Using an artificial neural network prediction model to optimize work-in-process inventory level for wafer fabrication

A proper selection of a work-in-process (WIP) inventory level has great impact onto the productivity of wafer fabrication processes, which can be properly used to trigger the decision of when to release specific wafer lots. However, the selection of an optimal WIP is always a tradeoff amongst the throughput rate, the cycle time and the standard deviation of the cycle time. This study focused on finding an optimal WIP value of wafer fabrication processes by developing an algorithm integrating an artificial neural network (ANN) and the sequential quadratic programming (SQP) method. With this approach, it offered an effective and systematic way to identify an optimal WIP level. Hence, the efficiency of finding the optimal WIP level was greatly improved.

[1]  Mauricio G. C. Resende,et al.  A scheduling rule for job release in semiconductor fabrication , 1988 .

[2]  Samuel H. Huang,et al.  Neural-expert hybrid approach for intelligent manufacturing: a survey , 1995 .

[3]  Cl Huang,et al.  The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks , 1999 .

[4]  Godwin J. Udo,et al.  Neural networks applications in manufacturing processes , 1992 .

[5]  Yu-Hsin Lin,et al.  A total standard WIP estimation method for wafer fabrication , 2001, Eur. J. Oper. Res..

[6]  David J. C. MacKay,et al.  Bayesian Interpolation , 1992, Neural Computation.

[7]  George S. Dulikravich,et al.  Chemical Composition Design of Superalloys for Maximum Stress, Temperature, and Time-to-Rupture Using Self-Adapting Response Surface Optimization , 2005 .

[8]  Chao-Ton Su,et al.  The optimization of multi‐response problems in the Taguchi method , 1997 .

[9]  Rajan Suri,et al.  From CAN-Q to MPX: Evolution of Queuing Software for Manufacturing , 1995 .

[10]  Chih-Hung Tsai,et al.  The study of applying ANP model to assess dispatching rules for wafer fabrication , 2008, Expert Syst. Appl..

[11]  Prasun Das CONCURRENT OPTIMIZATION OF MULTIRESPONSE PRODUCT PERFORMANCE , 1999 .

[12]  David Y. Burman,et al.  Performance analysis techniques for IC manufacturing lines , 1986, AT&T Technical Journal.

[13]  R. H. Myers,et al.  Response Surface Methodology: Process and Product Optimization Using Designed Experiments , 1995 .

[14]  J. A. Buzacott,et al.  The role of inventory banks in flow-line production systems , 1971 .

[15]  C. R. Glassey,et al.  Dynamic batching heuristic for simultaneous processing , 1991 .

[16]  David D. Yao,et al.  A queueing network model for semiconductor manufacturing , 1996 .

[17]  D.A. Hodges,et al.  Benchmarking Semiconductor Manufacturing , 1997, 27th European Solid-State Device Research Conference.

[18]  David J. Miller,et al.  Simulation of a semiconductor manufacturing line , 1990, CACM.

[19]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[20]  James E. Rumbaugh,et al.  An object-oriented relational database , 1990, CACM.

[21]  Robin G. Qiu,et al.  Virtual production line based WIP control for semiconductor manufacturing systems , 2005 .

[22]  R. Atherton,et al.  Signature Analysis: Simulation of Inventory, Cycle Time, and Throughput Trade-Offs in Wafer Fabrication , 1986 .

[23]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[24]  Hung-Chang Liao,et al.  A data envelopment analysis method for optimizing multi-response problem with censored data in the Taguchi method , 2004, Comput. Ind. Eng..

[25]  R.-K. Li,et al.  Integrating order release control with due-date assignment rules , 1997 .