTIC DUAL DYNAMIC PROGRAMMING IN OFFICIAL AND AGENT STUDIES IN BRAZIL - DESCRIPTION OF THE NEWAVE PROGRAM , 2008 .
[29] René Henrion,et al. A model for dynamic chance constraints in hydro power reservoir management , 2010, Eur. J. Oper. Res..
[30] M.E.P. Maceira,et al. SELECTIVE SAMPLING APPLIED TO LONG-TERM HYDROTHERMAL GENERATION PLANNING , 2011 .
[31] Vitor L. de Matos,et al. Dynamic sampling algorithms for multi-stage stochastic programs with risk aversion , 2012, Eur. J. Oper. Res..
[32] M.E.P. Maceira,et al. Multi-Lag Benders Decomposition for Power Generation Planning with Nonanticipativity Constraints on the Dispatch of LNG Thermal Plants , 2013 .
[33] Claudia A. Sagastizábal,et al. Risk-averse feasible policies for large-scale multistage stochastic linear programs , 2013, Math. Program..
[34] Alexander Shapiro,et al. Risk neutral and risk averse Stochastic Dual Dynamic Programming method , 2013, Eur. J. Oper. Res..
[35] T. C. Justino,et al. Application of CVaR risk aversion approach in the expansion and operation planning and for setting the spot price in the Brazilian hydrothermal interconnected system , 2014, 2014 Power Systems Computation Conference.
[36] David P. Morton,et al. Evaluating policies in risk-averse multi-stage stochastic programming , 2014, Mathematical Programming.
[37] A. C. G. Melo,et al. Application of stochastic programming and probabilistic analyses as key parameters for real decision making regarding implementing or not energy rationing - a case study for the Brazilian hydrothermal interconnected system , 2016, 2016 Power Systems Computation Conference (PSCC).